核試驗工廠 的英文怎麼說
中文拼音 [héshìyàngōngchǎng]
核試驗工廠
英文
nuclear test plant-
Di - on electrics service and products cover the power electric field including power generation transmission distribution, power equipment manufacturing, subway, utilites, ac dc metrology field as well, more than 500 units of electric power utilities and stations such as beijing power supply bureau, guangzhou power supply bureau, baosteel, three gorges power station and more manufacturers like siemens, abb, alstom, bicc, pirelii, toshiba and more and 30 units of metrology institutes in china like nim, tsinghua university and more are our user. di - on electric is sole and exclusive distributor for numerous famous companies like transinor doble norway, measurements international canada, ndb canada, schuetz germany, aan germany, dr. strauss germany and etc, taking care of their business and service in p. r. china including hongkong
絕大多數員工擁有本科和研究生以上學歷,在電力系統和計量系統工作多年,從事電力檢測帶電監測和計量測試儀器的技術服務和市場銷售工作長達10年以上,為約500多家電力工業系統的發供電部門如北京供電局,廣州電力局,深圳供電局,三峽電廠,廣州抽水蓄能電廠,田灣核電站等等,科研調試部門如廣東省電力試驗研究所,湖北省電力試驗研究所等等與設備生產廠如siemens , abb , alstom , toshiba等等提供了國際最先進可靠的測試技術和儀器設備為約30多家國內二級以上相關計量科研院所,包括國家計量院,清華大學,中國運載火箭研究院,空間技術研究院,航天二院,成飛,西飛和各省市計量院,電力試驗研究院所等提供了大量最先進可靠的計量檢測儀器。Abstract : this paper apply asme & quot; feed water pump npsh analysis during load rejection & quot; theory to check bfp npsh of zhuhai power plant 700mw units in the condition of vwo and also confirm the calculating result by load rejection test
文摘:利用asme的「甩負荷時給水泵汽蝕余量的分析」理論,校核了珠海電廠容量700mw機組在最惡劣工況即閥全開跳機工況時的給水泵汽蝕余量,並在甩負荷時,進行了試驗驗證。Besides the works mentioned above the tests of many kinds of sea dikes in zhejiang province have also been done according to the test results an optinal sea dike structure has been proposed
秦山核電三期工程是國家「九五」重點項目,近年來進行過廠坪標高確定、圍堤和護岸選型及消浪效果試驗研究,成果已通過專家評審鑒定。Test investigation on sgtr of single tube break and three - tube break is carried out on hpitf of ciae to deeply understand the thermal - hydraulic behavior during pressurized - water - reactor ( pwr ) sgtr and to provide an integral data base for code assessment and development. the facility, a full height and 1 / 1000 - scale ( by volume ) of qinshan nuclear power plant, incorporates two identical loops with active pumps and steam generators ( sg ). the initial steady state of the test basically simulated that of the reference plant operation
為了深入了解核電廠蒸汽發生器傳熱管破裂事故發生后的熱工水力現象,以及對壓水堆( pwr )核電廠系統分析程序進行分析和評價,在高壓綜合試驗裝置上開展了蒸汽發生器傳熱管破裂試驗研究高壓綜合試驗裝置以秦山核電廠主迴路系統為模擬對象,該裝置為雙環迴路系統,容積比為1 : 1000 ,高度比為1 : 1 。Beijing ( ap ) - - north korea insisted monday it be treated as a full - fledged nuclear power as six - nation arms talks convened for the first time since its atomic test, but the united states said time was running out for pyongyang to dismantle its nuclear arsenal and threatened more sanctions
Ap北京電:自北韓進行核試驗后,周一它在出席六國會談中第一次提出堅持要求作為核成熟國看待,但是美國表示平壤方面已經錯過了將他們國家核工廠拆除的時間,同時表示會嚴厲的實施制裁。The break was assumed to be a single tube double - ended and three - tube double - ended shear break. the diameter of the break orifice is 0. 876mm and 1. 518mm respectively. the characteristic responses of main thermal - hydraulic parameters, such as primary pressure, secondary pressure, break flow rate, pressurizer level, secondary side level of steam generator and so on, were presented in this thesis
試驗再現了核電廠蒸汽發生器單根傳熱管雙端斷裂事故和三根傳熱管雙端斷裂事故發生后的熱工水力現象,給出了事故過程中一次系統壓力、二次系統壓力、破口流量、蒸汽發生器二次側水位、穩壓器水位、元件表面溫度等主要參數的瞬態響應。分享友人