施工程序 的英文怎麼說

中文拼音 [shīgōngchéng]
施工程序 英文
construction operation
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 程序 : 1 (進行次序) order; procedure; course; sequence; schedule; ground rule; routing process 2 [自動...
  1. In chapter 6, the author studies the procedure of establishing, emending and carrying out logistics examination standard, and gives the common content and sequence of technique standard

    第6章研究分析了物流檢測標準的制定、修訂和實武漢理大學碩士學位論文及各自特點,並給出了編寫技術標準的一般內容和順
  2. Testing method for incombustibility of internal finish material and procedure of buildings

    建築物的內部裝修材料和施工程序的不燃性試驗方法
  3. Promoting construction safety through award schemes, including the site safety model worker award scheme, the site safety cycle and the considerate contractors site award scheme

    透過舉辦各種獎勵計劃,包括地安全之星計劃、安全施工程序及公德地盤嘉許計劃以推廣建築安全意識。
  4. It is very important that the reasonable creep model is adopted to simulate the deformation of the rockfill dam and the reasonable construction processes are also adoped to decrease the deformation and stress of the face slab

    因此,對于分期澆築面板、分期蓄水的水布埡高面板堆石壩,選用合適的流變模型正確模擬堆石體的變形特性,以便採用合適的施工程序減小面板應力變形具有重要意義。
  5. The expressions of displacement fields of dorsal and frontal surface for two piles, row piles and group piles are derived. the solution taking into consideration the effect of construction sequence of jacked pile accords with the actual engineering

    該式考慮到了沉樁的影響,較各樁的簡單疊加更符合實際情況,而且能夠簡化為不考慮的靜壓群樁擠土位移場的解答。
  6. To specify the project, by selecting materials, choosing construction methods, arranging construction process, locating expanding joints, disposing key construction, the outside shell temperature was controlled not exceeding + 25 at surroundings, which met the need of design and check requirement

    針對具體情況,通過材料選擇、方法確定、施工程序安排、膨脹縫的布置、關鍵結構的處理等問題,得出使爐墻外壁溫度控制在環境溫度+ 25的范圍內,滿足設計及驗收規范要求的方法。
  7. Permeable pile dike is an important method for stream control in river restoration or construction, and is of some marked advantages including deep groundwork, large strength, simple construction, little emergency, easy maintenance, effective control on the flow trend and increasing the sedimentation

    透水樁壩是河道整治中的一種,由於其根基深,強度大,施工程序簡便,具有少搶險,易護理,同時具有控導河勢和在灘地緩流落淤等功效。
  8. According to the calculation results, the influences of the construction operation program, the length of the toe slab ( connecting slab ) and the rigidity of the diaphragm wall are compared

    據此,對整個壩體的施工程序、趾板(包括連接板)的長度和防滲墻的剛度進行了分析比較。
  9. Emerson will work with bp to set the standards, processes and implementation procedures for the upgrade projects

    愛默生將同bp公司協作,共同制定標準、步驟以及施工程序
  10. As the upgrading works are done in phases, pray for smooth allocation and reallocation of the classrooms

    施工程序是分階段進行,求神引導在過度期間,課室的安排能順利解決。
  11. The piles are usually laid under the ground or the water, which are convert projects. the problem of quality is easy to come with the various processes, high technology, and great difficult of the projects

    樁基礎通常在地下或水下,屬隱蔽施工程序繁、技術要求高、難度大,容易出現質量問題。
  12. These equipments are of few number, easy to operate, no needing to be transported for long distance and reducing the separating of ca mortar mixture

    機具設備數量少,操作簡單,無需長距離輸送,減少了ca砂漿泌水與分離,簡化了施工程序,並可靈活選擇作業地點,周期短,機械化度高,人作業勞動強度低。
  13. Our “ applied practice ” store in mckinney, texas, uses revolutionary materials, technology and processes to reduce the amount of energy and natural resources required to operate

    沃爾瑪在美國德克薩斯州麥金尼市建立了首家「試驗性」商場,運用創新的材料、科技及施工程序,從而減少營運中所需的能源和其它資源。
  14. It is promised the perfect accomplishment of engineering construction may reach by optimizing the construction program, and that a better economy effect may get through reasonably decomposing the working procedure and alloy of work force

    通過優化施工程序,保證了安全優質地完成,通過合理分解和勞力組合取得了較高的經濟效益。
  15. A rough estimate shows that more than 400 professional positions in the various works departments plus the supporting technical staff had direct involvement in the acp works and adopted acp procedures and practices

    粗略估計,各務部門轄下400多個專業職位的人員連同其他輔助技術人員曾直接參與機場核心計劃的,並曾執行機場核心計劃的施工程序和規章。
  16. This text has recommended containing the kind of the waterproof panel used and waterproof operational procedure in the project emphatically, and explained laying the craft, construction characteristic and main technical requirement of waterproof panel, for relevant projects ' reference

    現著重介紹了暗涵中所使用防水板材的種類以及防水施工程序,闡述了防水板材的鋪設藝、特點和主要的技術要求,以供相關參考。
  17. This paper introduces the labor organization, personnel distribution, operational items, construction procedures and the allocation of the mechanical equipment in the line maintenance of daqin line, and sums up the operational quality and productional efficiency

    介紹了大秦線線路維修作中的勞動組織、人員分、作業項目、施工程序以及機械設備的配備情況,並對其作業質量和生產效率進行了總結。
  18. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居水電站設計和的關鍵技術問題。 、本文對水大體積混凝土溫控問題進行了分析和總結,結合青居水電站閘壩,開展溫度應力及溫度控制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究中溫控措的簡化,以加大澆築尺寸,簡化施工程序,加快進度,節約費用。
  19. At first, i analyses the geological characters, and studies the procedure of the construction of deep water pile foundation of the highway bridges. then i put forward two programs of the construction in this condition : one is the construction of the steel round the barrage before the bore peg ' s, the other is on the contrary, and compare the shortcomings and the advantages of those

    本文通過對巖溶地區公路橋梁深水樁基礎的地質特徵分析,研究了深水樁基施工程序,提出了在巖溶地質條件下先下鋼圍堰后鉆孔樁和先成樁后鋼圍堰的兩種方案,並對兩方案的優缺點進行了分析比較。
  20. Not only t he self - weigh of every beam, the prestressing, the compression on the support of form scaffolding, constriction of concrete, creeping are considered when the inter nal force is calculated, but also the result of displacement and deviation of th esupport and precamber should be taken into consideration

    階段的內力計算不僅考慮逐段梁的自重,預加應力,模板支架的支點壓力,以及混凝土的收縮、徐變;同時還應考慮施工程序中的支座位移、支座偏差和預拱度等的影響。
分享友人