施工預算 的英文怎麼說

中文拼音 [shīgōngsuàn]
施工預算 英文
construction budget
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 預算 : budget1991
  1. The required levels of construction cost estimates vary at different stages of project development , ranging from ball park figures in the early stage to fairly reliable figures for budget control prior to construction

    ?建築成本估要求的精確程度在項目發展的不同階段發生著變化,從早期的相近數字到控制時相當準確的是數字。
  2. Considering to the continuous rigid - frame bridge construction characteristic, putting forward the idea of reverse to optimize prestressed steel. according to different construction phases, the paper gets the formual of the cantalever phase, join two section of a bridge phase and the vertical prestressed steel, and works out corresponding program

    考慮大跨徑應力混凝土連續(剛構)橋的特點,提出了基於倒裝方法的應力靜定束、合龍束以及豎向束的優化設計理論,並編制了相應的計程序。
  3. But as a kind of mature management system, it has n ' t been applied successfully in most of chinese companies. the reasons of that include misunderstanding of science property of overall budget management 、 unfit budget management organization 、 lack of scientific management methods, and another important reason is that most of companies use the traditional building method of budget management system. the traditional building method based on the company ' s existing department functions, keeping the existing management process and work process fixedness, and expressing the department ' s work plan in quantity or currency form as their budget

    然而全面管理作為一項比較成熟的管理體系,在我國大部分企業卻並沒有得到很好的實,這其中固然有對全面管理科學性認識不足、編制作的組織不到位、缺乏科學的管理手段和控制手段等原因外,另一個重要原因是大部分企業在構建全面管理體系時使用的是傳統的構建方法,即基於企業現有的部門職能劃分而進行的,在保持作業流程和管理流程不變的情況下,將部門作計劃以貨幣或數量的方式表示出來,即成為公司
  4. This procedure can imitate the single well pumps water the chronometer calculates at all point water level in district declines deep with horary variety ; study the sport law of the rivers ; solve definitely flow draw water issue wanton boundary the wells of termses, predict that dives under water in the location, guide and construct and excavate the progress, appraise the rationality of the precipitation scheme

    此程序可以模擬單井抽水時計區域各點水位降深隨時間的變化,研究水流運動規律;求解任意邊界條件下的井定流量抽水問題,測潛水位,指導開挖進度,評價降水方案的合理性。
  5. With resonable calculating model and dynamic analysis method, the construction control elevation can be decided and so the precompression difficulty of support can be solved in the construction of large - span arched bridge

    採用精確的計模型和動態分析技術,一次性給出控制標高,解決了大跨度拱橋有支架中支架需要壓的問題。
  6. This paper, aiming at the problems in petroleum enterprises ' budget management, presents the approaches to enhance budget management : ( 1 ) establish the specified budget management section and clarify its responsibility ; ( 2 ) schedule the budget on the basis of strategy of the petroleum enterprises ; ( 3 ) set up the flexible budget target, budget alarm and budget result query ; ( 4 ) adjust budget dynamically and simultaneously ; ( 5 ) adopt the applicable measures and encouragements, reanimate wide participation in budget management

    摘要針對油田企業管理存在的問題,闡述了加強管理的途徑和措:設置專門的管理機構,並建立作崗位責任制;以油田企業戰略為基礎編制;設置彈性指標,建立警機制和結果質詢制度;適時調整、編制動態;採取有效的考核與激勵措,鼓勵全員參與管理。
  7. Working drawing estimate

  8. We can say that it can develop the usage of soil nailing wall fill the rank of piles disadvantage a bright future of developing and using. the development, application, advantage and disadvantage about the " prestress anchor ribbed beam support system " is introduced in chapter 1 : it " s supporting mechanism and structural feature is introduced and compared with the soil nailing walls and un - embedded rank of piles in chapter 2 ; design and computer steps and more details about the design methods of the support system are introduced in chapter 3 ; the two important parts named draperies and anchors are introduced on their construction technology in chapter 4 ; three foundation trenches " instances with different depth in different soil are showed in the last chapter 5

    本文在第一章概論部分介紹了「應力錨桿肋梁支護結構」的發展、應用和優缺點;第二章分析其支護機理、結構特點,並與土釘墻和無嵌入排樁多錨支護進行了結構受力對比分析;第三章介紹該支護結構的設計計方法步驟,詳細介紹了支護結構各部分的設計方法;第四章介紹應力錨桿肋梁支護系統最重要的兩個部分:帷幕和錨桿的技術;第五章介紹了不同土層不同深度的有代表性的三個基坑程實例。
  9. Build - transfer - operate - private proponent finances and constructs facility on a turn - key basis assumes cost overrun, delay, specified performance risk

    -私營提議人在準備將其移交的基礎上籌措資金並建造該設(包括承擔成本高出程延誤及質量保證等風險)
  10. I love my profession and treat it as my life caree, trying to the best in working progress and do good job in team work. studying is the most importing thing to me and it will go with my life

    熱愛專業,具有設計和現場經驗,熟悉施工預算及招投標作,能從容和業主交流,欲從事景觀設計作及相關管理
  11. Moreover, there are drawbacks like difficulties in stimulation, complexity of calculation and heavy work in all these models because of many other factors. for example, the complexity of the dam structure, difficulties in measuring the physical and mechanical parameters of building materials and subgrade soil, stimulating the geologic structure of subgrade, predicting effects of loads, construction and environment on the dam and so on

