最終沉陷 的英文怎麼說

中文拼音 [zuìzhōngchénxiàn]
最終沉陷 英文
final subsidence
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ名詞1 (最後; 末了) end; ending; finish 2 (指人死) death; end 3 (姓氏) a surname Ⅱ形容詞(...
  • : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
  • : Ⅰ名詞1 (陷阱) pitfall; trap2 (缺點) defect; deficiency Ⅱ動詞1 (掉進) get stuck or bogged do...
  • 最終 : final; ultimate最終裁定 absolute decree; 最終裁決 final ruling; 最終產品 [工業] final products; e...
  • 沉陷 : 1. (下陷) sink; cave in 2. (沉降) sinkage; downpunching; depression; subsidence; [建築] settlement
  1. The investigation in the field was combined with research indoors. by classifying tectonic sequence, confirming corresponding prototype basin, analyzing paleo - tectonic stress fields in different periods, plotting correlative tectonic map based on 297 explore wells, and analyzing the traits of the remaining depressions producing hydrocarbon and their migration rules in the ordovician, the author studied the basement of the basin ; the fault system of the basin ; the tectonic - sedimentary evolution of the basin and its circumference areas ; the prototype basin and corresponding dynamics background ; the paleo - tectonic patte rn and its evolution in the layers of producing gas in different periods of ordovician ; the superposition relationship among the different period basins formed by different stress fields ; the reformation of the basin and the formation, redistribution and final emplacement of the gas pools

    採用野外地質調查與室內綜合研究相結合,通過構造層序的劃分及其相應盆地原型的確定、不同期次古構造應力場的分析、以297口探井數據為基礎的相關構造圖件的編制、奧陶系殘餘生烴坳及其遷移規律研究等的綜合分析,開展了盆地基底以及盆地斷裂系統、盆地及鄰區構造與積演化、盆地原型及其形成的動力學背景、奧陶系產氣層不同時期的古構造格局及其演化、不同期次構造應力場形成的不同世代盆地之間的疊置關系以及盆地改造與天然氣藏的形成、重新分配和就位諸方面的研究。
  2. As soon as the tunnel boring machine advances 1m forward, 6 pieces of pre - cast concrete segment are fabricated and forming a ring with internal diameter of 5. 6m to support soil outside, while simultaneous back - filling and 32 - hole chemical grouting injector equipment installed with tunnel boring machine consolidating soil instantaneously to enhance the soil strength. the tunnel boring machine is also equipped with guided top gyroscope and true circularity retaining device for construction accuracy

    其中值得一提者,板橋土城線所採用之潛盾機系新型之土壓平衡式機種,具同步背填灌漿之功能,對地表之控製成效優良,目前已貫通並通過民房及商業區下方之下行隧道其初期均控制在5mm之內,二次最終沉陷平均總量大亦僅18mm ,遠優于初始設計的警戒值30mm 。
分享友人