梯級壩 的英文怎麼說

中文拼音 []
梯級壩 英文
step dams
  • : Ⅰ名詞1 (梯子; 樓梯) ladder; stairs; steps; staircase 2 (姓氏) a surname Ⅱ形容詞(形狀像樓梯的...
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. Along with the implementation of experiment of straight power supply to big consumer step by step, as the largest rundle hydropower station in our country, we must consider straight power supply to big consumer ( a new electric power marketing ) with the electric power of gezhouba - three gorges as an important composed part of electric power marketing, let it become to one of the important means of gaining the more benefits to our company

    直供電作為一種新的營銷模式,隨著大用戶直供電試點工作的逐步展開,作為我國最大的電站,必須把三峽?葛洲的電力直供作為電力營銷的有機組成部分,作為實現公司效益最大化的重要手段之一。論文在分析了三峽區域潛在的直供對象后,提出了三峽電力過網直供和專線直供的思路。
  2. Preliminary studies suggest that the mutual relations of the security, economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction, the concepts on the cascade exploitation of the river should be transferred from flood control to flood management, the design flood standards for construction at the initial, middle and later stages of high dam projects should be driven up gradually according to reservoir capacity

    初步研究認為,在施工洪水設計標準選擇時,應處理好安全、經濟和風險相互之間的關系,以達到三者有機的統一;在開發河流上應實施從施工洪水控制到施工洪水管理的觀念轉移;高大庫工程的初期、中期、後期三個時段的施工洪水設計標準應根據庫容等指標逐步抬高。
  3. Combining with advanced science and technology such as modem computer network technology, database management system and modem communication technology etc, the reservoir dispatching automatization system has developed from the indispensable application system such as water inspecting system, flood forecasting system, reservoir dispatching and water information querying system etc into an integrated functioning system used for the dispatching of water power stations. using the management information system, database management system, geographic infonnation system, optimization technology, statistics etc. this paper with the project background of the three gorges cascade dispatching of reservoirs, bring forward the plan of dispatching automation system of three gorges cascade reservoirs. this project have been adopted in the three gorges project

    本文應用信息管理系統、數據庫管理系統,地理信息系統、最優化技術、統計學等方面的理論和知識,以滿足三峽工程水庫調度的需要為前提,提出了三峽工程水庫調度自動化系統的方案結構,該方案已被三峽工程的建設所采納,同時,在水情遙測系統的通信組網方式上,本文提出的inmarsat - c與pstn聯合組網的通信方式,在我國水電站的水情測報系統中,首次在葛洲項目中成功地應用,並且該方式也將應用於三峽水庫調度自動化系統。
  4. Shui buya hydro - hinge is the upest cock step of three - step cascade hydroelectric power stations from upstream to down stream on the middle low reach of the main course of qingjiang river, which is going to be developped by hubei qingjiang hydroelectric development ltd after constructing ge he yan and gao ba zhou hydroelectric power stations

    水布埡水利樞紐是湖北清江水電開發有限責任公司繼隔河巖、高洲水電站之後,在清江中下游幹流上實施三開發的最上一龍頭水電站工程。
  5. According to the desire of no operator on duty operation mode and dispatching two hydropower plants and two dams by tgcdc, and focusing on how to connect the cscs of gehp to the cscs of tgcdc to meet the technical demand of cascade dispatching, advanced the frame and network configuration of sj - 600 lcu that is appropriate to the functional desire of no operator on duty operation mode, and fully compared with the import lcu on system structure, technology capability and configuration ; and advanced two reforming schemes of connecting the cscs of gehp to the cscs of tgcdc that meet the desire of tgcdc and are appropriate to the desire of no operator on duty operation mode

    根據無人值班和三峽調實行兩廠兩聯合調度的要求,圍繞著二江電廠計算機監控系統如何接入三峽調監控系統滿足調度的技術要求,提出了適應無人值班功能要求的sj - 600型現地控制單元( lcu )裝置的構成和網路結構,並就系統結構、技術性能和組態等方面同進口lcu進行了全面比較;提出了兩套滿足調要求、適應無人值班要求的二江電廠計算機監控系統接入三峽調監控系統的改造方案。
  6. Hongjiadu hydraulic power plant is the only leading water storage reservoir of wujiang cascade hydraulic stations, which is a full - time storage reservoir. 2 * landslide body is distributed at the right side of downstream, which is just located in the region of energy dissipation. erosion gully may cut the bottom of the landslide body. there are roads on the top of the landslide body during the construction period and operating period

    洪家渡水電站是烏江水電站中唯一具有多年調節性能的「龍頭」水庫, 2 #塌滑體分佈於址下游右岸,恰好位於泄洪消能防沖區內,沖坑將塌滑體下部切腳,而且施工期和運行期在其上都布置有公路,因此2 #塌滑體失穩將影響整個水電站的正常運行。
  7. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)水電站是黃河幹流上的一個電站,為了減少征地移民損失,經對炳靈水電站(塔坪址)尾水斷面在劉家峽水庫不同運行方式下的水位與流量關系進行分析研究,在總裝機和年發電量基本不變的情況下,充分利用劉家峽水庫汛限水位,將電站樞紐選址在其電站庫尾內。
分享友人