校正場 的英文怎麼說

中文拼音 [jiàozhēngchǎng]
校正場 英文
alignment field
  • : 校名詞1. (學校) school 2. (校官) field officer3. (姓氏) a surname
  • : 正名詞(正月) the first month of the lunar year; the first moon
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • 校正 : check; correction; adjust; revise; proofread and correct; rectify; calibrate; make true; master c...
  1. Moreover, aiming at the location of inclined license plate, we have proposed the algorithm based on gray changing characteristic and orientation field. in this section, we discussed in detail the application of mathematical morphology operator in rough locating objective region and introduced the theory and realization method of orientation field. then we used it to detect inclined angel of objective region, finally we can precisely locate and emendate the inclined license plate based on detection result, and so we provided the favorable foundation for segmenting character

    此外針對傾斜車牌區域的定位分割問題,提出了基於灰度變化特性和方向計算的定位演算法,其中詳細討論了數學形態學運算元在目標區域粗定位中的應用,重點介紹了方向計算理論和實現方法,並將其應用於目標區域傾斜角度的檢測,根據檢測得到的結果進行了傾斜車牌區域的準確定位和,為后續的字元分割打下良好的基礎。
  2. Paragraph of time, the physical - training teacher educating a branch to organize implement new class bid to middle and primary school reforming condition making an investigation, indicate on inquiry in the front, scale is small since a little school running a school, a little rural area elementary school, does not move space especially, be not enough to pay attention to waiting a minute or to physical training, do not have very good according to that new class switches over to demand to open enough physical education, since entering the higher school the system restraint, a little school defies student sports activities and good health, physical education birthplace having some of higher class with the method of work " resorting to fraudulence ", go ahead culture class within outside row physical education, at present major middle and primary school stadium field layout, equipment and material facilities are obsolete, short - supplied, foundation has no way to ensure that regular sports of school is flexible carrying out, is difficult to say material request adapting to new class more

    前段時間,教育部門組織體育教師對中小學實施新課標改革情況進行調查,調查表明,一些學由於辦學規模小,特別是一些農村小學,沒有運動地,或者對體育鍛煉不夠重視等等,沒有很好地按照新課改要求開足體育課,由於升學制度的制約,一些學無視學生體育活動和身體健康,有些高年級的體育課貫用「偷梁換柱」的做法,外排體育課,內上文化課,目前多數中小學體育地布局、器材設施陳舊、緊缺,根本無法保證學常的體育活動的開展,更難以說適應新課材的要求。
  3. In the tsushima strait, the annual mean flux was 2. 3sv and its monthly variation just was only 0. 4sv. the thermockne structure and its variation affected the circulation system in the ecs. the weekly and monthly mean sea surface temperatures ( sst ) in the ecs were obtained by analysis and calibration of sst data from satellites during 1990 - 1999

    通過獲取、分析和1990 - 1999年間逐周的衛星遙感海表溫度資料,並通過最優插值技術獲得東中國海18x18km周平均和月平均海面溫度,論文還系統分析了東中國海月平均海表溫度的分佈特徵。
  4. The software has realized that pc computer manage and watch and control and configures and proof the instrument based on can fieldbus using the can communication module, and realized data processing and can communication through can data processing instrument, and realized output control and can communication through can output instrument

    在軟體上實現了pc機通過can通信卡對can現總線儀表實現遠程管理、遠程監控、遠程組態、遠程等功能、 can數據採集儀表實現數據採集及can通信等功能、 can輸出控制儀表實現輸出控制及can通信等功能。
  5. Colour field corrector

  6. Electroacoustics - random - incidence and diffuse - field calibration of sound level meters

    電聲學.聲級計的無規定射聲及擴散聲
  7. Electroacoustics - random - incidence and diffuse - field calibration of sound level meters iec 61183 : 1994 ; german version en 61183 : 1994

    電聲學.聲級計無規入射聲及擴散聲
  8. Using the system designed in this thesis work, flow field calibration of the wind tunnel is accomplished, which covers dynamic pressure drop coefficient, dynamic pressure time stability, axial static pressure gradient, boundary layer, and degree of turbulence, etc. boundary layer measuring principle and method are especially described in detail, the relationship between boundary layer thickness, wind speed setting, and the depth of the experimental section is summarized, and finally the calibration data for th e model center zone under specific wind speed are given

    然後利用本文設計的系統完成了落差系數、動壓時間穩定姓、軸向靜壓梯度、邊界層及湍流度等內容的流測。特別對邊界層測量的原理及方法做了較詳盡的敘述,總結出邊界層厚度與設定風速、實驗段深度的關系,然後給出模型中心區一定風速下數值。
  9. According to these accomplishments, several techniques are expounded emphatically in this paper, including 3d refraction statics, coherent noise suppression by prestack wave field separating ( prestack fx noise attenuation ), 3d prestack multiple domain random noise attenuation, multiples attenuation, nmo of unsymmetrical hyperbola, dynamic replacement of wave equation, surface - inconsistent residual static, super bin stacking, poststack depth migration and prestack depth migration. all the techniques have been applied in seismic processing of 2d, 3d and wide - line profiling and obtained good results

