最大下載速率 的英文怎麼說
中文拼音 [zuìdàxiàzǎisùlǜ]
最大下載速率
英文
max. download speed- 最 : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
- 下 : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
- 載 : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
- 速 : Ⅰ形容詞(迅速; 快) fast; rapid; quick; speedy Ⅱ名詞1 (速度) speed; velocity 2 (姓氏) a surna...
- 率 : 率名詞(比值) rate; ratio; proportion
- 速率 : speed; rate; tempo
-
The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated
本文利用大變形固結有限元分析程序( lscfea )中的小變形平面固結分析單元( sse2 ) ,結合實體工程項目進行了地基固結沉降的有限元計算,分別得出河灘相軟土地基在考慮砂井和未考慮砂井作用下的固結沉降曲線及杭甬高速公路試驗段在高堆載情況下的固結沉降曲線;並對以上曲線特徵進行了分析,得出各時間段曲線斜率、角度在整個斷面的變化規律,以及沉降最大值與斜率、角度變化之間的線性回歸關系。He finds the pitch range after calculated the three important parameters through the bladed for windows software, then presents an optimized control strategy that regulate the pitch angle in terms of the wind speed. it must control the output power because the variational output power brings the variational loads. he confirms and optimizes the control strategy that the output power is the control target, the output power is divided into three parts
將功率作為系統控制的目標,將功率分成三段進行控制,在低風速區,載荷是有限的,以功率最大化作為控制目標;在額定風速附近,由於處在升力曲線斜率的變化點,功率變化較大,應盡快調整槳距角進入失速區工作,減少載荷的波動,該額定風速區的上下工作點要通過現場試驗的手段來確定;在額定風速以上,使功率維持在額定輸出,減少功率波動,並通過bladed軟體的模擬計算對控制策略進行了驗證。Secondly, to achieve the independent regulation of active and reactive power output from the generator side which is designed for the purpose of tracing the maximum wind - energy capturing. the paper has analyzed the mathematic model of the ac excited doubly - fed machine and the stator field orientation control strategy of the motor as vscf wind power generator. thirdly, it has put forward and designed the dual pwm converter with the capacity of energy flowing bidirectional aimed at the demand of rotor energy bidirectional flow. the author constructed reliable and integrated experimental system and did a series of experimental study including no - load, cutting - in network and power generation at, below and above the synchronous speed
論文首先分析了風機運行特性及其最佳風能利用原理,通過模擬及實驗驗證了採用直流電機的輸出特性模擬風力機的最大輸出功率曲線的可行性,並給出了模擬系統的硬體結構;然後為了實現交流勵磁發電機有功、無功功率獨立調節機理,分析了交流勵磁雙饋發電機的數學模型和在追蹤最大風能捕獲變速恆頻風力發電時必需的定子磁鏈定向矢量控制策略;針對雙饋發電機轉子能量雙向流動的要求,提出並設計了具有能量雙向流動能力的雙pwm交流勵磁用變頻器;最後為實現從理論到實踐的全面研究,研製出了一套小功率完整的雙pwm變頻器交流勵磁的雙饋風力發電機實驗系統,進行了空載、並網、同步速及上、下的發電運行等一系列的運行實驗;所完成的模擬和實驗研究均驗證了理論、模型和控制策略的正確性、可行性。Loading grads is another non - structure coefficient influencing loading characteristics except loading frequency. the low grads characteristics are analyzed deeply by simulation, and found that applying structure invariance principle with acceleration compensation can reduce loading grads effectively. the dissertation also simulates and compares the systems with connect hole of different size, and founds that the size of connect hole has an optimized value
加載梯度是除了加載頻率之外另一個影響加載性能的非結構上的參數,論文作了大量的模擬分析來研究小梯度加載特性,得出了具有加速度補償的結構不變性原理可以有效的降低小加載梯度時的多餘力矩的影響;通過對具有不同的總壓力流量系數的系統的模擬比較,得出了連通孔的大小在不同工況下存在一個最優的值,其開度需要合理的選擇。Through the developed mutual - feed test bed, it is proven that the control program features accurate speed regulation and is capable of load simulation at different locomotive working modes, which reaches the requirement of high power test system
最後通過研製的互饋試驗臺證明該控制方案可以精確調速,同時能夠模擬機車各種工況下的負載,滿足大功率試驗系統的要求。According to the characteristics of the piston pump when it works with the diesel engine, the different outer load leads to different rotational speed and mechanics characteristics of the piston. in order to learn the property of the movement and mechanics of the piston but not experimentalize, simulink which is the simulation toolbox of matlab ( the most popular large - scale mathematic software ) is carried out to simulate the process of the movement and the receiving force of the piston
根據發動機和全功率軸向柱塞泵的工作特性,柱塞泵在受到的外負載不同時,柱塞的轉速和受力情況就不一樣,為了能在不做實驗的情況下就能了解柱塞的運動特性和受力特點,利用現在最為流行的大型數學軟體matlab的模擬工具箱simulink對其進行了運動和受力的模擬分析。分享友人