梁項面 的英文怎麼說

中文拼音 [liángxiàngmiàn]
梁項面 英文
toof beam
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  1. Therefore how to simulate exactly an arcuated built - up system bridge, carry calculation and design of it and obtain behaviors in accord with facts, is a urgent task in front of bridge workers

    因此如何正確模擬拱式組合體系橋,進行拱式組合體系橋的設計和計算,獲得符合實際的受力性能,一直是擺在橋工作者前的一迫切任務。
  2. Abstract : the paper probed the analysis on the adding mode of perpendicular load in multistorey building structures, the bending moment of frame side beams and the top, the bending moment of secondary beams, the difference between the tie - beam, plane - frame analysis and the space analysis on the path of conduct force, ect. it can be used as a reference when probing these problems

    文摘:討論了在多高層建築結構分析中垂直荷載加載模式的選擇,框架邊和次端部的彎矩計算,連問題和平框架分析與空間分析在傳力路徑上的差別以及單片剪力墻平外彎矩等問題,可供同類結構內力分析時參考
  3. Based upon virtual displacement method and the updated - lagrangian approach, stiffness matrices for two - dimensional elastic - plastic beam model in large displacement were proposed, in the derivation of which transverse stress was included because it was believed that part of the 2nd order effects of various stresses, which are in equilibrium with each other and with the external loads, will counteract each other and neglecting either part would possibly lead to incorrect results

    利用虛位移原理和更新的拉格朗日方法,導出了大位移彈塑性單元剛度矩陣的顯式表達式,在剛度矩陣推導中引入了截內非線性剪應力和橫向應力的影響,剛度矩陣通過了剛體檢驗。之所以要引入橫向應力的影響,是因為本文認為,保持平衡所需的所有應力,它們各自的二階效應會相互抵消,因此忽略其中的任何一都可能導致不正確的結果。
  4. Consequently, on the basis of non - winkler foundation model, a finite - element method that utilizes foundation flexibility matrix into iterative calculation is proposed in this paper originated from the item " the optimal design theory and research of pile capping beam " sponsored by natural science fund of hunan province, which the continuity of soil mass can be accounted for under various boundary conditions, different loadings and irregular beam characters

    本文結合湖南省自然科學基金目「樁基承臺優化設計理論與方法研究」 ,針對非文克爾地基(半空間、線性變形層或單向壓縮層地基模型等)上的樁基承臺,提出一種利用地基柔度矩陣來進行迭代的有限單元法,可充分考慮下土體的連續性,並對基礎與土體脫開、承臺變化、體邊界條件復雜、上部荷載類型變化以及下基樁承載力差異等情況進行分析計算。
  5. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存工程、孔道壓漿工程、體封端工程、橋防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移的施工方法;壓漿、封端、橋防水層和保護層施工的一些規定和注意事等都是對箱製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  6. There are many materials and members to be hoisted during construction of the suspension bridge, unfortunately, the out - spread overhead curved cable makes it impossible for hoisting the stiffening girder with normal cable - supported lift. in order to ensure the construction proceeded smoothly, a multifunctional overhead cableway system is developed, thus accommodating all the hoisting tasks for the superstructure ( stiffening girder )

    懸索橋施工中需要吊裝的材料和構件很多,豐都長江大橋懸索橋主纜採用空間外張式,使加勁的吊裝不能採用一般的纜載吊機形式,為使施工的順利進行,本橋施工中開發了多功能高架索道施工方案,以一副索道完成了多種工作,全解決了上部結構(包括加勁)的多吊裝作業。
  7. In this paper, to counter a flexible beam undergoing large overall motion impacting a fixed slope surface under the effects of grativity, the normal contact model is established based on the hertz theory and non - linear damping term, the tangential contact model is developed by adopting linear tangential contact stiffness to consider the effects of friction force during impact process, and the consistent linear dynamic model including impact is derived by using mode assumption method and lagrangin equation

    針對在重力場下作大范圍回轉運動的柔性與一固定斜發生斜碰撞的情況,根據hertz接觸理論和非線性阻尼建立法向碰撞接觸模型。引入線性切線接觸剛度建立切向碰撞接觸模型,以考慮接觸過程中由於切向相對速度的換向作用引起的摩擦力的變化。利用假設模態法和lagrangian方程建立系統含碰撞過程的一致線性化的動力學模型。
  8. For example, frp reinforced concrete is used to support or surround magnetic resonance imaging ( mri ) medical equipment, and frp is also used for the constructions of some seawalls, industrial roof decks, base pads for electrical and reactor equipment, anchor in rock and ground engineering and concrete floor slabs in aggressive chemical environments in order to promote the wide usage of frp and frp reinforced concrete structures, financed cooperatively by nationa l natural science foundation ( item : the research on mechanical performance of frp reinforced concrete beam reinforced ; number : 59978046 ) and henan illustrious youth science foundation, connected with the analysis methods of modern steel reinforced concrete structure, the thesis further studies the flexural performance of frp reinforced concrete beam through the systematic study on experimental data got from this kind of beams, systematically establishes the theoretical calculating system of the flexural performance of frp reinforced concrete beam in cooperation with the up - to - date analytical methods for reinforced concrete, which suits the properties of frp

