斜斷面 的英文怎麼說

中文拼音 [xiéduànmiàn]
斜斷面 英文
oblique section
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 斷面 : section; fracture surface; plane of fracture
  1. Stability of rock slopes is generally controlled by the structure of rock masses, especially the soft structure surfaces. analysis of rock mass structures is a key to establish geological models and numerical simulation and a foundation to assess the stability of rock slopes. the weak structure surfaces are mainly bedding planes, faults, joints, schistosity plane and contact zones of intrusive bodies. since they are different in genesis and scale, the rock masses are different in features and mechanical intensities. based on the combination of rock structure bodies, 15 basic modes of deformation and failure of rock slope are systematically summarized. the deformation and failure of rock masses actually result from the recombination and rearrangement of these rock bodies. there are 11 types of rock mass structures and various deformation and failure of bank slopes are present in the reservoir area of the three gorge project

    巖體結構,特別是軟弱結構對基巖坡變形與破壞具有顯著的控製作用,巖體結構模式分析是建立坡地質模型和數學模型的關鍵和評價坡穩定性的基礎。巖層層裂構造節理裂隙片理與劈理以及侵入體和圍巖的接觸帶等是控制基巖坡穩定的軟弱結構,這些成因不同大小不一的結構將巖體分割成性質各異力學強度不均的各種巖體結構體,構成了15種基巖坡變形破壞的巖體結構基本模式。不同結構體的重新組合與排列是坡失穩的內在原因。
  2. You will enjoy these breathtaking sights : tunnel view, bridal veil fall, el captain, merced river, yosemite fall, half dome

    公園內著名景緻區如下新娘紗瀑布,船長巨巖,昆仲巖石,金沙江,觀瀑橋,半球巨巖,層飛瀑,
  3. Arrive in yosemite national park after lunch. highlights include : tunnel view, bridal veil falls, el captain, merced river, yosemite falls, half dome. overnight stay in fresno

    公園內著名景緻區以次如下新娘紗瀑布,船長巨巖,昆仲巖石,金沙江,觀瀑橋,半球巨巖,層飛瀑,南眺景等。
  4. You will enjoy these breathtaking sights : tunnel view, bridal veil fall, el captain, merced river, yosemite fall, half dome. the day ends with an overnight stay in central california s top city : fresno

    公園內著名景緻區以次如下新娘紗瀑布,船長巨巖,昆仲巖石,金沙江,觀瀑橋,半球巨巖,層飛瀑,南眺景等。
  5. The author suggests that the three lithosphere - scale faults, lancangjiang fault, jinshanjiang - ailaoshan fault and axis fault in the middle of the basin, are the main geological structures that control the formation of basin, magmatism and metallogenic congregate district. the anticline structure with an axis of triassic strata and the related fault system within the basin, and gonglang arch - shaped folding structure in the south of the basin are the geological structure controlling the formation of ore fields. junctions of two or more faults with different orientation, interlayer cataclastic structural zone and oxidation - reduction ( redox ) boundary were the favorable position for the formation of ore bodies

    認為瀾滄江裂、金沙江-哀牢山裂及盆地中軸裂這三條巖石圈裂是主要的控盆-控巖(巖漿巖)構造及礦集區尺度的控礦構造;盆地中以三疊系為軸的背構造及相關的裂系統、盆地西南緣公郎弧形構造等是礦田尺度的控礦構造;多組裂的交叉、層間破碎帶及地層柱中的氧化還原界是形成礦體的有利部位。
  6. Due to slope cable bears barely alternative load longtime in nature environment, it is easy to corrosion and wreck. seriously, the bridge is possibility to collapse in strictness air empoison, water pollution, seashore and ocean surroundings. therefore, to study cable ’ s corrosion widely and to inhibit corrosion process are very important for increase endurance and safety of bridge construction

    由於拉索長期承受交變載荷並暴露于自然環境中,特別是大氣污染嚴重地區、水污染嚴重地區、海濱及海洋環境,極易發生腐蝕破壞,嚴重者還會因坍塌而造成生命及財產的巨大損失,因此,全研究橋梁拉索的腐蝕,阻腐蝕的成因,對提高橋梁結構的耐久性與安全性具有重要意義。
  7. The fourth chapter introduces the theory of fractional brown movement ( fbm ). the image texture of turning workpiece is analyzed using fbm model. after abstracting the texture character, the cutting tool wear status can be determined according to fractal dimension and average slope of the fitting curve of the logarithm power spectrum

