施工平臺 的英文怎麼說

中文拼音 [shīgōngpíngtái]
施工平臺 英文
construction platform
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  • 施工 : be in the process of construction; be under construction; build; construction
  1. Either to be a platform for originating an attack to the enemy or to be a vehicle for landing force, the wig vehicle must fly with low altitude in martial action. it is also a valuable topic that how to take advantage of the good interaction and avoid the potential dangers as flying at lower altitude in demotic application

    在軍事上,地效翼船無論是作為實襲擊的還是登陸作戰的具,保持低空飛行狀態都是必須的;在民用上,如何在充分利用低空飛行的有利因素的同時規避低空飛行時潛在的風險也是一個值得研究的問題。
  2. From lately 1990s " to early this century, digital manufacturing took extensively attention as a new fabricant idea, because it is the core of all manufacturing technologies and platform of other advanced manufacturing technologies, such as electronic business manufacturing, rapid manufacturing, internet - based manufacturing. it is the front in the filed of mechanical engineering

    數字製造作為一種新的製造概念引起了製造界廣泛重視,它是所有製造技術的核心,為實其它先進製造技術提供了,如電子商務製造、快速製造、網路製造等,是機械程技術發展中前沿問題。
  3. Construction technology of shallow sea bore pile floating platform

    淺海鉆孔樁浮
  4. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮吊,完成了水上運輸、水上起重等作業,如鋼管樁的運輸、插打、水上施工平臺的搭設、鉆機吊車的水上轉移、承吊箱的起吊、鋼管樁的拔除等作業。
  5. Based on the architecture of pdms ( product data management system ) for cpd ( concurrent product development ), the paper explores the relationship of ce and pdms, the mode of pdms - based cpd, the function frame and architecture of web - based pdms, the connotation of cpc ( collaborative product commercial ), the architecture and key - tech of windchill solution. some suggestions and methods are put forward. the smarteam - based pdms for steering system is put into practice

    本文以支持并行產品開發過程的產品數據管理系統的構造為研究背景,深入探討了并行程與產品數據管理技術的關系、基於產品數據管理的并行產品開發的作模式、基於web的產品數據管理系統的功能框架與體系結構、協同產品商務的內涵、典型winchill解決方案的體系結構與關鍵技術等問題,提出了相應的解決措和方法,並具體實在基於smarteam的汽車轉向器項目產品數據管理系統中。
  6. It will cover products including anchor channels for pre - casting systems, stainless steel aerial tower work platforms and scaffolding products, and is scheduled for production in october 2004

    可製造的產品包括槽式預埋件不銹鋼高空及棚架產品及其他鋁金屬加產品。
  7. The armor plate is a product of no cutting bits, holding the advantages that being high usingrate, firmintensity, slippery proof, easy to fix, durability and breezy, ectc. it can be used as motoway partition, air field runway and used for mine, dock, working platformand so on

    篩網作為一種無切屑產品,其鋼板利用率高,強度牢固,具有防滑、通風性能好、方便、經久耐用等優點;用於高速公路建築、大型飛機楊跑道、礦井、碼頭、、隔離等。
  8. Based upon the present regulation, the design and construction check and structure strength check, the electric power generation water inlet anchor gate crane platform ' s hydro - engineering structure of fushui power plant were conducted and an analysis for the reasons of building structure fracture was carried out

    摘要進行了富水電廠發電進水口閘門啟閉機安全檢測,依據現行規?對其建築物進行了設計與復核、結構的強度復核和建築物的裂縫成因分析。
  9. During the second phase of the east lake lakeshore scenery construction project, an approach was taken to establish a public domain including a cha - gang lose - water " observation platform, bathing beach and parking lots. the design and analysis of all these elements have been addressed in the following article as well as other components such as roadway alignment, installation, water bank stabilization, planting, street lighting, sculptures and accessible paths for disables. the proposed landscape will ensure a systematic visual system with enhanced cultural, artistic, and unique characteristics, and properly arranged facilities along the shoreline

    本文通過東湖環湖景觀建設綜合整治二期程中的茶港親水、沙灘浴場及停車場的道路和景觀設計,對東湖環湖的路面、鋪裝、駁岸、綠化、亮化、燈飾、小品、殘疾人通道等多個方面進行了分析,以期建立一個統一有序的視覺體系,增強東湖環湖旅遊線的文化性、藝術性和獨特性,合理安排布置配套設,使之成為一條步移景異,集秀、翠、幽、雅為一體的湖畔風光游覽路。
  10. Application and practice of static pressure pile foundation construction in beach plain area of yantai

    靜壓法樁基在煙濱海原地區的應用實踐
  11. This paper introduces the basic structure, system composition, applicable condition, main parameters and construction procedure of the first walking underwater bed leveling machine in china, and describes the construction quality and efficiency of bed leveling in yangtze estuary deepwater channel regulation project

