時間段排序 的英文怎麼說

中文拼音 [shíjiānduànbèi]
時間段排序 英文
slot sorting
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • : 排構詞成分。
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  • 排序 : collate
  1. Whereas the programmer approaches the problem from the point of view of the application performance, a dba can approach the problem with an understanding of the database itself, and can offer advice and suggestions for the database layout, arrangement of tables and indexes, and effective use of informix and system resources, including data fragmentation, pdq priority, cpu time, memory utilization and data storage

    員是從應用程性能的角度來考慮問題的,而dba考慮問題理解了數據庫本身,從而可以對數據庫的布局、表和索引的安,以及informix和系統資源(包括數據分、 pdq優先級、 cpu、內存利用率和數據存儲)的有效使用提出意見和建議。
  2. The theoretic formulas imply that mimo system can make use of multipath fading in full of scatter enviorment and its channel capcacity is in proportion to the transmt or receive antenna. 2. paper mainly explains the basic principle of bell laboratory layered space - time ( blast ) architecture

    2 .論文重點闡述了實現mimo系統中空復用技術的貝爾實驗室空分層( blast )結構的基本原理, blast結構作為實現mimo系統巨大容量的一種有效的手,其核心是基於的串列干擾消除( osic : orderingsic )檢測演算法。
  3. As a result, invisible points can be culled view - dependently in high efficiency for hardware acceleration, and at the same time, the advantage of sequential point trees could be still fully taken. therefore, the new method can run much faster than the conventional sequential point trees, and the acceleration can be highly promoted particularly when the objects possess complex occlusion relationship and viewed closely because invisible points would be in a high percentage of the points at finer levels

    具體地說,從根結點開始,我們將點模型樹按照廣度優先的方式一層結點一層結點地順列在列一層結點,我們引入迭代的z型列來安這些結點在列中的位置,使得空上鄰近的點在列中的位置也是靠近的而在每個非葉子結點,還記錄它的兒子結點在列中所處的片位置。
  4. After analyzed the basic principle of optimized noise reduction on tyre pattern, summarized three approaches to noise reduction. the first is trying to reduce size of single block or socket to reduce noise amplitude on time domain, the second is to adjust stripes sorting order and their interlace value to avoid noise - made by every single block - peak values on time domain overlayed and the last is to adjust ratio of blocks and sockets, ratio of stripe interval and stripe sorting order to avoid noise periodical distribution and abnormal high peak values in some frequency strip

    論文第四章分析了輪胎花紋優化降噪的基本原理,總結出三條降噪途徑:在允許范圍內盡量減小單個塊或槽的大小、刻刀槽軟化花紋塊來減小噪聲域波幅度;調整節距列順、花紋條之的錯位值,使各發聲單元發出的聲壓域波形的同向峰值錯開,避免同向峰值疊加;調整花紋塊和槽比例、節距比例、節距列順,盡量避免周期性分佈,使輪胎所發出的噪聲趨于白噪化,避免某些頻的異常高峰值。
  5. Considering the np - complete problem, how to get the approximate optimized scheme of job - shop scheduling, and aimed at improving the efficiency of products and taking good advantage of concurrence, asynchronism, distributing and juxtaposition in multi - products and devices processing, we could divide the working procedures into the attached one which has the only precursor and subsequence and unattached one by analyzing working flow chart of job - shop, that is the working procedures are divided into two types, then the bf and the ff methods about memory scheduling in os are applied, therefore a new approximate optimized scheme is presented in the paper which could solve the common job - shop scheduling. namely, the acpm and the bfsm are applied to the classified and grouped working procedures considering the compact of the procedures and practical examples approved it. the results we analyzing and tested show that it is better than the heuristic algorithm common used, for less restriction terms, more satisfying algorithm complexity and better optimized results

    針對job - shop調度問題求最優解演算法這一npc問題,本文以充分發揮多產品、多設備加工所具有並發性、異步性、分佈性和并行性的加工優勢,從而提高產品的加工效率為目標,對job - shop調度問題的工藝圖進行適當分解,使工在一定或是為具有唯一緊前、緊后相關工或是為獨立工,即將工分兩類,再結合操作系統中內存調度的最佳適應( bf )調度方法和首次適應( ff )調度方法的先進思想,通過分析提出了一種解決一般job - shop調度問題的全新近優解方案:在考慮關鍵設備上工盡量緊湊的前提下,將工分類、對這兩類工分批採用擬關鍵路徑法( acpm )和最佳適應調度方法( bfsm )安的演算法,用實例加以驗證,並給出結果甘特圖。
  6. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程,以此作工具對滑裂面的后移、土釘錨固的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力的關系等結論;採用大型通用有限元數值分析程ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互作用,得出了有關第一土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及墻背有摩擦的坡面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  7. A study on modeling, scheduling and optimal control problems for a class of hybrid manufacturing systems is investigated. in this framework, the discrete entities have a state characterized by a temporal component whose evolution is described by event - driven dynamics and a physical component whose evolution is described by continuous time - driven dynamics, thus it is a typical hybrid system. not only the optimal control for manufacturing process like that discussed in many references but also the optimal machining sequence are considered in this paper. the whole problem is solved by a two - level optimization method : at the inner loop, for any given machining sequence of the jobs, the optimal control for manufacturing process is considered ; while at the outer level, an improved genetic algorithm is used to decide the optimal machining sequence of a batch of jobs to be processed. finally, some examples are given to illustrate the validity of the algorithm

    研究了一類單階混合製造系統的建模、分析與調度問題,這類系統既包含離散事件動態,也包含連續動態,前者用隊網路描述,後者用微分方程描述.不僅考慮了a這類系統的最優控制問題,而且考慮了工件進入生產線的最優,並用一個復雜的優化模型描述,同給出了一個兩層優化方法,內層給出對給定工件列的最優控制,而外層用一改進的遺傳演算法求解工件進入生產線的最優列.若干模擬實例說明了演算法的有效性
  8. This rss file contains the most recent items from the participant weblogs, in reverse chronological order

    這個rss文件包含了參與者weblog中所有最近一的條目,按照從新到舊的列。
分享友人