新行車路線 的英文怎麼說

中文拼音 [xīnhángxiàn]
新行車路線 英文
new traffic routing
  • : Ⅰ形容詞1 (剛出現的或剛經驗到的) new; fresh; novel; up to date 2 (沒有用過的) unused; new 3 (...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 行車 : 行車train working; drive a vehicle行車安全 driving safety; 行車里程 mileage; distance travelled b...
  • 路線 : 1. (從一地到另一地所經過的道路) route; itinerary; way; tail; line 2. (思想上、政治上或工作上所遵循的根本途徑) line
  1. It calculate 60 driving speed kilometers / hour, it design 30 kilometers of speed of deck bridges road, ground of offices / hour, road calculate and load type standard cars standard bzz - 100s, iron do distance to city one for new urban north and southses by mountain path by road surface structure, calculation 40 driving speed kilometer / hour

    計算速度60公里/小時,跨橋處地面道設計速30公里/小時,道面結構計算荷載標準bzz - 100型標準,鐵山城區南北向城市次幹,計算速度40公里/小時。
  2. Realign carriageways leading to the roundabout at san wan road to improve road safety

    劃定通往迴旋處的,以改善道安全。
  3. I drove back to the town and began to retrace the route, taking frequent glances at the map.

    所以我又驅返回那個小鎮,頻頻查看地圖,重駛。
  4. I on the tamshui line, reducing train speed, schedule length, wheel friction and number of carriages from six to three, plus erecting more effective sound barriers along the emergent section close to minchuan west road station

    北投支採取調降速度、減少班次、六組改為三組、輪切削、鋼軌研磨等改善措施;民權西站進入地下段前,增設全罩式隔音墻工程。
  5. Construction of a single - lane road bridge of 70 m in length across the san tin eastern main drainage channel stemdc connecting an existing unnamed road along the eastern side of stemdc near the vha and tyr

    興建長70米並橫跨田東面主要排水道的單橋,以連接沿該主要排水道東面近輛輪候區的現有未命名道與淳裕
  6. Re - alignment of existing carriageways and construction of new at - grade carriageways for the road junction ; and associated drainage, retaining wall and slope works

    為有關口的現有道重,並興建的地面道及進相關的渠務斜坡及護土墻工程。
  7. At about 7. 55 am, a light goods vehicle ( lgv ) was travelling along the new territories bound carriageway of tate s carin highway. upon reaching near shek mun, the vehicle reportedly slowed down to give way to a medium goods vehicle ( mgv ) travelling along another lane when the latter intended to change lane. another lgv following the first lgv allegedly did not stop in time and collided with the first lgv which subsequently rammed the mgv

    當日早上約七時五十五分,一輛輕型貨沿著大老山公界方向駛,駛至石門附近時,據報因有一輛中型貨從另一條切入,故減慢速度,尾隨的另外一部輕型貨收掣不及,於是撞向它。
  8. This paper supplies the theoretical analysis and practical discussion on lateral force & friction from point of view about vehicle suspension and shock absorber itself. it gives a new utility engineering concept called shock absorber stiff coefficient. we also sum up the technology norms and parameters of the test of shock absorber lateral forre & friction property on domestic equipment comprehensively

    該文從輛懸架系統的角度和減振器本體的角度對輛筒式減振器側向受力與摩擦進了理論分析和試驗.提出了減振器硬系數等工程實用概念.文中系統歸納了使用國產設備進減振器側向受力與摩擦臺架試驗的技術與試驗參數
  9. Abstract : this paper supplies the theoretical analysis and practical discussion on lateral force & amp; friction from point of view about vehicle suspension and shock absorber itself. it gives a new utility engineering concept called shock absorber stiff coefficient. we also sum up the technology norms and parameters of the test of shock absorber lateral forre & amp; friction property on domestic equipment comprehensively

    文摘:該文從輛懸架系統的角度和減振器本體的角度對輛筒式減振器側向受力與摩擦進了理論分析和試驗.提出了減振器硬系數等工程實用概念.文中系統歸納了使用國產設備進減振器側向受力與摩擦臺架試驗的技術與試驗參數
  10. The western kerbside lane of the unnamed access road adjacent to fortuna building between kam ping street and the unnamed access road adjacent to metropole building ; and

