施工過程 的英文怎麼說

中文拼音 [shīgōngguòchéng]
施工過程 英文
work progress
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 過程 : process; procedure; transversion; plication; course
  1. During the period of asphaltum - concrete road construction, construction group is huge, whether the construction machines can be attempered reasonably and efficiently, then dispose kinds of unexpected changes, is the key of construction process

    在瀝青混凝土路面施工過程中,群體龐大,能否對各機械進行合理的、高效的調度,快速準確地處理施工過程中出現的各種突發變化,是整個施工過程的關鍵。
  2. Construction of a mass concrete is in the construction process, because of cement let out in large quantity hydration heat and surface of a mass concrete let out heat, make its temperature, humidity cause to ascend and descend, and it causable constringency transform will be unavoidable

    大體積混凝土結構在施工過程中,由於混凝土中水泥熟化時放出大量的水化熱及其隨后的表面散熱,使其溫度、濕度出現升降變化,並由此而引起的收縮變形將是無法避免的。
  3. This paper introduces the construction technology of the super high - rise building with the frame - core tube structure, analyzes on the defects existing in the construction process, and advances some matters that should pay attention to during the constructing

    介紹了超高層框架?核心筒結構技術,分析了施工過程中存在的缺陷,提出了中需注意的事項。
  4. Interference with existing traffic during construction is significantly reduced, and expensive detours can be eliminated.

    施工過程中,大大減少對現有交通的干擾,從而可以不必設置昂貴的繞行道。
  5. 1 sedimentation anyslys of soil under the action of deadweight ; 2 sedimentation anyslys of structure in using ; 3 endogen force anyslys of structure in using ; 4 soil remolding type anyslys ; 5 homogenous flush works anyslys ; 6 anyslys of the structure sedimentation effects of different flushing amount at the same place ; 7 anyslys of the structure sedimentation effects of different flushing places ; 8 anyslys of the structure sedimentation effects of different horizontal flushing places ; 9 anyslys of the structure sedimentation effects of different vertical flushing places ; getting the different between the endogen force of common structure and that of slant structure. the rule of stricture sedimentation and the effect of different soil remolding type were also gained

    對掏土糾偏做了以下9個方面的分析: 1 、土體在自重作用下的沉降分析; 2 、建築物在使用階段的沉降分析; 3 、建築物在使用階段的內力分析; 4 、土體受擾動類型分析; 5 、均勻沖水施工過程分析; 6 、同一個地方沖水量大小不同對建築物沉降影響分析; 7 、不同沉井沖水對建築物沉降影響分析; 8 、進深不同的土層沖水對建築物沉降影響分析; 9 、不同埋深土體沖水對建築物沉降影響分析。
  6. The 40t floating crane played a very important role in the construction of the whole bridge and solved many difficult problems

    在全橋的施工過程中, 40t浮吊起到了非常大的作用,解決了許多難題。
  7. Aspect the evaluation in the now available expressway construction project management is chiefly concentrated at economy with the technology, and to manages the twist hempen thread imitates that the research which appraised chiefly includes in effect which inspected and control evaluation and the construction course the evaluation of some one quotas, the unified evaluation system of not formation ; the twist hempen thread effect assessment method is managed to the now available project item, and stopping certain tier face in the item construction mostly, assessment method adaptability is wrong, and lacks the synthetical evaluation to the scattered assessment method of selection submitted a tender such as beckoning and so on

    現有高速公路建設項目管理中的評價主要集中在經濟和技術方面,而對管理績效評價的研究主要包括監理的效果評價和施工過程中的一些單指標的評價,沒有形成統一的評價體系;現有的項目管理績效評價方法,諸如招投標的選擇之類的零散評價方法,大多停留在項目的某一層面,評價方法適應性差,缺少綜合評價。本文通對現有高速公路建設項目管理評價體系存在問題的分析,結合高速公路建設項目管理的特點,構建了高速公路建設項目管理績效評價內容、指標體系,運用模糊評價法、專家評價法、熵評價法等對高速公路建設項目管理績效做出了綜合評價。
  8. However, in the light of statuary frequency, it is those minor indeterminations that are most decisive in the project and occur most of the time in construction

    但是,按統計頻率,這些認為小的不確定性卻是施工過程中發生的頻率是最多的,而且始終是影響整個目標的關鍵因素。
  9. A movable temporary stay arrangement must be used to limit the cantilever stresses during construction to a reasonable level.