    例如,纖維增強塑料筋應用於支撐和圍繞磁共振成像醫療設備的混凝土中及海堤、工業頂棚、電設備、反應設備的基座、巖土工程中的錨桿、侵蝕性環境的混凝土結構等海洋工程、橋工程、路工程、巖土工程、醫療及化工工程的建設。為了推動纖維增強塑料筋及其混凝土結構在工程中的廣泛應用,本文在國家自然科學基金(目名稱:纖維增強塑料筋混凝土力學性能的研究;編號: 59978046 )和河南省傑出青年基金的資助下,通過對纖維增強塑料筋混凝土正截受彎性能試驗數據的系統分析,結合現代鋼筋混凝土結構學的分析方法,對纖維增強塑料筋混凝土正截受彎性能進行了深入的研究,較系統的建立了適合於纖維增強塑料筋特點的纖維增強塑料筋混凝土正截受彎性能的理論計算體系。
  9. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州長江公路大橋斜拉橋施工過程各狀態和成橋恆載狀態下,斜拉索索力、主線形、主關鍵截應變、索塔塔頂水平偏位等關鍵目的施工控制結果均滿足設計期望值的要求,滿足橋施工范圍的要求,大橋主線形流暢,斜拉索、主和索塔三大體系的受力狀態合理,橋結構安全可靠,大橋的監測監控取得了圓滿成功,並為該橋營運階段的長期監測監控奠定了良好的基礎。
  10. In the theoretical research part of the project, liang zhi yong adopted the pseudo - spectral matrix method to simulate the friction reduction by microbubble on flat plates numerically ; and lin li ming used the model of ipsa ( inter - phase slip algorithm ) provided in phoenics to study this problem

    在微氣泡減阻基金目理論研究方志勇採用偽譜矩陣方法對平板微氣泡減阻進行了數值模擬;林黎明則主要是採用phoenics軟體提供的ipsa模型進行平板微氣泡減阻計算。
  11. In order to accelerate the development of preflex composite beam in railway bridges and to design and construct preflex composite beam bridges of railway in our country reasonably, this thesis is from the scientific project of railway department " experiment and application research of railway preflex composite beam " and summarizes the design information and practical projects on preflex composite beam. on the basis of above works, this thesis improves computation method in analysis of railway preflex composite beam on sectional stress, deflection of mid - span, crack width and shearing resistance and programs a software " preflex composite beam bridge structure analysis system - pfsas ", which is adapt to railway bridges in our country. moreover it makes a primary research in construction techniques and structure measures

    為了迅速促進預彎組合在我國鐵路橋中的發展,合理地進行我國鐵路預彎組合橋的設計和施工,本文結合鐵道部科技研究開發目「鐵路預彎組合的實驗與應用研究」 ,在總結以往對預彎組合力學性能研究成果及實際工程的基礎上,完善了鐵路預彎組合的截應力、跨中撓度、裂縫寬度和抗剪分析的計算方法;編制了適用於我國鐵路橋的「預彎組合橋結構分析系統? ? pfsas 」軟體;並對預彎組合的施工工藝及構造措施進行了初步探索。
  12. Dynamics modeling and frequency analysis for a planar flexible beam with coupling deformation terms

    計及變形耦合的平柔性動力學建模及頻率分析
  13. According to the results of the above experimental research, the reasonable matching of hfrp and construction technique of hydraulic pad - exerting - pressure were applied to a bending strengthening project of roofing frame beams

    在以上研究基礎上,將hfrp的合理匹配、水墊加接觸壓施工方法,用於一抗彎加固工程實踐。
  14. In a written reply to a question on the employment of temporary staff by the urban services department and the regional services department at the legislative council sitting held on 19 march this year, the secretary for the civil service stated that 108 temporary staff members had sustained injuries while at work over the past three years

