斷裂路程 的英文怎麼說

中文拼音 [duànlièchéng]
斷裂路程 英文
fracture path
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : 裂動詞[方言] (東西的兩部分向兩旁分開) open
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 斷裂 : break; disrupt; flying off; fracture; fragmentation; out break; rift;crack;bursting;rupture;rendi...
  • 路程 : distance travelled; journey
  1. Through the simulation of large - scale circuit simulation proved that use the crossover tearing technology could detailed network structure, simplify the diagnostic process, and the neural network can parallel deal with the diagnosis information, and the logic operation can judge the information of the multi - fault. the illustrative simulation shows that it can increase the diagnosis speed and decrease the workload before test

    通過對大規模模擬電的模擬證明,使用交叉撕明細網結構,簡化診,且運用神經網組對信息進行并行處理,邏輯分析運算對多故障信息進行處理判,大大提高了故障診速度,減小了測前工作量。
  2. Safety of structures is a common and important problem in the mechanical engineering. recent years there is a trend of developing unified theory of fatigue and fracture to describe the life - cycle damage behaviour of structures. researches on safety guarantee are going toward multi - method synthesis, system micromation, network availability and life - cycle information management

    結構的安全性一直是工中普遍關心的重要問題,結構強度學逐漸發展到疲勞統一理論,結構安全保障手段已向多方法、微小化、網化和全壽命在線保障與監測發展,建立全壽命安全保障系統,涉及材料、機械、力學、電子等學科的交叉融合。
  3. When researching the relationship between man and environment, we should pay close attention to the fact behind the deterioration of local ecological environment - the break of culture relationship between man and environment. in the relevant research of the relationship between man and environment, we should stress the importance of local cultural existence and point out the consequence of negligence of local people ' s initiatives by reflection of national construction and economic development. we shall discard the ecology - oriented and man - oriented ideologies amid the rising tide of environmental protection, focusing on the adaptability of local people to local ecological environment, so as to blaze a new trail to sustainable and harmonious development among ecology, economy and culture based on local people ' s initiatives

    在人與環境關系的研究中,應關注當地生態環境惡化的表象背後,存在著人與環境之間文化關系的;希望在相關人與環境之間關系的研究中,注重反思國家建構和經濟發展過中,本土民族文化生存的重要性與主體性地位被忽略的後果;並以此為鑒,在當前呈蓬勃之勢的環境保護浪潮中,摒棄生態中心主義與人類中心主義,關注本土民族與當地生態環境之間存在的文化適應性,從而以當地民族主體性為出發點,探討生態、經濟與文化協調的可持續發展之
  4. Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc

    應用於工的主要方法有反射波法折射波法波速測井面波法及橫波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖體構造褶皺層破碎帶隙帶對于回填工基壩基,地震勘探可以檢測其回填處理效果對于隧道工,可以探測隧道洞體的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。
  5. 2. aiming at the binding relationship between the pavement and the base, the author, by collaborating with related research groups, bring forth for the first time the formation of a weak tran

    2 .提出了面板與基層之間的層間結合關系和六種結合模式,並根據力學的基本原理提出了面板在早期凝結過中,在面層與基層之間形成薄弱過渡層。
  6. Through the research and analysis on the three aspects concerning the base interface of the pavement panel, crack accumulation, expansion in the pavement panel and interaction between spring plates on the road surface as well as its damage on the road fatigue, it is first brought forth that the process of fissures and breakage in the cement concrete pavement can be divided into three stages, i. e. stage of initial crack formation and damage in the bottom of the pavement slab, stage of accumulation, intensifying & expansion in ruptures from load during the time of use and stage of fissures & breakage in the pavement

    通過對面板底界面開面板中縫積聚、擴展和面表面車板相互作用及其對面疲勞破壞的影響等三個層面的研究和分析,首次提出水泥混凝土面的開和破壞過可以分為三個階段,即面板底初始損傷西南交通大學博士研究生學位論文第11頁和早期縫的形成階段、使用期間荷載作用對面造成的開損傷累計、加劇和縫擴展階段以及破壞階段。
  7. The research of high performance pavement concrete ( hppc ) is done in two sides. one is mixture design, the other is pavement performance. the mixture design and design flowchart of hppc is given on the base of nc with the consideration of characteristic of both hppc and nc. the grow law, influencing factor and formation mechanism of hppc strength is analisised by perpendicular experiment. in the same, the fatigue equations are set up for hppc and hppc i on the base of fatigue experiment. the fatigue mechanism of hppc is analysised by damage mechanics and fracture mechanics. brittleness, frost resistance and abrasion resistance of hppc is researched with the camparition to nc i. at last, the economic analysis of hppc is done by two kinds of way

