施工進度 的英文怎麼說

中文拼音 [shīgōngjìn]
施工進度 英文
construction progress(rate of progress)
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 進構詞成分。
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 施工 : be in the process of construction; be under construction; build; construction
  • 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
  1. The controlling parameters for smooth blasting in qin - ling zhongnanshan tunnel project are optimized according to the fundamental principle of smooth blasting, considering the minimal resistance, coefficient of embrasure density, coefficient of non - coupling, density of dynamite and rate of exploding. the efficiency of this method has been analyzed and justified by the high speed and good quality of the project

    根據光面爆破的基本原理,從最小抵抗線、爆眼密集系數、不耦合系數、線裝藥密、爆破尺等幾個方面確定秦嶺終南山隧道光面爆破主要參數的選取,分析了該隧道鉆爆設計在隧道中的運用取得的成效,提高了施工進度,同時也保證了質量。
  2. On feb. 14th, ittf president adham sharara visited peking university to inspect the construction work of the table tennis competition stadium for the 2008 olympic games

    2006年2月14日,國際乒聯主席沙拉拉一行來訪北京大學,了解2008奧運乒乓球比賽館施工進度,並參觀了北京大學方正乒乓球俱樂部。
  3. Discusses the optimizing process of treatments of the main technical problems, which include the construction schedule, the field plan and t he balance of earth and rock works, method of the river closure and cofferdams sections, procedure and time of the river colsure, form of the cutoff, construct ion of the cut - off walls

    論述了三峽大江截流及二期圍堰實過程中的施工進度計劃、料場規劃與土石方平衡、截流方式與圍堰斷面形式、截流占程序和時段、防滲形式、防滲墻等主要技術問題的優化完善過程
  4. The author uses the technique of generalized network plan and the key line methods to divide the boiler installation item and build configuration model, adopts the p3 in the building pingliang power plant project to realize the dynamic management of this installation plan, and give news of the project schedule, plan and material to the power plant by the computer network to help the manager

    本文作者應用廣義網路計劃技術和關鍵線路法對鍋爐安裝項目行作業劃分和建立結構模型,並通過p3軟體在平涼電廠在建程中的應用,實現了安裝程計劃的動態管理,並通過計算機網路向電廠發布電建程的施工進度、計劃、材料等方面的信息,為管理層提供了詳實的管理數據。
  5. The main parts of this paper is now be showed in the following : 1 ) the development for the compiling of the schedule had been finished 2 ) the realization of the management function for the schedule system, the base managements can be processed with the management tools. 3 ) the data taken and expressed from the drawing layout system, in the schedule system. 4 ) the data transfer from the schedule system to the drawing layout system

    本文的研究作主要包括以下幾個方面: 1 )適合電廠程的計劃編制功能的開發完成; 2 )實現電廠程的施工進度計劃管理功能,可以利用施工進度計劃編制系統的管理具對施工進度計劃行基本的管理; 3 )實現在施工進度計劃定製系統中對平面布置系統中的數據的讀取和表達; 4 )完成施工進度計劃數據向平面布置系統的傳送。
  6. The technological innovation and optimum design were implemented by the design organization during the working drawing period, as a result, the new technology of separated floor for draft tube bend is applied, and the optimized arrangement plan of structure is more compact, the structure form is more rational, rate of progress is accelerated, about 1. 37 hundred million yuan is saved, which is of significant general benefits

    詳圖階段,設計單位根據創建節約型社會的宗旨,積極開展一系列技術創新和優化設計作,並首創了廠房尾水管肘管段分離式底板新技術,優化設計后樞紐布置更加緊湊,建築物結構形式更為合理,加快了施工進度,節約程投資約1 . 37億元,綜合效益顯著。
  7. Generally, no less than one compaction test is needed for any earth sample. when the sample has a little change, it is necessary to carry out another test, which would have great influence on construction schedule

    一般一種土樣至少需要做一個擊實試驗,土樣稍有變化又需另作,從而給檢測、監理人員造成較大負擔,往往對施工進度有較大影響。
  8. Commodity house opens to booking need to have the following requirement : ( one ) open to booking a person to already obtained estate to develop intelligence letter, business charter ; ( 2 ) concern gold of sell one ' s own things of access of formulary consign land according to land management department, already obtained land access letter ; ( 3 ) licence of program of hold construction project and permit of construction project construction, already dealt with construction project quality and safety to control procedures ; ( 4 ) schedule of affirmatory already construction and complete consign use time ; ( 5 ) 7 achieve main body project below to seal a top ; 7 with what go up, the 2 / 3 above number of plies that main body project must build engineering budget to invest amount ; ( 6 ) already opened commodity house to open to booking a special account in project seat commercial bank ; ( 7 ) the other condition that law, code sets