    必須採用一個可移動的臨時拉索裝置將施工過程中的懸臂應力限制在合理的范圍之內。
  10. This paper utilized the deformation characteristics of rock and expatiates on the strain test method of surrounding rock by which to judge the surrounding rock ' s stability, and to choose the suitable opportunity and style of the secondary lining

    摘要利用巖體的變形特性,通測試隧道圍巖應變出隧道凈空實際收斂量,從而判定施工過程中隧道圍巖的穩定性,為選取合適的支護時機和方式提供依據。
  11. Oct. 2006 - may. 2007, join building construction of 8 tricro stynene unit of joint investment by huabei petroleum administration bureau, act as piping engineer and in charge of hydro test work

    2006年10月至2007年5月,參加華北石油管理局投資的8萬噸/年苯乙烯新建,整個施工過程擔任藝管道安裝師,同時負責試壓作。
  12. Secondly, we recommend the practical experiment of cast - in - place piles, including field solid and liquid qualification, experiment purpose, experiment project, experiment equipment, experiment process and the notice of experiment. thirdly, we processed and analyzed experimental daters, studied the rule of strength transferring, and studied the rule of strength transferring of check resistance and side of peg rub resistance, contrasting with common re - draw peg. at last, we advance some unfathomed problem and prospect foreground of cast - in - place piles

    本文首先對支盤樁的基本原理進行了闡述,對其施工過程以及成型進行了描述;然後對本次抗拔支盤樁現場試驗進行了介紹,包括試驗現場地質水文條件,試驗目的、試驗方案、試驗設備以及試驗,並對試驗注意事項進行了歸納總結;分析了支盤裝原位抗拔,研究了樁身軸力傳遞規律以及支盤阻力和樁側摩阻力的荷載傳遞規律,並與普通抗拔樁進行了相關對比;最後,本文提出了本次試驗尚未解決的一些問題,並對支盤樁的前景進行了展望。
  13. Rotating laser is used in earth measurement, mechanical engineering installation and building widely. especially in the upholstery, it can offer a real time standard plane for upholsterer on the walls using rotating laser

    激光掃平儀廣泛應用於大地測量、機械安裝及建築業等施工過程中,特別是在建築內部的裝修中,旋轉的激光束在墻面上形成光束水平面,實時提供一個共同的基準。
  14. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對拱壩期和運行期溫度場、徐變應力場進行了全模擬分析,較為系統的研究了混凝土拱壩期和運行期溫度場、徐變應力場的分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、間隙時間、彈模變化、絕熱溫升、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度應力的影響。
  15. Abstract : the system, in the span - by - span construction of brid ge, willexperience three kinds of shifts from the state of simple beam to the continuous state, from overhanging beam to the continuous beam and from few - spans continuous beam to required degree span by span. meanwhile, structural calculatin g graphics and the internal force are changing with the three shifts

    文摘:在橋梁逐孔施工過程中,體系將發生由簡支梁狀態到連續梁狀態,由懸臂梁到連續梁,由少跨連續梁逐孔延伸到所要求的體系三種轉換,同時結構計算圖式和內力也發生變化。
  16. In order to meet the demand of bridgework, we monitor and analyze the stress and the deflection during the process of bridge construction

    本論文根據橋梁建設的需要,對施工過程中簡支轉預應力連續結構的應力和撓度進行理論分析和監測。
  17. In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up. secondly, based on the well constructing technique which was discovered under the condition of in - situ bumping test and calculating the dewatering scheme of the two dewatering units with the calculation model, the final dewatering scheme was put forward. at last, the final dewatering scheme was appraised by observation during the construction, and it satisfied with the construction request

    本文主要通壩基現場抽水試驗試驗資料整理,在揭示黃土壩基降水特性規律的基礎上,確定可以反映現場抽水條件的的實用降水計算模型和參數;再根據現場抽水條件試驗開發的成井技術和計算模型計算壩基和壩肩兩個水文地質單元的降水井方案,並按類比法確定最終的降水方案;最後,通施工過程中的觀測情況對降水方案進行評價,降水方案能夠很好地滿足的要求。
  18. During the cantilever construction of main girder of a concrete cable - stayed bridge, the main girder at the temporary rigid fixity area of pylon and girder is vulnerable to cracking when the conventional temporary rigid fixity structure is used

    摘要在混凝土斜拉橋主梁懸臂施工過程中,採用傳統的塔梁臨時固結構造存在臨時固結處的主梁容易開裂問題。
  19. These physical and chemical couplings lead to a very complex transient process during the concrete pouring

    由於這些物理,化學因素的耦合作用,使混凝土施工過程成為一個十分復雜的時變
  20. Abstract : through the example of undertaking contracted projects abroad, thi s paper inquires into the decisive role of force majeure terms performance f or later claim indemnity and opposite claim indemnity in engineering

    文摘:通我國對外承包中的一則實例,探討了不可抗力條款的周密、詳盡、無懈可擊,對日後施工過程中的索賠與反索賠及其它糾紛處理中的決定性作用。
分享友人