時間預調鍵 的英文怎麼說

中文拼音 [shíjiāndiàojiàn]
時間預調鍵 英文
time preset key
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 名詞1 [機械工程] (使軸與齒輪、皮帶輪等連接並固定在一起的零件) key 2 [書面語] (插門的金屬棍子)...
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  1. During the temperature fields, the results indicate that the processing parameters such as the extrusion velocity, casting temperature, perform preheating temperature, die preheating temperature and so on are important for the temperature fields besides the dwell time. they are must be in concordance each other to the deforming zone is in the quasi - solid state, and the stable semi - solid extrusion is implemented. during the deforming fields, the hyperbolic sine thermo - rigid - viscoplastic fem model is selected according to the forming feature of the process, and the variations of the stress - strain fields are studied

    在溫度場的模擬中,模擬結果表明,保壓是影響製件成形質量的關因素之一,擠壓速度、液態金屬澆注溫度、制體熱溫度和模具熱溫度等工藝參數對溫度場的影響也很大,需進行參數之的協調,只有當變形區內部始終維持準固態,才能實現穩定的液-固擠壓成形過程;在變形場的模擬中,根據液態浸滲擠壓的成形特徵,選用了雙曲正弦剛-粘塑性有限元計算模型,研究了變形過程中應力應變場的變化規律,研究了模角對變形和金屬流動的影響及變形力的變化過程和其影響因素。
  2. The optimization model of the cable tensile force is established, resolving the ideal finished state of considering syntheticly the requirement including the dead load, active load and presress of structure, meanwhile, providing a forward - calculating method for determining the rational construction state on the foundation of the optimization model. on the other hand how to determine and adjust the important parameter, the cable midst tensile forces and the main feam form setting levels in constructing cable - stayed bridge, has also been analyzed, besides, the corresponding calculation method is introduced and applied to the actual construction controlling of xian tao han jiang highway bridge well

    本文以仙桃漢江公路大橋為工程背景在斜拉橋設計計算方面進行了的研究,建立了斜拉橋索力優化模型,一方面解決了能綜合考慮結構恆載、活載及應力等多方面因素的理想成橋狀態確定問題;另一方面在確定合理施工受力狀態問題上提出了一套以索力優化模型為基礎的正裝計演算法。同對斜拉橋施工中關參數斜拉索中索力和主梁立模標高的確定和調整做了進一步的分析,提供了相應的計算方法,並應用於仙桃漢江公路大橋施工控制過程中,取得了良好的效果。
分享友人