    此外,由於大壩結構復雜,建築材料和地基巖土的物理力學指標難以測定,復雜地基的地質構造還很難模擬,荷載、及環境因素對水建築物的影響還很難準確測,應用各種模型都存在著模擬困難、計復雜、作量大等不足。
  12. Combining with the performances of danshan bridge, discussing the methods on the construction controlling and calculation of cable - stayed bridge, this paper raises an efficient construction controlling system, and realizes collecting construction data of the real bridge and technical information. by analyzing on the difference of theoretical calculation and real construction state, the author determines to take self - adapting construction controlling method which uses kalman filter method to identify and adjust construction parameters. by getting rational construction state from forward iteration method, this paper, taking concrete creep effect in consideration, raises a rational scheme to pre - remain deformation and adjust cable force

    結合丹山橋的結構特點,通過對斜拉橋控制及結構計方法的探討,提出了有效的控制系統,實現了對實橋數據和技術信息的採集;通過分析理論計與實際狀態的差異,確定了以卡爾曼濾波法作為參數識別與調整的自適應控制方法;通過正裝迭代法確定其合理狀態,並考慮混凝土的徐變效應,提出了合理的留拱度和索力調整方案。
  13. Article 34 with respect to major public construction projects and major policy implementation plans, before the budget estimates and budget proposals are compiled, a cost efficiency analysis report on the alternative measures and substitute measures must be first drawn up and attached with a description of the financing and capital employment. and the report should be forwarded to the legislative yuan for its files and reference

    第34條重要公共程建設及重大政計畫,應先行製作選擇方案及替代方案之成本效益分析報告,並提供財源籌措及資金運用之說明,始得編列概案,並送立法院備查。
  14. To improve it infrastructure services, a comprehensive set of office automation services was delivered in 1997. they include electronic mail among the hkma, the hkmc, the land fund office, hkmas new york office and quarry bay office ; sending and receiving fax on individual pcs ; internet connectivity through the electronic mail network ; and administrative work automation, suchas annual budgeting and annual staff appraisal

    為了改進資訊科技基礎設服務,一九九七年推出了一套全面的辦公室自動化服務設,包括金融管理局香港按揭證券公司土地基金辦事處以及金融管理局紐約辦事處和魚涌辦事處之間的電子郵件系統在每位職員的個人電腦上收發傳真透過電子郵件網路接駁網際網路以及將每年的開支和年度職員作表現評估等行政作自動化。
  15. According to the principle of ring - like strands operation, the mechanical analytic solution of presressed concrete penstock under the uni - ring - like radial loads is given out based on the theories of elastic footing beam

    根據環形應力作用機理,結合彈性地基梁理論,提出了單環應力作用效應的計方法和應力混凝土壓力管道階段的驗方法。
  16. In this thesis, aim to the beam axis shape be exactitude for design, the internal force of the beam be appeased by design request, the concept of modem cybernetics is applied, at the same time, the effecting parameter has collected. the paper build the ann model in predicting the beam camber an construction and discuss indetail the extraction of inputting nodes information when quoting the fundamental principle of ann model and introducing research process of the improved bnn. according to them, ann is applied in the construction control of prestressed concrete continuous bridge

    本文以大橋成橋線形滿足設計要求和成橋內力控制在設計容許范圍內為目的,運用現代控制理論的思想,引用神經網路基本原理,詳細介紹bp神經網路的研究過程,從而建立應力混凝土連續梁橋拱度的神經網路模型,並詳細討論了模型的神經網路結點信息的提取,在程實例的基礎上進行了數值計武漢理大學碩士學位論文,數值表明,將神經網路應用於應力混凝土連續梁橋控制,獲得了滿意的結果,在應力混凝土連續梁橋控制技術研究方面,具有方便有效、精度高的優點,具有良好的應用前景。
  17. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載設計理想狀態建立了懸索橋原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計、吊索無應力長度計、空纜線形與偏量計、絲股架設線形計、索夾安裝位置計和加勁梁吊裝線形計的具體方法、數值演法及軟體sgkz2000的計模塊的實現。
  18. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸索橋的控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了,提出本文關于懸索橋的主纜無應力長度控制、索鞍偏量控制、錨跨張力控制、絲股架設控制、索夾安裝位置與吊索長度控制的方法;介紹了吊梁階段鞍座頂推量的確定與控制方法,分析了階段懸索橋的線形變化過程。
  19. In this essay the technique of the structure calculation and error adjustment measures used in bridge construction prefigurative deviation control was researched based on the construction control and monitor project of wuhan caidian han river bridge

    本文主要結合蔡甸漢江公路大橋的監測監控項目,研究拱度控制的結構計和誤差調整方法。
  20. With checking and optimization, some rational suggestions on bridge location, shape and overall arrangement is put forward. after construction checking, the author also puts forward some requests for construction pre - cove and safety pier setting, at the same time gives optimum design on joint balance pier. construction structure checking indicated that not only the strength and stability coefficient of rotation stiffness framework is affluent, but also the section size

    通過驗及優化,對該橋推薦方案的橋址、武漢理大學碩士學位論文橋型及橋梁總體布置提出了合理化的建議;通過,對拱度及保險墩的設置提出了要求,對交界平衡墩進行了優化設計;結構驗表明,轉體勁性骨架強度、穩定性富餘系數較大,截面幾何尺寸過大,結構設計過于安全保守,並提出了結構優化的方法,從而大大節省了程投資,加快了程進度,增強了橋梁的美觀。
分享友人