    商品房預售需具備以下條件: (一)預售人已取得房地產開發資質證書、營業執照; (二)按照土地治理部門有關規定交付土地使用權出讓金,已取得土地使用權證書; (三)持有建設程規劃許可證和建設許可證,並已辦理建設程質量和安全監督手續; (四)已確定施工進度和竣交付使用時間; (五)七層以下的達到主體程封頂;七層以上的,主體程須建到程預算投資總額的三分之二以上層數; (六)已在項目所在地商業銀行開設商品房預售款專用賬戶; (七)法律、法規規定的其他條件。
  9. Basis " urban commodity house opens to booking administrative measure " ( 2004 edit ) regulation, commodity house opens to booking ought to accord with the following condition : 1, already pay is full gold of land access sell one ' s own things, obtain land access letter ; 2, licence of program of hold construction project and construction permit ; 3, by offer the commodity house calculation that open to booking, the capital that devoted development builds achieves the 25 % above that project always invests, had fixed construction schedule and complete due date

    根據《城市商品房預售治理辦法》 ( 2004修訂)的規定,商品房預售應當符合以下條件: 1 、已交付全部土地使用權出讓金,並取得土地使用權證書; 2 、持有建設程規劃許可證和許可證; 3 、按提供預售的商品房計算,投入開發建設的資金達到程建設總投資的25 %以上,並已經確定了施工進度和竣交付日期。
  10. Strengthen roadbed : it can strengthen roadbed, limit the time of construction and the quantity of sand. besides, it makes the road have a long service life

    穩固路基作用:加筋,隔離,穩定路基,加快施工進度,減少砂石用量,防止路面開裂,地基下沉,延長路面壽命。
  11. With controlled pace and sequence of construction, excess heat disperses.

    在對施工進度和程序加以控制之後,多餘的熱量就能散掉。
  12. In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key

    施工進度風險分析計算是施工進度控制中的重要環節。
  13. Schedule of construction ; schedule of operations

    施工進度
  14. The floodgate dam is completed more than 6 months ahead of time in the original piano it can generate electricity about 500 million kw ahead of time, convert about 100 million yuan. 4

    3 .通過溫控研究,簡化了溫控措,加大了澆築尺寸,加快了施工進度,閘壩竣比原計劃提前了6個月。
  15. For other decoration application, the dosage of mortar essence shall be 0. 1 and construction shall be executed pursuant to general criterion requirements ; in plastering mortar, the dosage of mortar essence shall not be increased at will otherwise excessively long coagulation time is required, leading to delay of schedule

    其它裝修水泥砂漿晶摻量為0 . 1 ,按通常規范要求,抹灰砂漿不能隨意增加摻量,否則會造成凝結時間太長,而影響施工進度
  16. ( 2 ) development and application of the light - type cable - stayed hanging - cradle for railway, the hanging - cradle was applied in the construction of large span railway prestressed continous beem bridge, the quality and schedule of the construction was ensured

    ( 2 )開發、應用鐵路輕型斜拉式掛籃,大跨鐵路預應力混凝土連續梁,保證了程質量,達到了最快6d澆築t構一對梁段的施工進度
  17. Simulation and optimization of large hpp construction : to pursue best construction proposal by optimizing theory and method and applying information technology, including layout of access, providing and allocation of construction equipment, coordination of construction progress, arrangement of resources, selection and arrangement of construciton materials to develop three - dimensional modelling and optimize the system

    大型水電模擬與優化? ?根據當前水電組織與管理的現狀,通過優化理論與方法、信息技術等的應用,尋求最優化的組織方案,包括道路的布置、機械的配備與調施工進度的協調、資源配置、材料的優選、料物的優化調配等,開發三維模擬與優化系統。
  18. 5. the project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit

    5 .行了完概率分析,較好地描述了施工進度計劃的不確定性,為期論證分析提供了依據。
  19. In this paper, monte carlo ( mc ) method is used in the research of distributing of construction duration and computation of time parameter of pert network. according to probability viewpoint, critical line and key degree of activity in the network are also defined. aiming at the limitation of application of the mc in large scale the network, the simplified computational method for the network is presented with quantum probability theory and composite method of path in network

    本文用mc ( montecarlo )方法研究了期的分佈規律和pert ( programevaluationandreviewtechnique )網路的時間參數的計算;用概率論的觀點定義了pert網路主導線路和關鍵;針對大型施工進度網路mc方法應用的局限性,採用線路合成方法,引當量概率概念,提出了pert網路的簡化計算方法;根據程搭接網路的特點,將其轉化為廣義pert網路,探討了其施工進度風險的計算。
  20. This paper depicts the engineering outline of the pipeline crossing project as well as a series of new construction methods such as integral pipeline prefabrication, trenching layer by layer, integral lowering pipeline into trench and integral pressure testing, which speed up the construction progress and reduce the construction cost

    文章介紹了穿越段的程概況以及管道整體預制、管溝分層開挖、管道整體下溝和整體試壓等一系列新的方法,該方法加快了施工進度,節約了費用。