    結合高性能混凝土與普通面混凝土的特點,提出了建立在普通面混凝土基礎上的高性能面混凝土配合比設計方法,給出了設計流;通過正交試驗(強度試驗) ,分析了高性能面混凝土的強度發展規律、影響因素與形成機理;同時,根據疲勞試驗結果採用雙參數weibull分佈模型分別建立了高性能面混凝土和高性能面混凝土(沒有摻加硅粉)疲勞方,應用損傷力學和力學,分析了高性能面混凝土的疲勞機理;並採用了對比分析方法,研究了高性能面混凝土的脆性、抗凍性和耐磨性等。
  8. According to the geological conditions of baise project, erosive bands and joint fissures, f6 fault and grout curtain are fully simulated to establish 3d numerical model of the dam and its foundation. 3d non - linear fem is used to analyze the stress and strain and to appraise the operation state of both the dam and it ' s foundation under different operation conditions. by overloading the upstream water level and reducing rock strength parameter, the dam foundation ' s degradation process is simulated and the damage pattern and paths are determined, and finally the safety factor is determined

    2 、根據百色的地形地質條件,充分模擬了蝕變帶、節理隙、 f6層、灌漿帷幕等,較為真實地建立了壩體與地基相互作用的整體三維數值模型;採用有限元法對壩體及壩基在不同工況下的應力應變狀態開展分析,評價各工況下壩基的運行狀態;而後採用超載法和綜合法對大壩穩定性進行分析,模擬壩基的漸進性破壞過,從而得到壩基在超載和強度下降過中的破壞模式和破壞發展徑,最終確定壩基超載安全系數和綜合安全系數。
  9. Beginning form relation of basin - mountain, the tectonic evolution and the petroleum system and pool - forming process have been studied with the integration of structural physics modeling, balance profile reversion and other new testing technology. the main innovative achievements of the dissertation can be summarized as following : 1. on the basis of comprehensive analysis of yanqi basin relationship to tianshan orogenic belts, it was suggested that kuluketage faulted - upheaval was an aulacogen in early paleozoic, which undergone multiple opening - closing along with tianshan orogenic belts, and suffered extensively compressing in late hercyhian cycle and formed a " v - type " thrust - fold belt

    論文總的指導思想是以現代石油地質理論為基礎,以整體、動態、系統、綜合分析為原則,以成盆?成烴?成藏研究為主線,運用正、反演相結合的殘留盆地油氣成藏系統評價思,採用構造物理模擬、平衡剖面復原和多種測試新技術,從盆山耦合關系切入,研究含油氣系統成藏要素及其相互作用過,探討油氣成藏主控因素和油氣分佈的有序性,取得如下創新性成果和認識: 1 、系統分析了焉耆盆地形成演化與天山構造帶的關系,提出盆地南側的庫魯克塔隆在早古生代為一大型陷槽,之後隨著天山構造帶的演化,經歷了多次開合運動。
  10. Seismic fracture, fault fracture and permafrost fracture all gave negative effects on engineering construction and formed geological hazards at many localities along the golmud - lhasa highway and railway ice fractures formed in freezing rivers and lakes and on the top of pingos have not shown any hazard effect on engineering constructions up to the present

    地震破縫和凍土縫對青藏公、青藏鐵及沿線工安全具有不良影響,這些地縫切割錯基,形成面破基滑塌,產生顯著的災害效應。
  11. Taking the natural frequency arid the ratio of frequency drop as input characteristic parameters, crack damage in the cylindrical supporting shell of a portal crane is diagnosed and its length and position are forecasted, applying finite element emulation and artificial neural network technologies

