模壓混凝土 的英文怎麼說

中文拼音 [húnníng]
模壓混凝土 英文
stamped concrete
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : 壓構詞成分。
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出的溫度場和徐變應力場型理論,編制了高碾壩的三維有限元擬計算程序,在程序中考慮了各種溫控措施的數值擬,包括:水管冷卻、冬季保溫、降低的澆築溫度、夏季表面噴水霧、施工汛期壩頂面過水等。
  2. Analysis of hydraulic system in slip - form concrete paver

    攤鋪機液系統分析
  3. Besides, this paper adopts the random finite element method, uses geometric and physical mechanical parameters that are relevant to lining weight of surrounding rock, coefficient of lateral pressure, height or buried depth of vertical loading, elastic resistance coefficients of surrounding rock, elastic modulus of support structure, unit weight of concrete, thickness of the structure as well as torsional strength and compression strength of concrete and etc., as random variables, applies the monte - carlo method to sampling by computer, preliminarily evaluates the reliability of bearing capacity and stability of molded concrete lining of the xuefeng mountain tunnel, and obtains the related displacement of the lining, mean value and variance of internal force, and computed the reliability index of lining structures

    此外,本文採用隨機有限元方法,將圍巖容重、側力系數、垂直荷載高度或埋深、圍巖的彈性抗力系數、支護結構的彈性量、容重、結構的厚度以及的抗扭與抗強度等與襯砌結構有關的幾何與物理力學參數作為隨機變量,應用蒙特卡洛理論進行計算機隨機取樣,對雪峰山隧道襯砌的承載力與穩定性的可靠度進行了初步評估,得出了襯砌的相關位移與內力的均值和方差,並計算出了相應的襯砌結構可靠指標。
  4. This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action

    考慮了乞今最為全面的初始條件和邊界條件,包括擬壩體的實際升程過程,考慮了新老接觸面上的初始溫度不連續,逐日的氣溫變化,的入倉溫度,水化熱溫升,邊界保溫,水庫蓄水過程,澆築間歇以及灑水養生等因素;應力場的計算考慮了的自重,靜水力,溫度應力,常態與碾不同的自生體積變形,的彈性量隨齡期的變化以及徐變的作用。
  5. Study on calculation model for temperature field of roller compacted concrete lifts

    澆築層溫度場計算型研究
  6. Comparative analysis of structural model destruction tests of two arch dams

    兩座碾拱壩結構型破壞試驗對比分析
  7. Mechanical properties of roller compacted concrete

    力學特性及本構型研究
  8. The scale and height of rolling - concrete are spread increasingly, such as the technique studied recently that the 300 meters high gravity dam and the 200 meters high arch dam, which requires more experience in the damming technique, construction crafts and mechanization

    目前,碾壩的規和高度正在日益擴大, 300m級的碾重力壩和200m級的碾拱壩的研究正方興未艾,對碾築壩技術、施工工藝和機械化程度的要求也更高。
  9. In order to simulate the construction process and the effect of concrete pouring temperature and outside temperature on temperature field and thermal stress field in the dam, temperature field and thermal stress field are calculated layer by layer. the calculation step during construction is 0. 25 day, and during operation the diffusion of hydration heat of concrete is over and elastic modulus is basically stable, changeable step is used

    為了研究施工進度、澆築溫度、外界溫度對壩體溫度場和應力場的影響,按碾施工方法每澆築一層(層厚0 . 3m ,澆築時間6小時)計算一次溫度場和應力場,這樣,施工期計算步長為0 . 25天,運行期因水化發熱已結束,且彈基本穩定,故採用變步長計算。
  10. Based on several actual cases, the temperature control measures for roller compacted concrete ( rcc ) gravity dam and arch dam such as structural jointing for construction ; lowering of concrete placing temperature ; water pipe cooling ; surface insulation ; inclined - layer placing etc., the measures to improve the material properties i. e. the application of micro - expanding concrete ; enhancement of material crack - resistance property and the requirement for the simulative analysis on both the temperature field and stress field as well as some problems concerned are summarized herein on the basis of the analysis on the material properties ; construction characteristics and the changing characteristics of the thermal stress of roller compacted concrete

    摘要從碾的材料特性、施工特點、溫度場溫度應力的變化特點入手,結合幾個工程總結了碾重力壩、拱壩的分縫方式,降低澆築溫度、水管冷卻、表面保溫、施斜層碾等溫控措施,採用微膨脹、提高材料抗裂性能等改善材料性能措施及碾溫度場、應力場擬分析的要求和應注意的問題。
  11. In this article, according to three - dimension finite element theory and heat conduction theory, the computation program of simulating thermal stress field of rcc arch dam during construction and service is researched and developed

