斷橋試驗 的英文怎麼說

中文拼音 [duànqiáoshìyàn]
斷橋試驗 英文
bridge cut off test
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 斷橋 : bridge cut-off斷橋繼電器 bridge cutoff relay; 斷橋試驗 bridge cut-off test
  • 試驗 : trial; experiment; test
  1. For the foundation treatment of the experimental segment of the south shore expressway of the hangzhou bay cross sea bridge, the in situ monitoring has been conducted for more than two years by use of vacuum - surcharge preloading

    摘要結合杭州灣跨海大南岸接線高速公路段工程,對真空堆載聯合預壓技術處理的面進行了長達兩年多的現場測
  2. After the vibration test and analysis on the chuhe bridge, we drafted to reinforce the bridge ' s double - pillar type light buttresses. we accomplished the testing buttresse reinforcement while under the premises of without railroad break - off. it outlined one of the optical methods to reinforcing the double - pillar buttresses of the whole bridge

    通過對滁河特大的振動測分析,確定了該雙柱式輕型墩的加固方案,並針對在不中行車的前提下,研究制定了加固施工工藝,高質量地完成了墩的加固工作,為全其他雙柱式墩的加固提供了可供選擇的優良方案。
  3. By compared with the simulation results and the experiment results, we come to the conclusions that : ( 1 ) circuit with assistant network can widen soft - switching extent in lagging arm, reduces duty - cycle loss on the secondary, diminishes switching dissipation of inverter spot - welding power source. ( 2 ) the range of resonant capacitor, the important factor to soft - switching process, not only affects zero - voltage turn - off of power switches, but also affects the range of zero - voltage turn - on of power switches. so resonant capacitors must be considered according to many aspects ; ( 3 ) it easily fulfils soft - switching condition in lagging arm as leakage inductance of power transformer increases, but bigger leakage inductance of power transformer increases opening dissipation of transformer and decreases efficiency of soft - switching inverter power source

    通過模擬結果與軟開關點焊逆變器結果的對比分析,得到了如下主要結論:採用輔助網路可以完全拓寬全軟開關逆變器的滯后臂軟開關范圍,減小了次級占空比丟失,降低了逆變電阻點焊電源的開關損耗;諧振電容是影響軟開關工作狀態的重要因素,其大小不僅影響開關管的零電壓關,同時也影響開關管的零電壓開通范圍,因此,諧振電容應該綜合考慮;功率變壓器漏感越大,越容易滿足滯后臂的軟開關條件,但是大的漏感也使變壓器的通態損耗增加,降低了軟開關逆變器的效率。
  4. Stress response of the tower wall at the least favorable section of all of the single section on the cable tower anchor segments of the cable - stayed bridge was studied under the annular pre - stress with cable force and tensile force by comparing the experiment results of the full - scale model of segment with the results of the finite element simulation analysis according to the forced status of the cable tower under practical conditions

    摘要通過索塔錨固區節段足尺模型結果和有限元模擬分析比較,結合索塔受力的實際工況,對異型截面斜拉索塔錨固區節段最不利面在環向預應力與索力共同作用下塔壁的應力響應進行了研究。
  5. Wavelet analysis has been employed to numerous problems that belong to the general field of bridge structural health monitoring in recent years. nevertheless, most approaches that detect structural damage with wavelet analysis are still on a numerical level, further research is requires to develop engineering tools that can be utilized for a standardized assessment and health monitoring of bridge

    然而,目前小波分析在結構損傷診中的研究大多停留在數值模擬階段,研究較少,在實際應用中的研究基本沒有,因此把小波分析引入梁健康監測的實際應用中是很有必要的。
分享友人