  1. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水電站區巖的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖的結構特徵及岸坡巖淺表生改造特徵,建立了岸坡巖淺表生改造與岸坡演化模式,分析研究了巖的物理力學性質,採用修正的csmr法對拱肩槽高邊坡的巖質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡穩定性進行了系統分析、計算與評價;應用理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定的規模、出露范圍,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  2. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石損毀情況的現場調查資料,結合有關專家多年的治經驗,總結出的損毀原因及影響因素;對現有穩定性的研究成果進行回顧和總結,並針對散拋石的直接損毀現象,結合山區河流的水流、地形特點,利用粒徑與起動流速的關系,提出穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致穩定重量接近40倍的變化;通過二維變坡水槽試驗,研究了穩定的主要影響因素,包括重量、頂水深、斷面尺寸、材料(石和卵石兩種) 、護底等,結果表明對于山區河流,試圖僅僅通過增加單個重量或斷面尺寸來提高穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性混凝土鉸鏈等一類性較好的護面層作為散拋石的防沖毀措施,以期取得良好的工程效果。
  3. Consequencely, the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, and the back - analysis and the prediction of the parameters of the dam system have been done according to the operating observed data. the research work involves several aspects as follows : 1 ) a back - analysis model including the prior information and a predictive model of nonlinear time series were established ; 2 ) the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, in which the analysis module of the loading effects, the back - analysis module, the forecasting module of the physical parameters and the assessment module of the operating state were contained ; 3 ) according to the operating observed data, the operating state of the dam was assessed and predicted with the analysis system of the operating state, the results suggested that the dam is in basically normal operation at present

    工作有以下幾方面: 1 )收集理漫灣水電站大運行監測資料,並對其進行了系統分析,從觀測資料本身直觀的分析了大的運行狀況; 2 )總結位移反分析的理論及方法,建立了考慮先驗信息多介質位移反分析模型,基於神經網路非線性映射功能,建立了神經網路時間序列預測模型; 3 )以ansys軟為平臺,開發了漫灣水電站砼重力運行狀態評價模,結合荷載效應分析、參數反演分析、參數預測分析三個模組成漫灣水電站砼重力運行狀態分析系統;實現了對漫灣水電站運行狀態的動態「反演-預測」分析; 4 )利用漫灣水電站砼重力運行狀態分析系統,在漫灣大實測資料分析、大砼特性參數反分析、大砼彈性模量衰變規律及預測分析的基礎上,系統的分析並預測了大運行狀態。
  4. The results are important for dam base excavation and engineering disposal. ( 2 ) arch dam can be regarded as an elastic ground cantilever system composed of vertical cantilever, horizontal arch, and torsion structures. the dissertation takes the arch dam as load diversion system of arch - cantilevers system located on the ground composed of elastic cantilever

    ( 2 )將拱虛擬為由座落在有限元上的一系列懸臂梁與水平拱組成,將懸臂梁視作由水平拱所支承的彈性地基梁,考慮徑向和切向調,比以往的彈性地基梁只考慮徑向調有所發展;而且用元模擬基,也能較精確地模擬基多種斷裂構造等對結構行為的影響。