施工吊車 的英文怎麼說

中文拼音 [shīgōngdiào]
施工吊車 英文
construction hoist
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : hangsuspend
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • 施工 : be in the process of construction; be under construction; build; construction
  1. In addition to, the fatigue crack between web and upper flange of welded steel crane beam on heavy duty service was discussed, and based on long - term observation and research, the author classified fatigue crack into bearing type and middle type crack along the horizontal direction. the causation, distributive law and mechanism of the crack were analyzed, and the precautions to take and the measures to remedy crack were presented. the main defacts including damage, crack, erosion and aging in structures, especially in concrete structure were introduced ; the defact mechanism was analyzed and the precautions to take were also given

    另外,作者對重級作制焊接鋼梁腹板與上翼緣連接焊縫的縱向水平疲勞裂縫進行了長期的觀察和研究,根據疲勞裂縫產生的不同機理,將其分為支點裂縫和肋間裂縫,並討論了兩類裂縫產生的原因、分佈規律、機理以及防治的措;對程中經常遇到的結構構件,尤其混凝土構件的幾種主要病害(損傷、裂縫、腐蝕與老化)進行了機理分析並提出了防治措
  2. 2 ) from the angle of constructing course, steeve - arch supporting structure requires low - capacity cranes to erect, and simple constructing methods easy to meet. the time spending on construction is short. the usual arch supporting structure requires high - capacity cranes to erect, and complicate constructing methods hard to meet

    2 )從角度看,桿式拱架支承結構對的起能力要求低,藝簡單,方便,期短;豎桿式拱架支承結構起頂重量大,對的起能力要求高,難度大。
  3. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮,完成了水上運輸、水上起重等作業,如鋼管樁的運輸、插打、水上平臺的搭設、鉆機的水上轉移、承臺箱的起、鋼管樁的拔除等作業。
  4. Dynamic test has been performed on three strengthened girders after they were being put into service. according to the measured data from the dynamic test and the calculated results of the proportion of the load distribution on steel diagonal braces and steel crane girders as well as the increased carrying capacity after strengthening in consideration of the principle of cooperative work between braces and crane girders, the feasibility, rationality, and economy of this strengthening scheme have been verified. this scheme can be applied extensively to strengthen crane girders system including concrete crane girders system hereafter

    最後結合對已經加固並投產使用的3榀鋼梁的現場實際動測結果,按考慮下部鋼斜撐與鋼梁二者協同作的原理對鋼梁與下部斜撐之間的荷載分配比例以及加固后鋼梁的承載能力進行了進一步的計算驗證和對比分析,論證了採用鋼斜撐方案加固已有鋼梁的合理與有效性。
  5. The total area of the corporation covers about 200 chinese acres and the length of coastline is about 1, 140 meters, the auxiliary facilities have taken shape the main facility and the equipment include the 30, 000 dwt dry dock which is 192 meters long by 40 meters wide the gate width 32 meters and 10 meters deep, is to date the biggest dry dock in fujian province ; one fitting wharf length 65 meters, width 17 meters ; 16 tons portal crane 1 set, 16 tons gantry crane 1 set, mobile cranes 50t1 25t1 12t2 8t4 and other necessary transportation, coatings, the precision work equipment supplying air 120 m min, spraying grit more than 4, 000 m day, renews the steel plate 12 15 t day we can finish repairing all kinds of ships under 40, 000 dwt within 7 to 10 days our corporation obtains the first - class dockyard to repair and build steel - made ships lisence in 2001, passed the national environmental protection appraisal in august 2002, was designated shipbuilding in fujian for maintaining foreign ships in octobet 2002, the dry dock, passage channel, the turning area, fitting wharf are passed by passage safety appraisal in march, 2003

    主要設和設備有: 3萬噸級干船塢一座長192米寬40米塢門凈寬32米深10米是福建省目前最大的干船塢舾裝碼頭一座長65米寬17米16噸門座起重機1臺10噸門1臺汽8臺50噸1臺25噸1臺12噸2臺8噸4臺以及與其相配套的運輸噴塗精加設備。每分種供氣120立方米,日噴砂面積4000多平方米,日換鋼板15 20噸。一般修船期為7 10天。
  6. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同況(沉井充填、錨體澆築、主纜架設、箱梁裝、橋面鋪裝以及通運營)下的過程作了模擬,全面揭示了各況下錨碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  7. The steel - replacing - concrete construction of crane beams of a heavy factory building

    重型廠房梁鋼混代換
  8. Have bore stage car, grab, fork - lift truck, self - propelled to bridge machine, booth shop machine, roller, bulldozer, land leveler, tong carries car of stage of build by laying bricks or stones of line of pump, hydraulic pressure, crane, complete station the construction such as appearance, ride meter, dynamo and detect professional equipment 850 ( set ), technology of average per capita equips twenty - five thousand eight hundred yuan

    擁有鉆孔臺、挖掘機、裝載機、自行式架橋機、攤鋪機、壓路機、推土機、平地機、砼輸送泵、液壓襯砌臺、全站儀、測震儀、發電機等及檢測專業設備850臺(套) ,人均技術裝備2 . 58萬元。
  9. To provide the construction machine for the building with curved profile and to solve the problem of traveling cable movement during cage up and down running along the curve mast, this kind of hoist is equipped with a speacial mechanism to maintain the cage floor always horizontal and a special cable trolley

    該種機型主要解決各類曲線型建築物的上下運輸問題。為克服曲線運行造成隨行電纜漂移難題,配有專用電纜滑裝置,籠地板的自動調整裝置,可保證在任何運行段地板保持水平狀態。
  10. During construction, special building methods were used to limit environmental damage, such as the piles being bored into the seabed rather than pile driven, to avoid mud sediment settling on the corals and killing them. most of the superstructure was prefabricated off - site, brought in by barge and then placed in position by crane to minimise the pollution, rubbish and noise

    例如裝設支撐中心的樁柱時採用鉆挖形式,取代普通的打樁方式,務求減少翻起海床的沙泥,避免珊瑚窒息及死亡大部份上層建築組件是在建築地點以外的地方預先製作,並由駁船運到海下,再以裝嵌,從而把帶來的污染垃圾及噪音減至最少。
分享友人