施工場地 的英文怎麼說

中文拼音 [shīgōngchǎngde]
施工場地 英文
construction plant
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 場地 : area; yard; space; place; site; court; field
  1. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧洞的設計和中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對下水滲流及圍巖穩定性的影響和所應採取的支護措等方面進行了探索、研究。
  2. In our company we have forging, costing and heat treatment workshops with advanced producing equipments. all the tasks which refused by the other companies will be done well here. there are many large - size air hammers, blast furnaces and costing equipment including all sorts of heats treatment equipment, costing equipment including all sorts of heat treatment equipments

    我公司下屬鍛造鑄造熱處理加廠各一座,有先進的生產設備,可以接收其它部門不願承攬,甚至不敢承攬的艱巨任務,我們有大型的空氣錘和高爐冶煉鑄造設,有淬火退火回火各種熱處理設備。
  3. In this area, our municipal sector division supports the activities of the food and environmental hygiene department offering services in over 1, 200 markets, food centres and hawker bazaars ; public facilities such as bath houses and latrines ; refuse collection points as well as in the highly specialist area of cremators

    我們的市政程部主要為食物環境衛生署提供支援服務。服務的包括逾1 , 200多個街市、食肆及小販市;公眾浴室及公廁等公共設;垃圾收集站及火化爐等較專門的設等。
  4. The buffer zones will be maintained throughout the construction and operational phases of the proposed third golf course

    整個緩沖帶會在擬建第三個高爾夫球和運作期一直維持。
  5. For improve site soil condition and ensure piling work safety, we have worked out dewater construction proposal

    為改善現條件,保證壓樁程的安全進行,編制降水程的方案
  6. Planning and arrangement of the site for the bored pile construction

    鉆孔灌注樁施工場地規劃與布置
  7. As the nature of the soil often varies considerably on the same construction site, the capacity of the soil to support loads also varies

    即便在同一施工場地,由於基的性質有很大差異,土體的承載力也不相同。
  8. He said that construction sites were subjected to spot inspections and that evening classes on safety were provided to workers

    他還說到,所有施工場地都會受到當視察,同時還會向人們提供晚間的安全知識課程。
  9. Wastewater lifting plants for buildings and sites - principles of construction and testing - part 1 : lifting plants for wastewater containing faecal matter ; german version en 12050 - 1 : 2001

    建築物和施工場地廢水提升裝置.製造和試驗原理.第1部
  10. Wastewater lifting plants for buildings and sites - principles of construction and testing - part 3 : lifting plants for wastewater containing faecal matter for limited application ; german version en 12050 - 3 : 2000

    建築物和施工場地廢水提升裝置.製造和試驗原理.第3部
  11. Especially the mobility is very good, so it can extend with the raw material or the construction place, and it can also make multiple matching, meet different product requirements

    尤其是機動性好,能隨原料施工場地一起延伸,並可進行多種組合,滿足不同用料需要。
  12. Wastewater lifting plants for buildings and sites - principles of construction and testing - part 4 : non - return valves for faecal - free wastewater and wastewater containing faecal matter ; german version en 12050 - 4 : 2000

    建築物和施工場地廢水提升裝置.製造和試驗原理.第4部
  13. It is proposed that the 3d - coordinate method should be used as the solution to the problems caused by narrower construction sites where the traditional methods are not applicable

    摘要針對施工場地狹窄,無法運用傳統方法進行變形觀測的情況下,對深基坑的變形觀測提出了三維坐標法。
  14. A preliminary criterion on soil displacement was suggested, which is of use value for reference to eliminate harmful impacts of earth - extrusion effects on the surrounding engineering events at a geologically similar fields

    對防範類似施工場地周圍建(構)築物遭受沈樁的有害影響具有實用參考價值。
  15. For the use of warning on highway, parking lot, airport, charge station residential quarter and construction site. it is convenient to take easy to install economize energy with little maintenance

    適用於公路、停車、機、收費站小區及施工場地的警示作用,具有攜帶方便、安裝簡單、節約能源、較少維護等優點。
  16. Article 29 the unit in charge of a construction project which may produce environmental noise pollution due to the use of machines and other equipment, must report, 15 days before commencement of construction, to the competent administrative department for environmental protection of the local people ' s government at or above the county level the name of the project, the construction site, the length of time needed for completion of the project, the possible level of environmental noise and the measures taken for prevention and control of such pollution

