擋水壩 的英文怎麼說
中文拼音 [dǎngshuǐbà]
擋水壩
英文
check dam-
Study and application of plate dam for meeting argent water retaining
板壩式應急擋水子堤方案的研究與應用The first one among spur dikes group in regulation river reach has the most important holdback effect than the others
整治河段中第一根丁壩對水流的阻擋作用最大。The dam was too weak to withhold the pressure of the rising water
水壩不夠牢固,抵擋不住水上漲的壓力。The aswan dam, for example, stopped the nile flooding but deprived egypt of the fertile silt that floods left ? all in return for a giant reservoir of disease which is now so full of silt that it barely generates electricity
比方說,阿斯旺大壩雖然阻擋了尼羅河的洪水但是也奪走了洪水后本能留給埃及的肥沃土壤,而留下來的是一個現在根本不能發電而充滿疾病的巨大的蓄水池。An architect, david suggested building a dam to protect the city from flooding. before the structure was finished, david was framed by his boss and got fired
建築師大衛提議建一道大水壩抵擋洪水威脅,但未完工他便被無良老闆辭去。The dam was not strong enough to hold back the flood waters.
水壩不夠堅固,擋不住洪水。The aswan dam, for example stopped the nile flooding but deprived egypt of the fertile silt that floods left - all in return for a giant reservoir of disease which is now so full of silt that it barely generates electricity
比如阿斯旺大壩,阻擋了尼羅河的洪水,但卻使埃及失去了洪水所能留下來的肥沃的淤泥,所有的這一切都是為了換得一個巨型的但卻(給人們帶來)疾病叢生的水庫,這個水庫現在充滿了那麼多的淤泥,基本上它已無法發電。Comparison of water level between measured and computation shows that the local head loss coefficient cannot give head loss by spur dike completely, and the effective area of passage is difficult to be ascertain. for this reason the two methods for water surface profile computation cannot predict the raise of water level upstream the spur dike accurately
計算結果表明,局部水頭損失系數並不能完全反映出由於丁壩阻擋所帶來的水頭損失,而丁壩附近的有效過水面積難以準確地確定,這些導致前兩種方法均不能很好地計算出丁壩上游水位的壅高值。As a new type of impervious wall material, the geomembrane is to be used in the central core earth and rockfill dams. in this thesis, the engineering characteristics of geomembrane are mainly investigated. the reliability of impermeability, the durability, the deformation adaptability and the proper application range of geomembrane are discussed
本文重點研究了土工膜作為一種新型防滲材料應用於土石壩防滲心墻的工程特性,探討其在土石壩擋水運行期間防滲的可靠性、耐久性、變形能力及其適用范圍。Yunfeng hydroelectric power station dam downstream face reinforcement project design construction
雲峰水電站擋水壩下游面加固工程的設計與施工According to the structure layout of futang power station design, geological parameters and calculation results of seepage, the stability and stress of gate chamber and retaining dam are calculated, the security index and stress of anti - slide can can meet the requirement of criterion
根據福堂電站工程設計的結構布置情況、地質參數及滲流計算成果,對閘室和擋水壩穩定、應力進行了計算,其抗滑穩定安全系數及應力標準均滿足規范的要求。5 ) to solve the uncertain modeling problem about hydraulic buildings, a new modeling method named aggregation modeling based on graph object technique is put forward. as a result, the graph model of solid gravity dam is designed. the graph object of water _ proof dam section taken as an example, the design and implement of self defined graph object is discussed
5 )根據水工建築物不定型建模的特點,提出一種基於圖形對象技術的聚合建模方法,詳細討論了聚合建模法的基本原理;設計了實體重力壩的圖形對象模型,並以擋水壩段圖形對象的設計為例,研究了自定義圖形對象的設計和實現;基於objectarx的通知? ?反應機制,採用數據庫反應器和對象反應器,建立了圖形對象的互動操作機制;以擋水壩段斷面優化設計為例,研究了圖形對象和分析、計算功能的集成方案。Chinese scientists say that as the dam blocks silt heading downstream, the yangtze river estuary region, which includes shanghai, is shrinking and salt water from the ocean is flowing further inland
中國的科學家稱,大壩阻擋了淤泥流向下游,使包括上海地區在內的長江入海口收縮,海洋的鹹水正在倒灌入內陸。The dam was not strong enough to hold back the flood waters
水壩不太堅固,擋不住洪水分享友人