    11 .耀忠議員問:本年三月十九日立法局會議席上,公務員事務司以書回答一關於市政總署及區域市政總署聘用臨時員工的質詢時,表示在過去3年內有108名臨時員工因工受傷。
  15. The motion, to be proposed by hon leung kwok - hung, states : " that this council regrets that the hksar government has twice requested the standing committee of the national people s congress " npcsc " to interpret the provisions of the basic law in 1999 and 2005 respectively and requests the npcsc to withdraw its decisions in the last two interpretation exercises, and demands the sar government to apologize to the people of hong kong for having done so and undertake not to further request the npcsc to interpret the basic law ; furthermore, this council also urges the npcsc to rescind its decision made on 26 april 2004 to rule out the election of the chief executive and all members of the legislative council by universal suffrage in 2007 and 2008 respectively in hong kong which throttles the rights of the people of hong kong to the full implementation of election by universal suffrage in 2007 and 2008, as well as demands the chief secretary for administration, hon donald tsang yam - kuen, to rescind the four constitutional development reports, so as to give a true account of the facts.

    議員又會辯論一有關遺憾人大常委會釋法的議案。該議案將由國雄議員提出,內容為:本會對香港特區政府在1999年及2005年兩次要求全國人民代表大會常務委員會下稱「人大常委會」解釋基本法條文表示遺憾及要求人大常委會撤回上述兩次釋法的有關決定,並要求特區政府為此向市民道歉及承諾不會再向人大常委會提出釋法要求此外,本會亦促請人大常委會撤回於2004年4月26日否決香港2007年普選行政長官和2008年普選立法會全體議員的決定,該決定扼殺港人於2007年及2008年實行全普選的權利並要求政務司司長曾蔭權先生撤銷4份政制發展報告,以正視聽。
  16. Brain bridge program applies this knowledge to the business field of marketing and planning

    大腦橋目為商業領域的銷售和計劃提供了這方的知識。
  17. Seven chapters are included in this thesis. the first chapter is the introduction about the necessity of bridge detection and common defect of the bridge. the second chapter introduces the structural basic condition and defect details of the bridge. the third chapter describes the preparation for the detection work. including the overall investigation of the diseases and the condition at operation, the set - up of loading test and control measures and structural computation. the 4th chapter is on - the - site detection, which consists of static and dynamic tests and necessary data collecting for analysis and evaluation. the 5th chapter is the analysis of detention data. according to collected data of loading tests, the results of static and dynamic tests are analyzed. the 6th chapter evaluates the strengths, rigidity. stability and dynamic characteristics of the bridge, so that the conclusion can be reached. the 7th chapter is summarization

    第六章是檢測評定結論,全評定該橋的強度、剛度、穩定性和動力特性,從而給出檢測評定結論。第七章是總結,在對本目的工作內容和工作特點進行總結的基礎上,指出了舊橋檢測存在的問題以及今後發展的方向。同時,通過對本次檢測工作的研究,初步形成了一套特大跨徑舊鋼橋的檢測評定方法,即:全的病害和運營狀況調查、現實狀況計算分析、制定加載試驗方案和加載控制措施、加載試驗、綜合橋分析專家評定。
  18. The research on corrosion of pre - stressed concrete bridge is a very complex project, the research involve the theory of pre - stressed concrete engineering, electrochemical mechanism, structural durability analysis, theory of control and etc. due to this reason, the research on this field is rare, and most relevant research is mainly on the development of pre - stressed concrete engineering, structural electrochemical mechanism, the method of monitoring, corrosion protection of service structure and structural durability analysis separately

    預應力混凝土橋的腐蝕研究是一跨學科的課題,牽涉到預應力混凝土工程、電化學腐蝕、結構耐久性分析以及控制理論等多個方。由於課題的復雜性,目前針對性的研究較少,絕大部分的相關工作主要集中於預應力混凝土工程的研究發展、結構電化學腐蝕機理及檢測方法的研究、在役結構的防腐蝕研究、結構的耐久性研究等幾個獨立的方
  19. Then we also study the effect of string on the dynamical characteristic under the symmetric load and not under the symmetric load as the prestressing is the key making beam string structure the balanceatie system, having large rigidity and embodying the superiority of dynamical characteristic of this structure, this paper studies and conceives how to deteimine the number of the prestressing in each stage of construction and through comparing between the plan of onetime and repeated pulling construction choose the suitable pulling construction plan

    並且本文還研究了在對稱荷載和不對稱荷載兩種工況下,結構的受力性能隨豎向撐桿數目、結構垂跨比以及下弦索預應力等參數改變時的變化情況,總結出該結構受力方的特徵,為實際工程設計提供依據。鑒于預應力是使張弦結構形成自平衡體系、具備較大剛度和體現結構性能優勢的關鍵,本文研究和探討了結構施工各階段該預應力大小的確定方法,通過一次張拉與二次張拉方案各指標的比較,選擇適當的預應力張拉施工方案。
分享友人