    摘要簡要介紹我國第一步履式水下基床整機的基本結構、系統組成、適用條件、主要技術參數和藝,並對其在長江口深水航道治理過程中進行基床整的實際質量和效作了說明。
  12. In the spatial plan, altogether designs in some seven rooms, an outdoors display space, except for this, has the conference room, the laboratory, the work room, the book reservation storehouse in addition, unloads cargo the platform and the audience service area and so on many facilities, completely conforms to the spatial requirement which a specialized art museum must have

    在空間的規劃上,共設計有七處室內、一處戶外的展覽空間,除此以外,另有會議室、研究室、作室、典藏庫、卸貨及觀眾服務區等等的諸多設,完全符合一座專業美術館所需具備的空間要求。
  13. In this paper, members serving system, popular web developing technology and pki ( public key infrastructure ) are introduced firstly. then, after analyzing the system in detail the author makes the conclusion that using mvc architecture based on jsp technology to build members serving system is a good method. furthermore, the method of system analysis and design using uml with rational rose tools is introduced

    文中將首先介紹期貨交易所會員服務系統,當今流行的電子商務的開發技術,及pki公開密鑰基礎設技術,之後從期貨交易所會員服務系統的功能需求出發,經過詳盡的分析確定以jsp技術為基礎的mvc框架結構,並結合使用rationalrose具描述了如何利用uml語言進行系統分析與設計。
  14. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術程分類及適應范圍進行了理論上的分析研究;然後結合程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在方案的研究和實過程中,對于組織進行綜合闡述,並就人挖孔樁、承梁、地下加層及結構加固、整體結構穩定等專項方案提出有針對性的技術措,人挖孔樁採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化序;承採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合技術採用土方分層對稱衡開挖,分段挖土做筏基結構自穩等;最後對于該程實后的效果分析,說明該項綜合技術的可行性。
  15. In terms of construction features of concrete platform on offshore, some requirements for concrete strength, durability, and constructivity are approached

    針對採油海上的特點,討論了近海混凝土採油對混凝土的強度、耐久性和可建造性方面的各項要求。
  16. Being lightweight aggregate, the chemical mineral constituents and physical mechanics properties of lytag are analyzed. meanwhile properties of haydite concrete using lytag as coarse aggregate are also studied. the influences on lightweight concrete qualities by introducing wollastonite and chemical admixtures are researched which proves the important roles of wollastonite and admixtures in construction of concrete platforms

    分析了作為輕骨料的粉煤灰陶粒的化學、礦物成分和物理力學性能以及用它作為粗骨料配製出的輕質混凝土的各項特性;研究了摻入硅灰和減水劑等外加劑對混凝土的強度、耐久性和新拌混凝土可作性的影響;說明了硅灰和化學外加劑在海洋混凝土中不可或缺的作用。
  17. 2 ) based on the study and analysis of many security architecture standards, the security region and the defense layer are introduced, the information category, the threatening level and the security protection level ( spl ) are put forward, the methods and requires of the security analysis are discussed in this paper. 3 ) based on the security architecture model and the security analysis, the graded requires of the security management and the security technology is presented, so the security design of the cissa and the choice of security produces can be done conveniently. 4 ) a cooperative communication platform is designed and implemented to ensure the dynamic and cooperative ability of above cissa model

    針對計算機信息系統安全體系模型和實標準的不足,本文緊密圍繞分層、分級、動態防禦以及協同通信等關鍵技術開展研究作,所做的作主要集中在: 1 )在深入研究了當前各種流行的安全體系模型基礎上,提出了用於指導計算機信息系統安全體系建設的動態縱深防禦安全體系模型; 2 )在對各種安全體系標準進行研究與分析的基礎上,引入了安全域和安全防護層次的概念,提出了信息類別、威脅級別和安全保障級別的定義,闡述了進行計算機信息系統安全分析的方法和要求; 3 )在安全體系模型和安全分析的基礎上,提出了安全管理及安全技術的分級要求,從而便於進行計算機信息系統的安全設計以及產品的選型; 4 )設計並基本實現了用於保障上述安全體系動態協同能力的協同通信
  18. This paper describes the construction technique of offshore anchoring rod rock - socketed piles for dalian beiliang oil product terminal, with the emphasis laid on the construction method of offshore construction platform, cleaning up inside piles, rock - socketed anchoring rod, and anchoring bolt, as well as means for dealing with special situations during construction

    摘要介紹大連北良石化成品油裝卸碼頭海上描桿嵌巖樁技術,著重介紹海上施工平臺、樁內清理、嵌巖錨桿、錨固硅的方法及中特殊情況的處理。
  19. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    系統分析了大跨度鋼桁架胎架整體滑移中的起重吊裝機具的選擇與布置、面布置、桁架結構拼裝單元及滑移單元劃分、滑移方案及藝流程、桁架的連接、拼裝運輸、及堆放、滑移軌道布置、滑移滾輪構造、延伸布置以及滑移牽引系統等諸多藝問題。
  20. The application of pile - bottom grouting technology in the bored pile construction of the cross - sea bridge at hangzhou bay

    杭州灣跨海大橋鉆孔樁施工平臺的設計
分享友人