    第二十九條在城市市區范圍內,建築過程中使用機械設備,可能產生環境噪聲污染的,單位必須在程開十五日以前向程所在縣級以上方人民政府環境保護行政主管部門申報該程的項目名稱、所和期限、可能產生的環境噪聲值以及所採取的環境噪聲污染防治措的情況。
  17. Abstract : the stimulation treatment of & quot; loosening rock by the dilatancy of explosive waves & quot; is tested in the casing well 4242 for studying its result and its influence on casing. the result of the field test shows that this test is successful in technology, the oil production of the well is 4 times as much as that of it before the test ; the deformation of casing is local, and the result of the strength calculation shows that the deformation will not destroy casing

    文摘:為了研究「壓脹松動」增產技術的增產效果和對套管的影響,在延長石油管理局子長油礦對4242井進行了現實驗.該技術採用強動載波在層深處疊加的方法,造成壓脹條件,松動巖石,增大近井帶滲透率,提高油井產量.后,該井產量增加為原來的4倍多.本次實驗藝上是成功的,首先是按設計要求引爆了炸藥,其二是由於採取了保護措,使套管變形局限在段處,不影響下泵,不影響油井生產;套管強度校核分析也證明了套管不會破壞.質效果明顯
  18. Jing - tong fast way, jing - shen speedway, jing - jin tang speedway, beijing six - ring way, jing - ha speedway, chaoyang way etc. six corridors connect with the capital city zone ; jing - jin road obliquely crosses area, and can reach the capital international airdrome by six ring road in 10 minutes and reach tianjin tanggu new harbor by jing - jin - tang speedway in 60 minutes ; jing - qin and jing - cheng railway meet in tongzhou city zone, the railway eight line that is about to be open to traffic and the railway five line that is in construct greatly shorten the distance between beijng and tongzhou ; the harness project of tong - hui river and canal made jing - hang grant canal finished, before long people can directly reach beijing city and summer palace

    京通快速路、京沈高速公路、京津塘高速公路、北京六環路、京哈高速公路、朝陽路等六大走廊與首都市區相連接,京津公路斜穿區域,行六環路10分鐘可達首都國際機,行京津塘高速路60分鐘可達天津市塘沽新港;京秦、京承鐵路在通州城區交匯,即將通車的鐵八通線和開始建設鐵五號線,大大縮短了京通的距離;通惠河、運河治理程使京杭大運河告竣,不久可將乘船直達京城和頤和園。
  19. The main work done in this paper is as follows : ( 1 ) simulate the temperature field of basement wall by ansys software, sum up the characteristics of the temperature field of basement wall, and analyze the influence of the types of the molding board, environmental change and cement content ; ( 2 ) the whole simulation analysis process of early - age concrete stress field is realized by sub - development of ansys, and cts - ansys software is developed with fortran ; ( 3 ) based on the cause of cracking, the influence of the thickness of the wall, length, bar arrangement, mix proportion, expanding agent, etc, on the wall stress due to concrete creep and temperature change is analyzed

    本文主要進行了以下幾個方面的研究: ( 1 )利用ansys軟體,模擬了下室側墻溫度,總結了下室側墻溫度分佈的特點,分析了模板類型、環境變化和水泥用量等對墻體溫度的影響; ( 2 )以大型通用有限元軟體ansys為平臺進行二次開發,運用visualfortran語言編寫了cts - ansys程序,實現了期混凝土徐變溫度應力的模擬計算; ( 3 )從裂縫形成的原因出發,分析了下室側墻厚度、長度、配筋率、配合比、膨脹劑等因素對墻體徐變溫度應力的影響。
  20. Urban deep foundation excavations are generally surrounded with dense buildings. so their working space is very narrow, especially when they are close to the foundations of adjacent buildings or structures

    城市中的深基坑程一般都處在密集的建築群中,施工場地狹窄,有些程的基礎緊鄰已有建築物或構築物的基礎。
分享友人