    本文根據項目組研究成果,重點閘述了三維折射波靜技術,疊前波分離相干噪音壓制方法(疊前fx去噪) ,疊前三維多域隨機噪音衰減技術,多次波衰減技術,非對稱雙曲線動技術,波動方程動態替換技術,非地表一致性的剩餘時差靜技術,超面元迭加處理技術,疊后深度偏移處理,疊前深度偏移處理等。
  10. The experimental results show that the contacting force error between real phase track and ideal phase track can be reduced by human - simulated intelligent parameter - adjusting level control of force sensing in remote welding, which makes the operator possess a better force telepresence, enhance the ability of controlling complex welding processes, and improve the remote welding quality

    實驗表明,通過遙控焊接仿人智能力覺參數級控制,能減小焊接力覺實際相軌跡與理想相軌跡誤差,使焊接操作者產生較好的力覺臨感效果,增強對遙控焊接復雜任務的操作能力,提高遙控焊接質量。
  11. The inversion results of the theory model and actual data show that the method can reconstruct near - surface velocity field of complex structure stably, quickly and accurately, thus, can calculate the statics and ensure structural imaging in complex area

    理論模型和實際資料的反演結果表明,該方法能穩定、快速、準確地重建復雜地區的近地表速度,建立準確的近地表速度,從而可計算準確的靜量,保證復雜地區的構造成像。
  12. Road construction and maintenance equipment. on - site calibration and verification of the settings of the continuous dosing apparatus of material production plants. part 5 : dry bulk weighing dosing machine. substance weighing test

    道路建設及維護設備.材料生產廠連續配製設備的現及檢驗.第5部分:干重計量機.材料重量試驗
  13. In order to accelerate the district metering work, in 2005 a contract operation will be carried out, including matching the site pipelines and valves with the plans for calibration, checking leak distribution by leakage vibration recorder, and zone division and suspension confirmation. twd divided specific areas into blocks for testing. presently, twd has already prepared four blocks for testing and 30 more will be ready by the end of the year

    為加速推動94年小區計量工作,於今年下半年將其前置作業包括現管線及閥栓與圖資比對新式漏水振動記錄器調查漏水分佈區塊劃分及斷水確認等委外辦理,目前已劃分完成4個計量區,預計至年底將完成30個。
  14. At secondly, for depressing the noise in ir images, we make a deep research in median filter and it ' s algorithm architecture, then we present a improved method based on the control bit look ahead structure and implement it in fpga. at last, we resolved the data communication problem in the multiprocessor ir image processing system and and complete the system debug

    然後,針對後圖像中噪聲干擾的問題,深入研究了中值濾波的特性和演算法結構,提出了具有超前控制位的max - min中值濾波器的改進結構,在現可編程門陣列fpga上設計實現了該中值濾波器,並進行了驗證。
  15. This paper presents a method of improving on frame & horizontal synchronization in laser phototypesetter, by using singal - chip computer system to detect real - time frequency deviation and adjust film transmission speed

    摘要提出了一種在激光照排機電控系統中,利用單晶片微機對轉鏡掃描光柵頻率信號的暫態波動量進行檢測、提取,並以此實時系統輸片速度,實現掃描對行掃描的跟蹤、補償,從而提高行、掃描同步精度的方案。
  16. In this paper, a " step - by - step " recursive 3 - d frequency - space wed scheme is presented to deal with real data

    本文採用三維頻率空間域有限差分波延拓運算元以「逐步累加」的方式實現了三維波動方程基準面,並對實際數據進行了處理。
  17. The thesis is aimed at presenting a procedure to establish a baseline finite element model of the qingzhou cable - stayed bridge over the ming river, fuzhou, china that was newly constructed. its main span length of 605m is the longest in the world among the completed composite - deck cable - stayed bridge. the proposed procedure includes several tasks : initial finite element modeling base on the design drawings, field loading tests and ambient vibration tests, and finite element model calibration with the test results

    本文以主跨605m的結合梁斜拉橋? ?青洲閩江大橋為背景,首先根據設計圖紙建立該橋完整的初始空間有限元模型,然後根據通車前現靜力試驗和環境振動試驗結果對初始有限元模型進行,通過參數的調整使模型靜、動力計算結果與實測值吻合。
  18. Abstract : in the article, some special installing methods of steel - pipe concrete column and steel structure of shenzhen saiger plaza, including installing sequence, measurement, correction, and welding, are introduced

    文摘:介紹深圳賽格廣鋼管混凝土柱?鋼結構在結構安裝方面的特殊做法,包括安裝順序、測量、和焊接等。
  19. Commissioner of twd inspects a site pipeline and valve to match with plans for calibration

    處長視察現管線及閥栓與圖資比對
  20. Saturation vapour pressure of internal combustion engine under actual operation conditions is expressed as the multinomial by using least square method, which facilitates the calculation of rectifying coefficient of engine output and fuel consumption as well as the fabrication of computer programme for such calculations

    摘要介紹了用最小二乘法擬合方法,將內燃機現環境狀況下飽和蒸汽壓表示為多項式形式,為計算功率和燃油消耗率系數,並為此而編制計算機程序提供方便。
分享友人