    本文採用三維有限元法和熱傳導理論,研究開發了碾拱壩施工期和運行期溫度應力場全過程的擬計算程序。
  12. Based on the relocating mesh model, according to heat conduction theory, elastic creep theory and finite element theory, simulation program for roller compacted concrete overflow dam is worked out through 3 - d finite element method

    基於本文提出的計算型,根據熱傳導理論、彈性徐變理論及有限元理論,作者編制了碾溢流壩溫度場及溫度應力場的三維有限元擬計算程序。
  13. Plan element simulation of fracture seepage for analyzing seepage in rcc dams

    壩滲流場分析的縫面滲流平面單元擬法
  14. In this paper, applying the theory and method of system engineering and administer accountant, combining the huatan project, the optimization among the construction scheme matching machine and expenses were studied thoroughly. through the simulation and optimization in construction process, mixing and transport subsystems of huatan dam, and analyzing the influence factors of damming capability, establishing the correspond systems analysis software of dlp model

    本文應用系統工程、管理會計的理論和方法,並結合花灘碾大壩工程實踐,系統而深入地研究了築壩的施工方案、機械配套和費用優化,對花灘碾壩施工過程、拌和運輸子系統的擬和優化,分析了碾澆築能力的影響因素,建立了dlp型相應的系統分析軟體。
  15. Combining the fracture toughness test results of rcc specimens with the existed size effect formula for fracture toughness of common concrete, the suitable size effect formula fur fracture toughness of rcc was gotten on the comparative of results of the computation models

    將碾斷裂韌度試驗結果與已有的普通斷裂韌度尺寸效應公式結合,通過對幾種型的計算結果的分析比較,得到了碾所適用的斷裂韌度尺寸效應公式。
  16. With considering the construction process of rcc gravity dam and temperature load during construction period, crack constitution model of concrete material is applied to simulated analysis of the temperature stress from construction period to operating period

    摘要考慮碾壩的實際成層澆築過程和施工期的溫度作用,採用開裂本構型,利用三維瞬態有限元方法擬分析了大壩施工期至運行期的溫度應力及綜合應力。
  17. In the dissertation, the study on carbon fiber reinforced concrete ( cfrc ) and plain concrete has been reviewed. then mechano - electric effect of cfrc and plain concrete, its mechanisms, the interaction among mechano - electric effect, piezoresistivity and seebeck effect, the electrical circuit model of concrete based on mechano - electric effect, electromagnetic emission of concrete, the mathematical model of mechano - electric effect are investigated. also the converse effect of mechano - electric effect of cfrc and plain concrete, that is, electromechanical effect, and the interaction between electromechanical effect and electrothermal effect of cfrc are examined

    本文對碳纖維和素機敏性的國內外研究現狀進行了全面的評述,在大量實驗分析的基礎上,系統地研究了碳纖維和素的力電機敏性,研究了力電效應機理、力電效應與其它效應(阻效應、塞貝克效應等)的耦合關系、基於力電效應的電學型、電磁發射現象、力電效應的數學型等;論文同時對和素的電力效應、碳纖維電力效應與電熱效應的耦合關系等進行了探討;最後開展了基於力電效應的機敏結構應用研究。
  18. Based on the construction schedule and thermodynamics parameters of certain rcc arch dam, the temperature and stress fields during construction and service are simulated and computed, and also the computation results are compared with the practical observation data ; the comparison results show that the computation results are reasonable

    根據某工程碾拱壩施工過程和材料熱力學試驗參數,進行了施工期和運行期溫度場和應力場擬計算,計算成果與施工期觀測資料進行了對比分析,二者吻合較好。
  19. By applying " none homogeneous multi - laminate element ", hong - kou rcc gravity dam ' s simulation computing of temperature field and stress field at construction period and operation period for all courses and many factors. e. some kinds of methods are discussed in detail for temperature field back analysis, and artificial neural network method for back analysis of thermal parameters of concrete is suggested

    應用「非均質層合單元法」實現了洪口碾重力壩施工期、運行期全過程多因素的溫度場及徐變應力場的擬計算,進行多方案的比較分析,推薦出優選溫控防裂方案,取得了非常滿意的成果。
  20. In this paper the temperature field and thermal - creep - stress field in roller compacted concrete overflow dam during construction and operation are simulated and the distribution law of them are systematically studied by an example

    本文通過一典型算例對碾溢流壩施工期和運行期溫度場、徐變應力場進行了全過程擬分析,較為系統的研究了碾溢流壩施工期和運行期溫度場、溫度徐變應力場的分佈規律。
分享友人