    毗鄰幸福大樓的未命名通,介乎錦屏街與毗鄰都城大廈的未命名通之間的西面
  11. This paper gives a systematical research on high frequency distortion performance of vehicle shock absorber. we prove that the cavitation specific property is another basic cause of high frequency distortion of vehicle shock absorber. we put forward the new utility engineering theory about saturated a un - saturated high frequency distortion clearly. we also sum up the technology norms of the test of shock absorber cavitation specilic property on domestic equipment comprehensively

    該文對輛筒式減振器高頻畸變特性進了系統研究.揭示並論證了泡沫特性是筒式減振器高頻畸變的另一類重要基本成因,明確地提出飽和與不飽和高頻畸變等工程實用概念.文中還對使用國產設備進減振器泡沫特性臺架試驗的技術了歸納
  12. It is proposed that the lrt system will adopt a standard rail gauge, power supply by overhead wires, main low - floor vehicles in six axes, one or two cars in one train set during the initial stage of revenue service, two or three cars in one train set in the later stage, 90m platform length, certificate payment system, type - b right - of - way on at - grade section, and signalling control for priority passing at intersections, etc

    建議採用之輕軌系統為標準軌距,架空供電之大部分低底板輕軌輛,每列以二輛編組營運,月臺設計長度為60公尺,以付費證明系統收費,平面段采b型權,交叉口以交通號志管制,給予優先通權。二合計之建設成本,以89年幣值估算,約需臺幣131億元。
  13. It is bounded by the lion rock mountain ( sze chi shan ) and tate s cairn ( tai lo shan ) to the north ; the kowloon peak ( fei ngor shan ) to the east ; new clear water bay road and prince edward road east to the south ; and junction road and lion rock tunnel to the west

    北面以獅子山及大老山為界,東臨飛鵝山,南接清水灣道及太子道東,西連聯合道及獅子山隧道。本區現有三條跨區公、多條連接區內各處的區域干和兩條隧道(指其南面的出入口而言) 。
  14. The length of the green line will be 8. 95 kilometers in total, with a 0. 52 - kilometer elevated viaduct section. on the green line, there will be 10 at - grade stations. the line will start from hsinchu chemical station on road no. 5 connecting with the red line at this point, then pass through the downtown area along road no. 5, circle the downtown area along chingkao road and chunghu road, and finally arrive at hsinchu tr station, where it will re - join the red line

    目前研提二個較可,其中南北全長約8 . 15公里,地下段1 . 8公里,平面段6 . 35公里,設八座站,含1座地下站,南端銜接高運量捷運大橋國小站;東西全長約5 . 35公里,高架段1 . 5公里,平面段3 . 85公里,設八座平面站,東端銜接高運量捷運淡水芝山站。
  15. Re - alignment of the upper section of bisney road at its junction with pok fu lam road involving the replacement of existing carriageway with new carriageway partly on elevated structures

    將碧荔道上段與薄扶林道交界處的道,工程包括建造道部分為架空結構,以取代現有
  16. Re - alignment of the upper section of sassoon road at its junction with pok fu lam road involving the replacement of the existing carriageway with new carriageway partly on elevated structures

    將沙宣道上段與薄扶林道交界處的道,工程包括建造道部分為架空結構,以取代現有
  17. Question 8 : after the new station building and tracks put into use, are the old tracks which pass through the old cangkou railway station to be reserved or removed

    站房和投入使用后,經老滄口火站的原有鐵是保留還是拆除?
  18. In this system, we designed some new functions, for example, automatic judge running line, automatic judge running direction, automatic adjust the radius of locomotive wheel. and according to the requirement of the locomotive ' s moving safety, the principle of system reliability design is given, strongly strengthen the system ' s reliability design

    在這套系統中增加了諸如自動判斷、自動判斷駛方向、自動調整機輪徑等以往自動過分相裝置所沒有的的功能,並根據列安全的要求,制定了本系統的可靠性設計原則,重點加強了系統的可靠性設計。
  19. Meanwhile, passengers of gmb and franchised bus services are advised to note the new routeing of these services which may result in longer journey time depending on traffic situation

    及巴士的乘客請留意新行車路線或會因應交通情況而延長時間。
  20. To tie in with the refinement of the government receipt and despatch service, the department reviewed our internal service and rearranged our despatch routes in 20022003 with the result that one of our 5 vehicles was taken out of the service

    為配合政府改善收發服務的措施,本處亦檢討了處內的收發服務,並在二零零二至二零零三年度重安排發送文件的,令提供有關服務的輛由五部減少至四部。
分享友人