施工支洞 的英文怎麼說

中文拼音 [shīgōngzhīdòng]
施工支洞 英文
adit
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • 施工 : be in the process of construction; be under construction; build; construction
  1. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    計算結果表明,如果能使錦屏程引水隧灌漿圈圍巖具有較好的防滲性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的護結構以及排水措,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和護結構安全的。
  2. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧的設計和中面臨的一些問題,選取隧的一個典型斷面進行滲流、滲控分析和開挖及護的有限元數值模擬,從而就深埋隧不同的開挖及護方式對地下水滲流場及圍巖穩定性的影響和所應採取的護措等方面進行了探索、研究。
  3. According to in - situ construction real time observation and inverse analysis results, refinement numerical artificial analysis on a group of headrace tunnels was conducted and influence of different construction schemes and support parameters on rock mass deformation and failure behavior were researched to provide quantized data and technical aid for project construction decisions

    基於跟蹤的現場實時觀測和反演分析結果,對引水發電群進行了精細化數值模擬分析,研究了不同方案和護參數對巖體變形、破壞特性的影響,以便為程的決策提供量化資料和技術持。
  4. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試作;試驗數據表明樁側摩阻和盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  5. The geological conditions are very complicated in hejiazhai tunnel which is located in guizhou shuibo railway, this tunnel is named " mashed tunnel " with the most difficult geological conditions such as the high dense gas and developed karst and gushing water assembled together, the geological hazards like the gushing water and sand, the collapse of tunnel, surface subsidence and slide, cracking of tunnel lining were often happened during construction period

    摘要貴州水柏鐵路何家寨隧道,程地質條件極其復雜,集「高瓦斯、強巖溶、大涌水」為一體,期間曾發生多次涌水涌砂、內坍方、地表塌陷與滑坡、護襯砌開裂變形等地質災害,堪稱水柏鐵路難度最大的「爛子」 。
  6. The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well

    摘要介紹了官地水電站場內環線道路黑水河溝隧道進口滑坡體的方法,包括開挖的方法以及超前與系統護對在滑坡體上進所發揮的作用。
  7. Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved

    6公里的雪峰山隧道程,首先介紹了隧道護結構的常用分析計算方法;然後通過對隧道過程中,室穩定性與護結構相互作用機理的深入分析,建立了隧道過程的空間計算模型,提出了採用三維彈塑性有限元-無限元耦合的數值計算方法,綜合分析了隧道在不同圍巖特性和圍巖類別條件下,以及不同開挖方案等對隧道圍巖整體穩定和安全性的影響,從而解決了通用有限元方法難以解決的隧道三維無限域問題;其可充分發揮有限元法在分析非線性方面的有效性和成熟性,以及無限元法在分析處理無限域和半無限域方面的精確性和簡便性,為隧道過程中圍巖的穩定性分析開辟了一條新的途徑。
  8. Studies the reinforce of the sliding construction, which is applied to the main structure, heavy load supporting and supporting for cavity. puts forward a effective reinforce program. the synchro - control, automation and inspection of the sliding construction is researched as well

    分析了滑移中的加固問題,闡明了加固基本原理及計算方法;通過對胎架滑移主體結構加固、重載承重架加固以及空撐加固的分析,提出了有效的加固方案。
  9. Including the main body of the subgrade, protecting and supporting engineering. drainage equipment of road, culvert and the transition zone between the road and the bridge. through investigating the types of diseases, the author discusses the existing problems and causes of producing diseases, puts forward the protective measures in design and construction, and raises the treatment measures in highway maintenance, which makes it more scientific and perfect for highway construction and maintenance in the loess areas

    論文首先對黃土的程特性及其影響因素進行了分析,然後對黃土地區路基病害及其防治技術進行了研究,具體包括路基主體、防護與程、公路排水設、涵及路橋過波段等部分,對病害類型進行了調查,分析了使用中存在的問題與病害產生的原因,提出了在設計與中應採取的防範措,給出了養護中的處治對策,使我國黃士地區公路建設與養護更加科學和完善。
  10. This text handles a tunnel for draining off water in huangjiawangarbage ground, in yichangcities is for the example, intro - ducedthe support techniqueofthe anchored bar, thesprayed concrete associated withthereinforcement matwhich is used in theengineeringconstruction, and pass to monitor, express the support technique can develop to the maximum bearing, and become the passive support becomean active support, so the the support technique guarantees the stabilizationof the tunnel and the normal proceeding of theconstruction with theengineering

    摘要以宜昌市黃家灣垃圾處理場排洪為例,介紹了錨噴網護技術在淺埋軟弱圍巖隧中的應用,並通過監測,表明錨噴網護能最大限度地發揮圍巖的自承能力、變被動護為主動護,從而保證隧圍巖的穩定和正常進行。
  11. Concerning the construction of the shallow cover and the special shallow cover in the tunnel under the special geology conditions, the principle of " to stabilize the slopes with protecting arch ; to strengthen the earth with the pipe - shield support grouting ; to dig a hole shallowly ; to blast slightly ; to use strong supporting structure. " has been adopted to enter the tunnel safely ; in terms of the broken belt, the effective actions such as the pipe - shield support grouting, strengthening the surrounding rock in advance with advanced bolt and steel grids, and so on, are taken to pass the poor conditioned part smoothly

