擬大洋的 的英文怎麼說
中文拼音 [nǐdàyángde]
擬大洋的
英文
paraoceanic-
We can use the mm5 model in definite time, definite area weather forecasting. we conclude that : : the moving route of this necw in its developing progress was direct - south along latitude, the cold air is rough, and just this made the rough vertical velocity ; the necw southern moving and conflicting with the west pacification sub - tropical high makes rough jet steam. the plenty south - west warm and wet air made by the jet stream gave the rainstorm demanded vapor ;. the rough vertical velocity by jet stream is a main reason in this rainstorm ; the mm5 model uses four - direction analysis data as its input, this avoids some errors occurred in observe and transfer, thus made the result more useful
綜合分析認為: ( 1 ) 、這次冷渦在其發生發展過程中,其移動路徑是沿經圈直線南壓,攜帶的冷空氣勢力較強,形成槽后較強的垂直運動; ( 2 ) 、西太平洋副熱帶高壓偏北位置與東北冷渦南壓形成的急流軸,把源源不斷的西南暖濕氣流輸送到遼西地區,也就是急流軸的左前方位置,為這次暴雨的產生提供了充足的水汽來源; ( 3 ) 、低空急流不但為暴雨輸送水汽,其造成的較強的垂直環流也是產生強降水的一個主要原因; ( 4 ) 、 mm5模式以四維同化資料作為初始場,最大限度地避免了觀測誤差可能造成的積分不穩定,提高了模擬結果的參考價值。The content of the study as follow : 1 to choice the ship form, mainly ship ' s overall size ; draft, according to design of shanghai deep - water port and development of container ; 2. to deside the date of width ; depth ; path ; tract and sinkage through simulator tests ; 3. to replenish and modify some date for channel design to very large container vessels in " design code of general layout for sea port " 4. to study ship ' s turning area ; ship ' s stop distance the new and special content of the study as follow : 1. statistics of path at the channel given by difference operators with the affections certain wind. currents. seas and other influences shows the path really needed under certain condition
並可在各類航道和水域的通航安全評估及操船方法,航跡帶寬度,航道寬度,航跡帶分佈,船舶各種航行狀態時的下沉量研究中應用。本課題研究的內容: ( 1 )根據洋山深水港設計規劃和集裝箱船舶的發展趨勢,通過研究、分析、比較,選擇最合適的船型,尤其是船舶主尺度和船舶吃水。 ( 2 )在大量模擬研究情況下,得出進港航道所需的航道寬度和深度。" since the impact on the natural topography and vegetation on hei ling chau will be minimal, the conservation potential of hei ling chau and the nearby sunshine island will not be affected, " the spokesman said. he added that the bridge would run from the northwest corner of hei ling chau to the eastern end of mui wo ferry pier road at mui wo
發言人補充說:擬建的渡海橋梁會從喜靈洲的西北角伸延至梅窩的梅窩碼頭路東端,優點是對梅窩現有和計劃中的土地用途、南大嶼郊野公園及陸上和海洋生態的影響輕微,這個方案亦不會影響梅窩的現有考古地點。The updated model with complete forcing has excellent ability of simulation and forecast. to study yellow and east china circulation in winter and summer, based on long - term ocean observation data of january and august, the fine structure of yellow and east china seas circulation is diagnostically calculated with complete forcing ( including surface wind stress, boundary transportation, baroclinic effect, tide, changjiang river runoff ) in winter. the influences of factors on main circulation patterns are discussed respectively
對于冬季和夏季海洋環流的情況,在多年觀測的溫鹽資料基礎上,分別以1月份和8月份代表黃東海冬季和夏季的情況,以月平均大氣風應力、邊界流輸送、溫鹽斜壓效應、潮汐、長江口徑流等作為強迫條件,對黃東海環流的細微結構作了高分辨的三維數值模擬,探討了各因子對冬、夏季主要流系的動力學作用。For the inaugural flight, the rocket, made by the boeing company, will carry a 13, 000 - pound dummy satellite and then crash into the atlantic ocean
在由波音公司研製的該型火箭的初次發射中,其將攜帶1萬三千磅的模擬衛星並將最終墜毀于大西洋中。An ocean model developed by the bergen university in norway ( bom, bergen ocean model ) was coupled with a state of art sea ice model csim4 ( community sea ice model version 4 ). the coupled model was used to simulate the arctic ocean sea ice climate variability
對挪威卑爾根大學發展的海洋模式bom ( bergenoceanmodel )與集成最新海冰模式發展成果的海冰模式csim4 ( communityseaicemodelversion4 )進行了耦合,對北極海冰的氣候變率進行了模擬。The deep bay coastal road ( dbcr ) to link the hksar landing points of the swc and the ldyb
擬興建后海灣海岸公路,把深港西部通道及伶仃洋大橋在香港的著陸點連接起來。The first part. task analyse of handling technology design. is explain the place, basic establishments entironment of yangshan port and the conditions basic tenet and technical parameter of design. the second part, project study out. is discuss the design contents the choice of the leading and the assistant engine, the form of the handling mechanisation system, project study out. the third part, size design, is count the berth pass capacity, the amount of handling engine, the area and capacity of yard, road and gate, the worker amount. the fourth part. technology and economy argumentation, commendable project confirm, is confirm the commendable project by technology and economy argumentation. in the end, considering the technology, economy and use. discourse commend the project of rubber - tyred gantry crane. at present. centre government is studying yangshan project, but in handling technology part of container terminal, the design is simply. so this discourse has important consult value. and has important value of economy and community too
