最大流量計 的英文怎麼說

中文拼音 [zuìliúliáng]
最大流量計 英文
peak flow meter
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
  1. Fluid noise mainly comes from out put pulsation of rate of flow, the main reason of out put pulsation of rate of flow is the instant high pressure return flow that obturation cubage produced when the big round curve pressure transition. the v trough on the port plate can reduce the fluid noise. in this paper, the author based on the acting of dam a river and condensability of liquid and used matlab language as tool to calculate the v trough on the original port plate and drew out the p - t diagrammatic curve and analyzed its shortcoming and improved the design of original v trough and got that the best size of its angle was 12. 3 and its length was 5mm and the cross section was an equilateral triangle

    體噪聲主要來源於輸出脈動,造成輸出脈動的主要原因是閉死容積在圓弧段壓力切換時產生的瞬時高壓迴,在配盤上開設v型尖槽可降低因高壓迴而引起的體噪聲,本文以截作用和液體的可壓縮性為理論依據,以matlab語言為工具,對原配盤上的v型尖槽進行了理論算,繪制出p - t圖線,分析了它的不足,並對原有v型尖槽進行了優化設,得出了v型尖槽的佳幾何尺寸:配盤平面上的v型尖槽的兩邊的夾角為12 . 3 ,槽長5mm ,槽的橫截面為等邊三角形。
  2. Dubai is also working on a project to build the world ' s biggest airport at jebel ali, one that is eventually planned to have six parallel runways, with the capacity to handle more than 120m passengers a year

    迪拜也在建造另一個工程項目:在傑貝阿里興建全球的機場,該機場終擁有6條平行跑道,每年的旅客將逾1 . 2億人次。
  3. ( 6 ) according to the relation of pressure and discharge of different orifice aperture from the experiments. the largest available length of lateral pipes was calculated, and the combined method of varied orifice aperture and equal discharge in lateral line was discussed

    ( 5 )根據實測的不同孔徑的壓力關系,算了允許毛管長度,並在理論上對變孔徑等毛管組合方法進行了探索。
  4. With new technique and solid, reliable, safe and nice design, rhein - p ( m ) is the certain choice for pubic place, where a great deal of people are transported

    型自動扶梯以新的技術及堅固、可靠、安全、美觀的設,是公共場所,運送人群的必然選擇。
  5. Chemical fume hoods shall be of air foil design with 45 degree sloped sections on the sides and top of the hood opening to insure maximum containment and minimum eddying of air currents

    化學通風櫃應採用風道設,側面成45度坡度,罩頂開口,以確保抽氣、空氣渦小。
  6. We can get communication traffic distribution graph combined with network topology, to make certain hypothesis and then, according to mark - num algorithm, to get the maximum network traffic

    論文結合對算機網路拓樸的研究,通過分析得出了網路的交通分布圖。根據標數演算法,求出網路
  7. It makes the deduction on design tidal level process more reasonable than ever. finally, taking into account the observed data of tidal level are much more integrated than observed data of tidal discharge and the correlative relationship are established based on large numbers of samples. then, the sub stage maximum tidal discharges and tidal velocities are obtained according to the regressive equations and the observed tidal level, and the sub stage design maximum tidal discharges and tidal velocities are estimated by way of frequency analysis

    後,針對橋位河段實測潮資料短缺而潮位資料相對完整的實際情況,基於樣本建立了潮與潮汐要素的相關關系,利用實測長系列潮位資料得到分期、潮速系列,經頻率分析確定了分期設、潮速。
  8. In the part of the transmitter, the pre - amplifier logarithmic amplifier, temperature complement circuit, anti - disturbing circuit, and v / i circuit, are discussed. the transmitter outputs 4 - 20ma. in the part of the displayer hardware design, the i / v convert circuit and the flame intensity signal processing circuit are introduced