    對于特殊地質中的淺理、特淺埋進,堅持「護拱穩定邊仰坡,大管棚注漿加固土體,淺打眼、弱爆破、強護」的原則,做到安全進;對于斷層破碎帶,則採取了管棚注漿,超前錨桿預先加固圍巖並結合鋼格柵撐等有力措,順利通過了不良地段。
  12. For some tunnel ' s construction, the stability of surrounding rock shoring mode, shoring time and so on have been studied

    對地下隧過程中圍巖的穩定性以及護方式和護時機等問題進行了研究。
  13. Abstract : the paper mainly describes the method of piling in pilot tunnelused in construction of the principal part of dongdan subway station in beijing

    文摘:主要介紹北京地鐵東單車站採用承法進行車站主體的方法。
  14. Then we simulate the common excavating methods of double - arc tunnel respectively, analyze the stress and strain of wall rock and support structure of each method, and recommend the best excavating method to construct double - arc tunnel in wall rocks of ii. then we analyze the " three headings method " in detail, and also simulate the effect of construction factor, stress releasing coefficient and secondary lining

    對實際程中最常用的三種開挖方法分別進行了模擬,分析了它們各自的圍巖和護的受力變形規律,經比較后,得出了三導法是類圍巖中修建連拱隧道的較好開挖方法的結論。
  15. In this paper, based on simulation modeling laws of geometry, constitutive relations, stress conditions and construction, a simulative calculation model has been proposed by considering the mechanical problems during the underground tunnel ' s construction and adopting constitutive models of enveloping type which can consider elasto - plastic materials and their cracking. the model can describe rock multi - media characteristic consider the interrelation of shoring structure and stratum reflect some influencing factors, for example : faultage interlayer joints, construction process and so on

    本文結合地下隧過程中的力學問題,基於幾何、本構、應力狀態和過程等四方面模擬建模的原則,採用可以考慮材料彈塑性和開裂的包絡型本構模型,建立能描述巖體多介質的特點和能考慮隧護結構與地層的相互作用,同時能反映斷層、夾層、節理裂隙以及全過程等影響的巖體結構模擬計算模型。
  16. In this paper, based on simulation modeling laws of geometry, constitutive relations, stress conditions and construction, a simulative calculation model has been proposed by considering the mechanical problems during the underground chamber construction and adopting constitutive models of enveloping type which can consider elasto - plastic materials and their cracking. the model can describe rock multi - media characteristic consider the interrelation of shoring structure and stratum reflect some influencing factors, for example : faultage interlayer joints, construction process and so on

    本文結合地下過程中的力學問題,基於幾何、本構、應力狀態和過程等四方面模擬建模的原則,採用可以考慮材料彈塑性和開裂的包絡型本構模型,建立能描述巖體多介質的特點和能考慮隧護結構與地層的相互作用,同時能反映斷層、夾層、節理裂隙以及全過程等影響的巖體結構模擬計算模型。
  17. With extraordinarily long and densely covered discontinuities in sand rock, blocks are easily formed in surrounding rock mass because of discontinuities combination. stability of potential blocks at different constructional position surrounding rock mass is calculated and sensitivity to influencing factors of the blocks in surrounding rock mass is analyzed using software sasw, which is compiled by the national laboratory of geological hazard prevention and geological environment protection, chengdu university of technology

    程區右岸地下引水室群的圍巖穩定性進行系統研究,可以控制程投資,提高質量和護設計精度;分析評價室圍巖的整體及局部穩定性,消除室穩定的潛在危害,對保證地下室的安全、圍巖的長期穩定以及優化設計具有十分重大的程實踐意義。
  18. On the basis of model test, a better construction method under pre - prop for the surrounding rock i, ii, iii, named whole section excavation with heading in moderate degree and that with center heading and center partition first, then with two sides heading, is put forward

    在模型試驗的基礎上,提出了、 、類圍巖隧道在預護下的優化方法,即下導適度超前全斷面開挖與先行中導及中隔墻、其次兩側下導適度超前全斷面開挖。
  19. This paper, focusing on the construction in the tunnel section with the worse geological conditions, discusses systematically the theory and the actual application on natm, and puts forward the proposal that the natural states of surrounding rock must be disturbed as small as possible and the self - loading of rock should be made full use of. as emphasizing the main point of the method the study of doing extensively the work of the measurements and the relevent analysis in the site takes up the much space in the paper

    本文針對不良地質地段的隧,系統論述了新奧法的理論和在程實踐中的應用,提出了應盡可能少地擾動圍巖的自然狀況並充分利用圍巖自身承載力;重點是要在現場廣泛開展監測作和相應的資料分析;然後根據現場的監測信息以及對圍巖的觀察和認識,對設計進行及時反饋,及時優化護和參數用於和指導現場
分享友人