第一部分的裝卸工藝設計任務分析主要就洋山港區的地理位置、基礎設施、自然環境,設計前提條件,設計原則以及設計主要技術參數進行說明;第二部分的裝卸工藝方案擬定主要就工藝設計的主要內容,主要機械及輔助機械選擇,裝卸機械化系統組成以及工藝設計方案擬定進行論述;第三部分的裝卸工藝方案規模設計主要就泊位通過能力,裝卸機械臺數,堆場面積及堆存能力,道路及大門,司機及工人人數,工藝流程進行計算分析;第四部分的技術經濟論證及推薦方案確定主要就技術、經濟指標進行對比論證,並在此基礎上確定推薦方案。Because the system error is ineluctable for mode, it is necessary to correct the simulation fielde effectively. in this paper, based on the idea of combined eof correction, the interannual simulation of sea surface wind stress anomalies of the tropical pacific ocean by lap two - level atmosphereic model have been corrected, result of corrected erperiment shows that the corrected field is more similar to the observation field, especially on the distribution of the space. three prediction experiments also shew that correcting scheme of combined eof can improve the interannual prediction veracity of model
在本文中,基於「聯合自然正交展開誤差訂正」的思想,將中科院大氣物理研究所兩層大氣環流模式輸出的熱帶太平洋海表風應力異常的跨年度模擬場進行訂正,訂正試驗的分析結果表明,訂正後的熱帶太平洋海表風應力距平場與相應觀測場年際變率分量的相似程度遠遠好於模式模擬的結果,尤其是在空間分佈方面的改善非常顯著;三組跨年度訂正檢驗結果也表明,訂正後的跨年度預測結果明顯好於模式的預測結果。There are many factors must be desided such as width ; depth ; ship ' s turning area ; ship ' s stop distance during the design of shanghai deep - water channel. very large container vessels. navigating at the channel with the affections certain wind, currents, seas and other influences, may cause more huge damage and expenditures for the accidents without safety operation. some date for channel design to very large container vessels has been gone beyond in " design code of general layout for sea port " and needs to replenish, modify. the purpose of this study is : to choice the ship form, mainly ship ' s overall size ; draft, according to design of shanghai deep - water port and development of container, then to get the date of width and depth of channel through simulator tests
對8000teu 、 5250teu超大型集裝箱船舶的航道寬度設計已超出了該規范的規定范疇,急需補充甚至修改。本課題研究的目的是根據洋山深水港設計規劃和集裝箱船舶的發展趨勢,通過研究、分析、比較,選擇最合適的船型,尤其是船舶主尺度和船舶吃水。在此基礎上,採用船舶操縱模擬器進行航行模擬研究,在大量模擬研究情況下,得出進港航道所需的航道寬度和深度。Although everything is virtual, lu yang once believed that she could find a golden road to glory and dreams
盡管一切都是虛擬的,呂洋卻曾經堅信她找到了一條通向光榮與夢想的金光大道。The impact of the proposed ldyb on water quality is marginal during the dry season with changes in mean water quality parameters of around 0. 5 %
在旱季,擬建伶仃洋大橋對水質的影響有限,平均水質參數的轉變只有約0The most obvious sea temperature difference appears between 500m and 600m and the variable amplitude in southern hemisphere is larger than that in northern hemisphere
模擬的海溫,海溫溫差最明顯的地方出現在500 ? 600米之間。南半球的變化幅度要大於北半球,到海洋深層,海溫溫差變化不是很明顯。Depending on the current tour resources, ocean museum, large library, five star cinemas, plants archive and ceramics museum are planned to build to form deep cultural environment
依託現有旅遊資源,擬建設海洋博物館、大型圖書館、五星級電影院、花草檔案館、陶瓷博物館等,形成濃厚的文化產業氛圍。The government of shanghai city planned to build a deep - water port among qiqu isles in the donghai sea. for the purpose of the transportation between mainland and the port, a span - sea bridge, luyang bridge, was planned to be built
上海市政府規劃在東海中部崎嶇列島的大小洋山建設深水港,為解決陸上與港口之間的交通問題,擬在蘆潮港與大小洋山之間修建跨海大橋。The tuen mun port expressway ( tmpe ) to connect the proposed ldyb to the hksar highway network at black point ( lan kok tsui )
擬興建屯門港口快速公路,把擬建的伶仃洋大橋連接至位於香港特別行政區爛角咀的公路網;Proceeding of modelling studies on the stability and variability of the thermohaline circulation
大洋溫鹽環流的穩定性及變率模擬研究進展It is further pointed out that simulation experiments combined with geology, petrology, geochemistry and geophysics ( especially for high resolution seismic technique ) in studying mantle ( hotspot ) - ridge interaction will play an important role in such reseaches as plume - ridge interactions
在肯定地幔柱假說的基礎上,對洋脊地幔柱(熱點)的模擬實驗以及三大洋中不同擴張脊與熱點相互作用的最新研究作了系統的介紹和評述,指出室內模擬實驗以及地質學、巖石學、地球化學和地球物理學(特別是高解析度的地震技術)的結合研究將是本領域研究的發展趨勢。No one particularly cares about all that computing capacity - except on the few days of the year around the super bowl, or tax day, or perhaps when your organization runs its quarterly massive simulations of the weather patterns over the north pacific
沒人特別關心所有那些硬體的計算能力除了在每年的超級杯( super bowl )或繳稅日期( tax day )的那幾天里,或者可能當您的組織每個季度對北太平洋的天氣形勢進行大規模模擬時才會去關心。The tmsb is proposed to be dual 2 lane and the completion date is subject to the timing of the commissioning of the ldyb and the future land use planning in the proximity
屯門南繞道擬建為雙程雙線行車道,竣工日期要視乎伶仃洋大橋的動工時間及附近地區的未來土地用途規劃而定。分享友人