    在探頭的設中,詳細介紹了前置對數放器電路設,在對數放器加入了溫度補償電路和抗干擾電路,以保證測精度和較程,後信號經電壓電的轉換,得到4 - 20ma的標準信號作為探頭的輸出信號,進行遠傳。
  9. This paper, on the basis of yuelu - mountain high - tech park in changsha city, beginning with the investigation of diversiform transit - trip in the park, firstly analyzes and evaluates space - time change law of traffic flow and situation of traffic service level on actual road net - work in the park ; secondly, applying multi - statistical analysis method, taking investigated corporation as sample, using annual freight traffic volume produced by unit plant area of the corporation, with clustering analysis, obtains four sorts of the sample corporation, and establishes the predict models of freight traffic volume for every kind of corporation. with these models, actual or planning year ’ s day maximum freight traffic volume can be predicted. the third, this paper makes analysis research of trip law of employees in the park, and obtains the index of trip times, trip modes and trip development trend of the employees

    本文以長沙市嶽麓山高科技園區為依託,從調查園區內的各類交通出行開始,首先分析評價了園區內現狀道路網上的交通時空變化規律及道路網上的交通服務水平狀況;其次是應用多元統分析方法,以調查企業為樣品,以企業單位車間面積所產生的年貨運交通為變,通過聚類分析,獲得了樣本企業的四個類別,並建立了各類企業貨運交通的預測模型,應用這些模型,可預測園區內現狀或規劃年的日貨運交通;第三是對園區內企業員工的出行規律做了分析研究,獲得了企業員工的出行次數、出行方式及出行發展趨勢等等特性指標;後是對園區內小區居民的出行狀況進行了分析,獲得了居民出行的諸如高峰時段、高峰出行等等的特徵數據。
  10. Taking load uncertainties, infeasibility problem and multiple objection of the reactive power optimization in the radial distribution system into consideration, loads are modeled as fuzzy interval numbers. fuzzy power flow is proposed based on fuzzy interval load for the more practical membership function of line losses rate and maximal voltages offset. this thesis presents multiple objection model of the reactive power optimization considering uncertainties using the fuzzy set theory

    對配電網電壓無功優化問題中負荷的非概率性的不確定性問題、多目標問題、約束不可行性問題進行了研究,用模糊區間來描述實際的負荷情況,並用負荷的模糊區間值算配電網的潮,得到有功功率損耗和電壓的模糊區間值,使網損率和節點電壓偏移的隸屬函數更接近實際情況;將改進遺傳演算法與模糊集理論相結合,通過求解多目標函數和約束條件的模糊集合的交集,得出網損率和節點電壓偏移小的優運行狀態。
  11. Of them, great current capacity high accuracy pump test panel project has carried on tender on the internet, finally passed through the quality synthetic evaluation, and determined to be constructed and exploited by province mechanical and electrical design institute unit. after the project completed, it could expand the new product productivity, and substitute the import product

    其中高精度泵測試臺項目進行了網上招標,後經綜合評價,確定同省機電設院聯合開發建設,項目建成后,能擴新產品生產能力,並能替代進口產品,提高企業經濟效益是十分必要的,同時對提高我國泵類製造水平勞動地區,同行業發展也是有現實意義的。
  12. Meanwhile, a new system is set up and its maximal flux, the maximum online people, the longest response time are estimated and successful result is obtained sequentially

    以此為基礎,構建了一個新系統,算了該系統的多在線人數和長的響應時間,取得一定的實際效果。
  13. This dissertation is faced to the process of steel rolling to found network of manufacture material flow, basing on it founding guide line evaluation system of the cost of unit standard producing working procedure, guide line evaluation system of the quality cost of unit standard producing working procedure and guide line evaluation system of performance and efficiency ; and base on the cost data of all kinds of material flows, manufacture flow, flux data, manpower, energy consume, material consume, capital asserts occupied, fund occupied, and the production in working procedure, throughput of the materials in working procedures in the flow and countercurrent flow in the network of material flow of recorded in working procedure producing, using the “ whole closed down lane ” model to describe network of manufacture material flow of steel rolling, found the cost analyzing model system of the network faced to producing process. make the cost increasing of the producing by abnormity material flow in working procedure, and even the cost increasing of the producing procedure as the cost of the management behavior of working procedure fallen under cost evaluation guideline in responsible working procedure, so as to ration measure the factors fast correlated with management behavior by measuring the cost