    摘要應用有限元模擬技術和人工神經網模型,以反映結構損傷度的固有頻率和損傷的頻率下降率作為神經網輸入的特徵參數,對門座起重機筒形支柱上出現的紋損傷長度和位置進行了綜合診和預測分析。
  12. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    沿線廣泛分佈有昔格達地層,昔格達地層能否用作高速公基填料,國內沒有先例,本論文就是結合導師的科研項目,在非典期間,現場長達5個月的工作,完成了從試驗、現場施工工藝到堤分層沉降監測等工作,是面對生產實際,認識昔格達地層的性質和其作為地基、基和填料應用中面臨的問題進行的研究。主要的研究內容有:對攀西地區地層巖性、構造等地質環境和昔格達地層的沉積歷史過作了系統的分析,研究表明西攀高速公主要受安寧河和昔格達影響,通過地區地震活動頻繁,差異沉降較大,對公建設、安全運行和沿線構築物設計有較大影響;由於昔格達地層在有些段作為地基、有些作為基,對其基本性質進行了研究:包括天然密度、含水量、塑液限、顆粒級配等指標的試驗研究。研究成果表明:昔格達地層為湖相沉積,主要為砂巖和泥巖,它以細粒組為主,同時粘粒的存在,使其具有一定粘性。
  13. Still, the change of vg parameter in the beam was investigated in this thesis. dilation of plastic belt in the beam is also studied. analysis show that there is clear direction during the dilation of plastic belt, which is similar with the path of shear - mode fracture

    分析表明塑性區的擴展有明顯方向性,據此得到的塑性區擴展方向與剪切型時的徑比較接近,也與加載過中韌帶區出現的集中剪切滑移線的方向比較一致。
  14. Two different reinforcing methodologies are applied : modification of the overlay characteristics by adding chopped glass fibers to the hot mixture asphalt ( hma ) and reinforcing asphalt overlay with glass grids. theory of fracture mechanics ( fm ) is employed to determine crack growth rates for the suggested anti - cracking overlay systems. asphalt mixture designing tests, three point bending tests and fatigue crack propagation tests were carried out. the critical stress intensity factors kic are determined for plain and reinforced asphalt concrete. depending on the fatigue crack propagation, the crack growth rate is determined for each type of anti - cracking system and the cracking process is also analyzed. one of the significant points in this study is the attempt to give better understanding of the crack propagation for multilayer asphaltic overlay or what are suggested herein to be called composite structure anti - cracking overlay system. the results indicate that the reinforcing materials improve anti - cracking characteristics of the asphalt concrete. composite structure anti - cracking overlay gives a good solution for the reflective cracking phenomenon over old cracked pavements

    利用2種不同的方法加筋瀝青罩面:在瀝青混合料中加入短切玻璃纖維改善瀝青混凝土的特性,採用玻璃格珊加筋瀝青混凝土.應用力學方法分析瀝青縫擴展機理.採用瀝青混合料設計試驗、三點彎曲試驗和疲勞縫擴展試驗,確定加筋瀝青混凝土的臨界應力強度因子kic ,測量每一種瀝青罩面抗系統的縫擴展速率.本研究的主要特點是提出復合型抗罩面系統,分析了多層加筋瀝青罩面縫擴展過,推薦了若干瀝青面抗系統.結果證明,加筋材料可以提高瀝青罩面的抗特性,復合型抗罩面系統能夠有效地阻止反射縫的擴展
  15. Jacked pile is widely used because of its various advantages such as noiseless, vibrationless, no impact and minor construction stress. however, the obvious compacting effects caused by the penetration of jacked pile may have severe influence on surrounding engineering environment

    但是,靜壓樁屬于擠土樁,其產生的擠土效應會對周邊環境造成不利的影響,嚴重者可能造成鄰近的建築物開,道隆起以及地下管線等工事故。
  16. Based on neural network, a novel design of soft - sensor is presented, in which grey, relation analysis as an assistant tool of secondary variables selection in the modeling course of soft - sensor is used to predict the fracture energy and crack length of concrete bending beams

    基於神經網提出了一種新的軟測量方法,採用灰關聯分析作為軟測量建模中輔助變量選擇的工具,對土木工中常用的混凝土彎曲梁的能和區長度進行預測。
  17. Therefore, the present paper, based on the existing achievements as well as an extensive study & investigation in combination with part of the achievements the author has derived by hosting or participating in the research programs of the cement concrete pavement, has led to three phases of fissures and breaking in the pavement slab on the condition that each performance of the subgrade is maintained, i. e. stages of formation in initial cracks, of accumulation & expansion in ruptures and of fissures & breakage in the pavement

    為此,本文在已有研究成果的基礎上通過廣泛調研,結合作者近幾年來主持或參加的有關水泥混凝土面研究課題的部分成果,在面基層的各種性能得到保障的前提下,通過理論研究和試驗研究,得出面板的開破壞過分為三個階段,即初始縫形成階段、縫累積和擴展階段以及破壞階段。
分享友人