樞紐變電站 的英文怎麼說

中文拼音 [shūniǔbiàndiànzhàn]
樞紐變電站 英文
load-center substation
  • : 名詞1 (門上的轉軸)door hinge:流水不腐 戶樞不蠹。 running water is never stale and a door hinge ...
  • : 名詞1. (器物上可以抓住而提起來的部分) handle; knob 2. (紐扣) button 3. (樞紐) bond; tie4. (姓氏) a surname
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 樞紐 : pivot; hub; axis; key position
  • 電站 : power station電站船 generating ship
  1. They can be applied to electric power automatic control in many fields such as heat power plant, heat - electric generating plant, hydroelectric power plant, electric network, substation, pumping station, hydro - junction etc. and for electric power dispatching telecontrol system by telemetering and remote control, and field electric energy monitoring of the utilization and distribution equipment in numerous enterprises, can widely apply to electric power, water conservancy, metallurgy, petrochemical industry, chemical industry, railway, port, municipal administration, construction material, post and telecommunication, tobacco, papermaking, spaceflight base, civil aviation airport, hospital and school etc, many profession and field

    適用於火所泵水利等方面的力自動控制和進行遙控遙測的力調度遠動系統,以及眾多企事業單位用設備的現場量監控等。可廣泛應用於力水利冶金石化化工鐵路港口市政建材郵煙草造紙航天基地民航機場以及醫院學校等多種行業或領域。
  2. Tangyin substation is an important substation which has two transformer of 120mva, eight 220kv lines and three 110kv lines. tangqian line is a 110kv line specially for traction transformer substation. because traction load is high - power nonlinear and asymmetry. it will produce much harmonic and negatvie sequence current, which have done harm to compensation capacitors of tangyin substation. in recent years, the tang6c capacitor often interrupted and in 2001 july the tang7c capacitor ' s discharge pt exploded

    湯陰是豫北一座樞紐變電站,有2臺120mva的主, 8條220kv線路和3條110kv線路,其中的湯牽線是專為牽引的110kv線路。由於力機車屬于大功率的非線性負荷,且三相不對稱,在其運行過程中必然會產生較大的高次諧波和負序流。
  3. Quantity of generating electricity should be also calculated while the river inflow, quantity of water transfer and its duration curve are taken into account. as a company, it is necessary to take a series of measures to increase its benefits while water transfer leads to the decrease of hydro power inevitablly. the efficient methods can be taken into account as follows : i ) to improve the forecast accuracy, to decrease surplus water, and to increase seasonal electricity energy, ii ) to raise the peaking ability of dan jiang kou power station to obtain peaking benefits, iii ) to choose a suitable site to construct a pumped storage plant for peaking benefits

    在進行以上四方面內容深入探討的基礎上,論文針對丹江口水利運行任務、運行方式的重大化,提出漢江集團應採取以下因應措施以適應企業產業結構的調整,這些措施包括:準確計算發效益減少值;合理地核算水源的供水成本;以上述兩項計算成果為基礎,核算企業結構調整后總效益化量;提高預報水平,減少棄水量,爭取增發季節性能;研究新的調度方式,提高調峰能力,提高的容量效益;在適當的地點修建抽水蓄能,提高的調峰能力。
  4. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)水是黃河幹流上的一個梯級,為了減少征地移民損失,經對炳靈水(塔坪壩址)尾水斷面在劉家峽水庫不同運行方式下的水位與流量關系進行分析研究,在總裝機和年發量基本不的情況下,充分利用劉家峽水庫汛限水位,將選址在其庫尾內。
分享友人