施工場所 的英文怎麼說

中文拼音 [shīgōngchǎngsuǒ]
施工場所 英文
job locationwork-site
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧洞的設計和中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流及圍巖穩定性的影響和應採取的支護措等方面進行了探索、研究。
  2. Recently, using solid clay brick is gradually prohibited, so the new wall material is required to fill up the new architecture. many sections research on this field, using fly ash to develop new building materials is the mostly adopted method, among the new building materials, fly ash foamed concrete is a noticeable one because of its outstanding merits such as light weight, heat preservation, sound insulation and good resisting earthquake. using fly ash to develop foamed concrete can not only become fly ash into resources, but also provide a new kind of building materials for the innovation of wall materials, which has good economy and society ben efits

    近年來,由於墻改「禁實」政策的實,市急需新的墻體材料來填補新建築需,許多單位相繼開展了各有關研究,綜合利用粉煤灰研製開發新型建材逐漸成為了主流,其中多孔混凝土特別是粉煤灰發泡混凝土,正以它突出的輕質、保溫、隔音、抗震效果好等優點,成為一種引人注目的建築材料,利用業固體廢棄物粉煤灰研製發泡混凝土不僅能實現粉煤灰的資源化,而且還可為墻體材料的改革提供一種新型建築材料,具有較好的經濟效益和社會效益。
  3. 0. 2 the purples of choosing the topic this thesis aims to the present problems which are existing in the traditional examination method on the construction units ( bidders ) during the invitation of bids it is expected to apply such mathematics methods as fuzzy comprehensive assessment, so as to research the quantitative standards for the pre - examination about qualification and the tenders, assessment and the specific, practical method of their pertains, during the invitation of bids and tenders thus, the market for the invitation of bids and tenders be regulated, and the procedure for the predomination and tenders assessment would be more scientific and operative

    2本論文選題的目的本論文旨在針對目前招投標實踐中傳統的考察單位的方法存在問題,擬通過模糊綜合評判等數學方法,研究招投標中資格預審和評標中的量化標準以及具體實用的操作方法。以規范招投標市,並使招投標初審和評標過程更具科學性和可操作性。本課題的研究成果將對我國程招投標量化管理作有很強的實用價值。
  4. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現測試作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  5. The necessary measures should take due account of the preventive principle according to which, among other things, combating risk at the source, adapting work to the individual, especially as regards the design of workplaces, and replacing the dangerous by the non - dangerous or less dangerous, have precedence over personal protective equipment for seafarers

    必要的措應充分考慮到預防性原則,根據這一原則,最重要的是從源頭降低風險,使作適合於個人,特別是關于的設計,優先考慮用無危險或危險性小的設計來取代危險的設計,然後再考慮海員的個人保護設備。
  6. All centres are well - equipped with training workshops, multimedia language laboratory, audio - visual aids room and recreational areas

    有訓練中心皆設有設備完善之訓練、多媒體語言實習室、視聽教材室和娛樂設等。
  7. Abstract : automatic sprinkling system is widely applied for high rise building and deluxe hotels and the quality of construction and installation are essential to the effective performance of this system

    文摘:自動噴水滅火系統在高層建築、高級賓館、酒店等應用比較普遍,但質量的好壞直接影響著系統滅火效能的發揮。
  8. On the field construction of storage tank, the hoisting structure of electric block, by means of mechanics analysis and computation, can determine the amount which the electric block requires, the size of its side column and central column and its connecting forms, thus eventually reasonably allocating construction tools and decreasing the consumption of assistant materials only when the construction security is guaranteed

    摘要儲罐現中,電動葫蘆提升結構可通過力學分析、計算,確定需電動葫蘆的數目、提升組合結構中邊柱和中心柱的規格尺寸及其連接形式,達到在保障安全的前提下合理配置機具、減少輔助材料消耗的目的。
  9. Article 22 within the nature reserves, scenic spots or historical sites, and areas of source of drinking water as designated by the state council, the relevant competent department under the state council and the people ' s governments of provinces, autonomous regions and municipalities directly under the central government and other zones that need special protection, it is forbidden to construct installations or use the places for centralized storage and treatment of industrial solid waste or garbage - fill ground

