施工導流 的英文怎麼說
中文拼音 [shīgōngdǎoliú]
施工導流
英文
construction diversion- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 導 : 動詞1. (引導) lead; guide 2. (傳導) transmit; conduct 3. (開導) instruct; teach; give guidance to
- 流 : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
- 施工 : be in the process of construction; be under construction; build; construction
-
In this paper, those uncertain factors affecting the flood discharge are discussed, especially the uncertainty of flood hydrograph
本文全面考慮了影響施工導流及泄洪風險的不確定性因素,重點分析了洪水過程的不確定性對施工導流及泄洪風險的影響。It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis
文中說明了施工導流建築物的等級、水工布置。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段洪水導流方案的合理性和經濟性,為施工決策提供理論依據。Design of diversion works of mianhuatan hydropower station
棉花灘水電站施工導流設計Design of hydrogenerator house in tengxigou water power station
四湖溝水利樞紐壩型比較施工導流設計By analyzing risk sources and those uncertain factors affecting the risk, the diversion risk is defined as the probability of the maximum discharge after being adjusted and held higher than the maximum design flood
通過對導流風險來源和引起導流風險的各種不確定性因素的論述和分析,把施工導流風險定義為天然來(洪)水經過調蓄后,導流泄水建築物的最大泄水流量超過其設計最大泄水能力的概率。In this model, the peak of flood, flood total outflow and flood process are to be considered. a calculation program with monte - carlo method and a simplified method for calculating diversion risk are suggested
在該模型中,可考慮水文中的洪峰流量、洪水總量和洪水過程的不確定性及水力的不確定性,提出了用monte - carlo方法計算施工導流風險的步驟和用近似法計算施工導流風險的方法。Overflow cofferdam and iversion tunnel are used offen to diverse the flow especialy where or the river discharge changing widely. there are many rivers in mountainous area in our country, so this kind of cofferdam is used relatively frequently in river divertion during construction
過水圍堰和導流隧洞相結合的導流方式對于流量季節性變化懸殊的河流具有一定的適用性。我國的山區性河流較多,因此這種圍堰過流的導流方式在施工導流工程中較為常用。Design guide of construction diversion for hydropower and water conservancy project
水電水利工程施工導流設計導則Discussion on project type and construction method of courseware protection dike in severe area
土木結構圍堰在施工導流工程中的應用Construction diversion system is an important system in water resources and hydraulic engineering
施工導流系統是水利水電工程中的一個重要系統。River divertion during construction is the one of important tache in the project of hydropower engieering
施工導流是水電工程建設中的重要環節之一。This article expounds the construction diversion scheme and countermeasure of sihugou key hydroproject in a cold region
本文論述了四湖溝水利樞紐工程施工導流方案和對策。Meanwhile quality control of asphalt concrete core construction and character of construction diversion are analyzed and mentioned briefly
同時對瀝青混凝土心墻的施工質量控制、施工導流特點等做了簡單的分析和論述。The decision making of construction diversion is a key problem concerned with the cost, period, safety and convenience of construction
施工導流方案決策是關繫到水電工程造價、工期、安全和施工方便與否的關鍵問題。Since the boundary condition of river divertion during construction project is very complex, so physical model techneics are often used to checkout the design
由於施工導流工程的邊界條件比較復雜,因此通常採用物理模型試驗對工程設計進行論證。This article first introduces physical geography general situation, clarifies the rank of this hydroproject, the grade and layout of its hydraulic structures, and expounds the necessity and feasibility of this project. then, this paper further gave a clear explanation of the developing summarize of construction diversion for embankment dams. this study made a theoretical preparation for its construction diversion
本文首先介紹了四湖溝水利樞紐工程的天然地理概況,闡明了水工建築物的等級及工程布置,說明了四湖溝工程建設的必要性和可行性,文中進一步闡明了土石壩施工導流發展的概況,為四湖溝水利樞紐工程施工導流作出了理論上的準備。In light of the special natural conditions and project layout characteristics of xiangjiaba hydropower station, a stage diversion scheme with the left bank being closed at the first stage and the right bank closed at the second stage has been selected through comparison of several schemes under the consideration of the aspects such as construction layout, late - stage flood control, navigation during the construction, and the construction period before the commissioning of the first hydropower generating unit
摘要針對向家壩水電站特殊的自然條件和工程布置特點,其施工導流經過對多個方案進行比較,從施工布置、後期度汛、施工期通航、發電工期等方面考慮,選擇了第一期圍左岸、第二期圍右岸的分期導流方案。Abstract : this paper summarizes a series of tests and inve stigations on general layout, const ruction diversion, flood disposal, navigation, river closure, form of gate opening s ection, pattern of energy dissipation and scouring under sluice carried out for f eilaixia proj ect by the scientific research institute of prwrc during the period from 1983 to 1998 and presents their major results
文摘:綜合闡述了珠江水利委員會科學研究所從1983 ? 1998年間對飛來峽水利樞紐的整體布置、施工導流、泄洪、通航、截流、閘孔斷面形式、閘下消能形式、閘下沖刷等所進行的一系列試驗和研究工作,並介紹主要試驗研究成果。The selection of impoundment level and dam site, the general layout, the design optimization of structures, construction diversion and construction period all are the important context of the design of hydropower station across river with low head
蓄水位選擇、壩址選擇、樞紐布置、建築物設計優化、施工導流與工期等是低水頭河床式電站設計的重要內容。This article mainly describes the design conditions, diversion procedure and discharge frequency in the construction diversion of the longkou water control project, as well as its hydraulic calculation in stage diversion, structural style of the cofferdam and the closure design
摘要主要介紹了黃河龍口樞紐工程施工導流的設計條件、導流方式及導流標準、流量,詳細敘述了分期導流的水力計算,圍堰結構型式及截流設計。分享友人