旁通水管 的英文怎麼說

中文拼音 [bàngtōngshuǐguǎn]
旁通水管 英文
bypass hose
  • : 名詞1 (旁邊) side 2 (漢字的偏旁) lateral radical of a chinese character (e g 亻 氵 etc )Ⅱ形...
  • : 通量詞(用於動作)
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 水管 : waterpipe; water carrier; aqueduct; water conduit; water pipe; syphon; siphon (消防) 水管車 hos...
  1. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河庫供工程取頭部由引渡槽、節制閘、進閘、泄閘等建築物組成。由於本工程場地條件限制,增設后布置非常緊湊,道急轉角度大且轉彎距離較小,對于流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。具有上與泄要求,對其過流能力也要經試驗確定,為碧流河庫增建設計提供依據。
  2. The latter may be used with bypass or throttling valves in the tower water pipework circuit.

    近來,可採用在冷卻塔的系統中設置閥或節流閥。
  3. Probes into the pressure regulating range of the water replenishing and pressure fixing system on the by - pass pipe

    定壓系統調壓幅度確定方法的探討
  4. The paper analyzes the non - lineal relations of the quantity of heat exchange and water flux of coil exchanger in part - load operating condition, the shortage of deciding the water flux in bypass pipe, the disadvantage that the operating condition of pumps and chiller ca n ' t be met with the load change of the air conditioning system in different operating condition of using pressure - difference bypassing control in primary water pump system. using load control method in the change of the operating condition of primary water pump system can realize that the load change is small and reasonable in the on / off condition of pumps and m m chiller by comparing load control method in primary variable - flow water pump system with pressure - difference bypassing control method, back water temperature control method

    本論文從目前空調工程中使用的變流量系統入手,研究了盤換熱器在部分負荷下流量與換熱量的非線性關系,分析了文獻中介紹的流能力選擇的不足之處和一次泵系統採用壓差控制時,工況轉換不能滿足系統控制要求的缺陷;比較了一次泵變流量系統中壓差控製法、回溫度控製法、負荷控製法的精確性,並得出了在一次泵系統的工況轉換時,採用負荷控製法能使冷機組及其相應泵在啟停時的負荷變化范圍較小,更符合建築物的冷量需求,節能效果較好的結論。
  5. For the purpose of solving the interconnection of the heating supply between the small high - rising building and multi - storied building, this paper advances that the pressure fixing system on the by - pass pipe should be used in the secondary network system, and probes into the pressure regulating range of the water replenishing and pressure fixing system on the by - pass pipe

    為了解決小高層和多層建築的供熱並網問題,提出了將定壓系統應用於二次網系統中,並對定壓系統調壓幅度進行了探討。
分享友人