    第四章採用分數布朗運動( fbm )的基本理論,對切削工件表紋理的圖像進行分析,提取紋理特徵參數,根據分形維數和圖像上對數功率譜的擬合曲線的平均率來判刀具的磨損狀態。
  8. For hoods with shutters in four sides, the results show : 1 ) the hoods positively placed boards are called hoods used for venting airflow ; hoods negatively placed boards are called hoods used for leading airflow ; 2 ) among the hoods used for venting airflow, the most effective hoods should have positive declining angle value of 30, the ratio 4 of areas between the four windward faces and the gular section ( fy / fj = 4 ), the value of b range from 70 mm to 120 mm and the value of b / h range from 0. 5 to 0. 6 ; 3 ) the most effective hoods should have negative declining angle value of 60, the ratio 4 of areas between the four windward faces and the gular section ( fy / fj = 4 ), the value of b range from 100 mm to 170 mm ( the optimum value is 120 mm ) and the value of b / h range from 1. 4 to 2. 2 ( the optimum value is 2. 0 )

    對於四設百葉型風帽,計算表明: l )正裝傾擋板的百葉型風帽可認為是排風型風帽,倒裝擋板傾的百葉型風帽可認為是進風型風帽; 2 )排風型風帽中,擋板正裝30 」 、風帽四個迎風的有效積fy和風管凈積fj的比值( fy腸)為4 、擋板寬度b在70inln到120inln之間、板間距比值隴在0 . 5到0 . 6的百葉型風帽排風效果最好; 3 )進風型風帽中,擋板倒裝裝60 「 、風帽四個迎風的有效積和風管凈積的比值( fy例)為4 、擋板寬度b在100咖到170mm之間( 120mm為最佳) 、板間距比值隴在1 . 4到2 . 0的進風型風帽( b爪= 2 . 0為最佳)的百葉型風帽進效果最好。
  9. With the research object of overbank soft clay near the yiluo river, by means of pack drain to accelerate the consolidation of the soft ground and analysis of fourteen selected representative observation section, in the same time with the help of such testing apparatus as settlement plates, deflection inclinometer, piezometer, telescoping tube, my study not only evaluate the effect of pack drain ' s quickening up the consolidation of soft ground impersonalily and scientifically but also sum up the settlement disciplination of overbank soft clay after more than one years ? observation of settlement and stability continuously

    本文以伊洛河河灘相軟土為研究對象,利用沉降板、測管、孔隙水壓力計、分層沉降標等多種測試儀器,選取14個有代表性的觀測,進行了一年多的沉降與穩定觀測。通過對觀測數據的分析,進而對袋裝砂井加速河灘相軟土固結效果進行了客觀、科學的評價,同時推算了沉降系數m _ s和固結度參數,並對河灘相軟土的沉降規律進行了分析。
  10. The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated

    本文利用大變形固結有限元分析程序( lscfea )中的小變形平固結分析單元( sse2 ) ,結合實體工程項目進行了地基固結沉降的有限元計算,分別得出河灘相軟土地基在考慮砂井和未考慮砂井作用下的固結沉降曲線及杭甬高速公路試驗段在高堆載情況下的固結沉降曲線;並對以上曲線特徵進行了分析,得出各時間段曲線率、角度在整個的變化規律,以及沉降最大值與率、角度變化之間的線性回歸關系。
  11. The construction methods and caving protection measures for punching high thick and loosen soft coal seam in luling coal mine no. 2 dark tilt well in huaibei coal mine area are introducded. they include small section enlarged after the heading caving, high negative pressure and multi - raw drilling holes and strenous drawing - off, concentrated cross drill holes, cutting while drawing - off and putting the metal frame away

    介紹了淮北礦區蘆嶺煤礦2主暗井採用小導硐后刷大、高負壓多排鉆強抽,密集交叉鉆孔邊掘邊抽及設置金屬骨架施工方法和防突措施揭穿高突特厚松軟煤層。
  12. Secondly, the finite - element analysis on the typical slope section is performed with establishment of geology model, definition of boundary condition and proper selection of mechanical parameters. the result shows that the slope is of integral stability, and the failure mode mainly comprises infrequent block drop and wedge body breakage. considering the two failure modes of plane failure and wedge body breakage, and stability calculation under different work conditions, the slope stability is discussed and the sensibility ana lysis on its fraction angel and cohesion force is made