    第二十二條在國務院和國務院有關主管部門及省、自治區、直轄市人民政府劃定的自然保護區、風景名勝區、生活飲用水源地和其他需要特別保護的區域內,禁止建設業固體廢物集中貯存、處置設和生活垃圾填埋
  10. It is believed that it will reveal that, for 97 per cent of housing sites, construction work starts within three months of the grant of planning permission

    大家相信在建築資格批準后的未來三個月內, 97 %的住宅程將會開
  11. These supply us benefit for reference. construction enterprise, on one hand, can select proper strategy on the basis of their own resource and condition, as external environment varies in order to seize opportunity. on the other hand, as reforms on economic systems progresses, and globalization and integration develop, move and move mne ' s come into china, and they confront much more competitors, which cannot be reduced by the nation ' s mandatory plan

    對于剛剛從計劃經濟體制下脫胎走向市經濟的大型國有企業,一方面,在擺脫了經濟體制的羈絆后,企業可以根據外部環境的變化和自身的資源和條件選擇適當的戰略,從而抓住機遇促進自身發展,但另一方面,隨著經濟體制改革的不斷深入和經濟全球化和一體化過程的加快,尤其是伴隨跨國公司大量進入中國帶來的國際競爭的加劇,企業又面臨越來越多的威脅,逐漸失去了政府各種保護的國有大型企業再不能靠完成國家指令性計劃就高枕無憂。
  12. The contractor ' s workforce will not be allowed to commence work on site until all certification has been presented to the construction manager or his nominee

    在承包商未向經理或其指定人提供資質證件前,承包商隊伍不得開展任何現作。
  13. All mobile equipment when first arriving at the site must be inspected by the construction manager or his nominee and carry current state certification if required

    有移動設備首次抵達現時,必須由現經理或其指定人進行檢查。並且,在需要的時候,應攜帶需檢查設備的現行申明證書。
  14. All contractors ' equipment when first arriving at the site must be inspected by the construction manager or his nominee and carry current state certification if required

    有承包商設備首次抵達現時,必須通過經理或其指定人的檢查。並且,如果需要還需要檢查承包商有的現行作業證書。
  15. He said that construction sites were subjected to spot inspections and that evening classes on safety were provided to workers

    他還說到,地都會受到當視察,同時還會向人們提供晚間的安全知識課程。
  16. Bridges, tunnels, and skyscrapers under construction can also be dangerous places to work

    橋梁,隧道,以及摩天大廈的施工場所也充滿危險。
  17. Article 29 the unit in charge of a construction project which may produce environmental noise pollution due to the use of machines and other equipment, must report, 15 days before commencement of construction, to the competent administrative department for environmental protection of the local people ' s government at or above the county level the name of the project, the construction site, the length of time needed for completion of the project, the possible level of environmental noise and the measures taken for prevention and control of such pollution

    第二十九條在城市市區范圍內,建築過程中使用機械設備,可能產生環境噪聲污染的,單位必須在程開十五日以前向在地縣級以上地方人民政府環境保護行政主管部門申報該程的項目名稱、施工場所和期限、可能產生的環境噪聲值以及採取的環境噪聲污染防治措的情況。
  18. The place for effective action is the job site.

    採取有效措的地點就是
  19. Order to minimize the effect of construction on the public, apart from the active replacement of old pipes, we have also introduced a new method for continuous water supply to be used in particular places, so as to reduce the scope and frequency of water suspension. even though the cost is higher, it can effectively prevent water pollution and reduce water loss during the construction

    了降低對民眾造成的影響,本處除積極汰換老舊管線外,也引進新的不斷水法,用在特定合以縮減停水范圍和次數,雖然成本較高,卻可有效防止水質污染減少流失的水量。
  20. The management system shall cover work carried out in the laboratory ' s permanent facilities, at sites away from its permanent facilities, or in associated temporary or mobile facilities

    3實驗室的管理體系應覆蓋實驗室在固定設內、開其固定設,或在相關的臨時或移動設中進行的作。
分享友人