    在企業管理信息化輔助工具所建立的數據平臺基礎上,建立了以基準物圖模型為基礎的軋鋼生產主程物網路拓撲圖,根據圖論的理論求解小費用;算每個生產節點的加工成本,分離質成本,克服了單純財務數據進行成本核算所帶來的缺陷;建立了軋鋼生產主程工序含鐵物料吞吐能力基準圖模型,並根據此模型建立了軋鋼生產主程工序激勵物協調性和匹配性、工序響應物協調性和匹配性分析的過程能力指數算方法;通過引入決策單元綜合投入與綜合產出效率優原則的模型和基於投入不變、分析產出是否有效或基於產出不變、分析投入是否有效的模型,實現了對多個績效指標在不同績效值集合之間的相對比較,並可根據投入產出效率準則、或者投入(產出)有效性準則進行排序。
  14. According to the scales of small residential communities, the number of people, water supply of small residential communities have its characteristics with regulations, namely the flux formula differs from flow per second and maximum flow per hour used in water supply, but between them

    住宅小區供水因受其供水范圍和人口數的影響,其用水規律有其特點,即其設應不同於按日瞬時用水所確定的建築內部的設,又不同於按城市給水算所得到的平均秒
  15. The results show that instrumental error in open system is more than 8 %. the main error is owing to co2 analyzer and flowmeter. and instrumental error in closed system is more than 1. 5 %

    研究表明:開路系統儀器誤差通常在8以上,主要誤差源為co _ 2分析器和;閉路系統儀器誤差通常在1 . 5以上,誤差源以co _ 2分析器誤差為主。
  16. In addition, a calculating method of parametrically designing hydraulic motor with non - circular planetary gear is proposed aiming at maximal unit displacement and the minimal pulsation ratio by means of visual c + + 6. 0 software

    此外,探討了以單位體積排為設目標,脈動率小為約束條件對非圓行星齒輪液壓馬達的參數化設方法。
  17. Then, under the condition of satisfied the output volume request, a designing method of parametrically designing hydraulic motor with multi cylindrical gear is proposed aiming at minimal cubage with by means of visual c + + 6. 0 software, a calculating method of parametrically designing hydraulic motor with non - circular planetary gear is proposed aiming at maximal unit displacement and the minimal pulsation ratio by means of visual c + + 6. 0 software, and some designing method examples are provided for verifying the accuracy and possibility of those design methods

    再次,在滿足排要求條件下,以體積小為設目標,利用visualc + + 6 . 0軟體對圓柱多齒輪式液壓馬達進行了參數化設軟體的開發;另外,以單位體積排為設目標,以脈動率小為約束條件,利用visualc + + 6 . 0軟體對具有圓柱行星齒輪的非圓行星齒輪液壓馬達的參數化設軟體進行了開發。
  18. It has been a long time on blood velocity measurement [ 9 ] of this type. there are many methods to obtain the windows. but the intensity signal obtained from the windows is n ' t accuray of some methods or the real time property is not very good of others

    用相關演算法時,血液速是血管上兩窗口間的距離除以血液過兩窗口所用時間,時間用兩窗口血液灰度信號相關算得到,微循環血液速測的研究已經有很長的時間[ 9 ] ,其中血管窗口的選取現在有多種方法,但現有的方法要麼窗口取得不準確[ 9 ] ,要麼實時性較差。
  19. Peak flow meter

    呼氣
  20. According to the supply system composed by parallel connection water pump, many kinds of operation proposals in a single pump were put forward to provide the greatest possible flow on both sides of the demarcation point in the scope of the flux changes ; identified the system of pumps, electromotor, speed governor imitate method of characteristics curve of the power device and its rotating speed, efficiency, energy consumption calculation under different condition ; the analytical methods used for the operational plan for comprehensive evaluation of the economic and safety and optimal results

    摘要針對由並聯水泵組成的供水系統,提出了在以單泵可能提供為分界點的兩側變化范圍內具有多種運行方案;確定了在不同工況下,該系統中水泵、電機、調速器特性曲線的擬合方法及其各動力裝置中轉速、效率、能耗的算式;採用解析的方法對各種運行方案進行了經濟性和安全性綜合評價,並給出優結果。
分享友人