    然後通過建立地質模型、確定邊界條件、選擇合理的力學參數,取典型對邊坡進行數值分析,分析結果表明坡整體是穩定的,破壞類型以零星掉塊和楔體失穩下滑為主;為了定量計算邊坡的穩定性,對邊坡兩種破壞類型:單滑下滑和雙滑楔形體下滑,考慮不同工況進行穩定性計算,並對摩擦角和粘聚力進行穩定的敏感性分析。
  13. Secondly, the basic principle on optimal design of structure is presented. based on the characteristics of aqueduct - stayed optimal design, cable optimization, aqueduct body selection optimization and aqueduct body vertical section optimization are included. the prestresses of cable - stayed, the dimension of aqueduct and the number of reinforcing steel bar are chosen as the design variables

    根據拉式渡槽優化設計的特點,本文將槽身優化分為索力優化、槽身橫優化以及槽身縱優化三個方進行優化設計,確定拉索預應力、槽身尺寸、槽身橫向及縱向預應力鋼鉸線配筋數量等槽身設計的主要變量。
  14. Therefore, it might be very essential to study the cable stayed bridge of the super breadth composite beam. additionally, the main problems of the study are as follows : 5 、 the distributing for stress of lengthways and transverse in transect ; 6 、 discussing the change of stress of lengthways and transverse, while the breadth of bridge is changing ; 7 、 in the cable stayed bridge of the super breadth composite beam, the lengthways reinforce rib and rigidity crossbeam exert influence on stress of bridge board ; 8 、 while tower and beam are concretion, main tower affects bridge board

    鑒于目前關於此類橋型研究成果不多,就此作了下列若干問題的研究: 1 、超寬疊合梁拉橋橫上縱向應力分佈和橫向應力分佈特點的研究; 2 、對超寬疊合梁拉橋隨著橋寬變化時,上述兩種應力分佈變化規律進行探討; 3 、在超寬疊合梁拉橋中,縱向加勁肋對橋板受力的影響;橫梁尤其是剛性橫梁在橋板受力中所起的作用; 4 、塔梁固結時,主塔對橋板的作用。
  15. Stress response of the tower wall at the least favorable section of all of the single section on the cable tower anchor segments of the cable - stayed bridge was studied under the annular pre - stress with cable force and tensile force by comparing the experiment results of the full - scale model of segment with the results of the finite element simulation analysis according to the forced status of the cable tower under practical conditions

    摘要通過索塔錨固區節段足尺模型試驗結果和有限元模擬分析比較,結合索塔受力的實際工況,對異型截拉橋索塔錨固區節段最不利在環向預應力與索力共同作用下塔壁的應力響應進行了研究。
  16. - ii - 5. with the consideration that the cross section of the cable - stayed structure and the rigid frame structure ' s are not uniform, a new joint solution was presented for these different sections

    5 、針對金馬大橋拉橋側主梁截與t構側主梁截形式不統一的問題,提出了一種不同結構的新型連接方法。
  17. The main contents are as follows : firstly, the structure and characteristics of aqueduct - stayed are summarized, based on which the structure analysis is presented ; planar structural models are established to simplify the analysis of internal force and displacement of aqueduct - stayed based on moment - distribution theory, the formula to calculate the force of cross section of aqueduct - stayed is derived. the finite element method for framed structures is used to analyze the aqueduct body. and corresponding computer programs are developed

    為便於計算,在計算拉渡槽的內力及變形時,將空間結構簡化為平結構,分別對槽身橫及槽身縱向結陶進行計算:以力矩分配法為基礎推導了槽身橫內力的計算公式;運用直接剛度法,編制了桿系有限元程序進行槽身縱向結構計算,並簡單介紹與拉渡槽相關的剛度法知識以及程序的流程圖。
  18. The main conclusions are as following : 1. specimens have four kinds of fatigue failure characteristics such as normal section crack width and truncated section crack width beyond the limit, the fatigue damage of steel bars. specimens ’ fatigue life is from 15 thousand to 1800 thousand

    主要結論如下: 1 、試件出現了正截裂縫寬度達到限值、裂縫寬度達到限值、鋼筋疲勞裂等疲勞破壞特徵,疲勞壽命介於1 . 5萬次180萬次。
  19. Some methods of evaluation water quality are studied, which are often used in water quality management. an example of estimating dongjiang cross - section is brought forward, which is using the isogradient obscure clustering method

    採用幾種常用的水質評價方法進行效果對比,在對灰色聚類方法進行詳細分析的基礎上,應用等率灰色聚類決策方法,對東江惠州段部分的水質數據進行評價計算。
  20. Standard test method for using a rolling inclinometer to measure longitudinal and transverse profiles of a traveled surface

    用滾動測器測量移動表縱向和橫向的標準試驗方法
分享友人