橋梁施工 的英文怎麼說
中文拼音 [qiáoliángshīgōng]
橋梁施工
英文
pdf 454- 橋 : 名詞1. (橋梁) bridge 2. (姓氏) a surname
- 梁 : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 橋梁 : bridge; approach
- 施工 : be in the process of construction; be under construction; build; construction
-
The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection
本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。The basket symmetrical cantilever construction, which is often used, is one way of large - span bridge construction. with the length of cantilever longer, the risk is increased as well
掛籃對稱懸臂施工是大跨度橋梁施工中常用的一種方法,隨著懸臂長度的加長,風險也隨之加大。Assembly type bridge girder erecting equipment used at electrified railway section
拼裝式架橋機架設斜交橋梁施工技術Manufacture and installation technology of steel girder beam of passenger plateform bridge over busy railway line
泵送混凝土在高墩橋梁施工中的應用This paper introduces the development and present situation of concrete - filled steel tube arch bridge in the world ; generally analysis the mechanism, construction technology, construction equipment of the job practice ; advance the entire scheme of the long - span concrete - filled steel tube arch rib construction ; at last give the analysis the concrete scheme of the concrete - filled arch rib construction. this paper declares the reference value of the study through the above
本文介紹了國內外大跨度鋼管混凝土拱橋主拱肋施工的發展和現狀;綜合分析了拱橋施工的機理、技術和設備情況;提出了大跨度拱橋主拱肋施工的完整解決方案,最後通過具體橋梁施工方案的設計分析,說明了本項研究成果的現實參考價值。The analysis of shear lag effect of thin - walled box girder
混凝土橋梁施工溫度與裂縫產生原因分析With the advancement of calculating theory and design technology, as well as the wide application of computer in the engineering design area, the bridge structure is developing towards large span, thin section, and prestress. the bridge construction scheme is also made great progress. with the research on construction project, the construction of the bridges over the river or the gorge is becoming more and more simple, efficient and economical
隨著結構計算理論和設計技術的進步,以及計算機在工程設計領域的廣泛應用,橋梁結構向大跨度、薄截面、預應力方向發展,橋梁的施工方案也取得了很大的進展,通過施工方案的研究,使位於大江大河上及深山峽谷中的橋梁施工作業更加簡單高效、經濟合理。The new method of the construction with guyed travelers has been applied in bridge construction in recent years
摘要掛籃施工是近幾年才應用於橋梁施工工程的一種新方法。The writer has been engaged in bridge design and construction for some years and doing attempting studies in mechanical characters of long span curved box - girder bridges in construction phase
本人從事橋梁施工工作多年,在實際工作中逐漸摸索,對大跨度曲線箱梁橋施工階段的力學特徵進行了一些嘗試性的研究並得出了一些用以指導工程實踐的結論。Bridge construction survey
橋梁施工測量New construction technique for the outside sea bridge
外海橋梁施工新技術Greatly cross bridge construction monitor stress error analysis
大跨橋梁施工監測應力誤差分析Prestressing force post tensioning type application in bridge construction
預應力后張法在橋梁施工中的應用It is helpful to the construct ion of the bridges with the same type
其成果對同類型橋梁施工具有參考價值。In the concrete bridge construction the crack produces reason brief analysis
混凝土橋梁施工中裂縫產生原因淺析Analysis and computation method of structure for the construction control of prestressed concrete bridge
預應力混凝土橋梁施工控制結構分析計算方法According to the characteristic of ann itself and the complexity of factors which influence the elevation, the paper analyses the influence aspects of ann. on the promise of bridge construction precision, the paper raise determining principle and method for neural network ' s import vector in bridge construction process
根據神經網路自身的特點,以及橋梁立模標高影響因素的復雜性,對神經網路影響因素進行分析,在滿足橋梁施工精度的前提下,提出了在實橋施工過程中神經網路輸入矢量的確定原則和方法。This paper taking zigui longtanghe bridge in hubei province as a project background, studies about the unified construction technology of tower and buckle frame in erection with cableway used in steel pipe - encased concrete arch bridge constructioa based on the analysis of the construction property of long span steel pipe - encased concrete arch bridge, this paper raises the general scheme and basic structure of unified construction, analyzes the mechanical behavior of unified structure of construction statue, mainly discusses the strength, stiflhess and stability of the unified structure
本文以湖北秭歸龍潭河大橋為工程背景,對大跨徑鋼管混凝土拱橋纜索吊裝塔架扣架一體化施工技術進行了研究。論文以大跨徑鋼管混凝土拱橋施工特點分析為基礎,提出了一體化施工的總體方案與基本結構構造,分析了施工狀態一體化結構的力學行為,主要探討了一體化結構的強度、剛度及穩定性,採用動態監控系統確保了一體化結構在橋梁施工過程中的安全可靠性,從而形成一套系統的纜索吊裝施工新技術,並在實橋工程進行了應用,效果良好。Their advantages and shortcomings were summarized, too. these methods are not fit to the bridge construction when the space is limited or narrow
本文分析了各種的橋梁施工技術,總結了其優點和不足,這些方法在施工空間狹小時,難以應用。That causes new problems of construction on making use of or abandon old basis structure. based on the characteristics of the bridge foundation, this paper in detail introduces the design of construction procedures, construction methods and technological process for large temporary structures in foundation construction and driven or pull out steel casing pipe etc, which are seldom meet in common bridge construction. about digging and con struction of foundation piles, dynamic detection method of pile foundation etc. are also introduced and analysized
由於設計的變更,前期已施工的基礎結構與修改後的結構有較大差異,給施工帶來舊基礎利用和廢棄處理等新問題,本文針對該橋的基礎特點,詳細介紹了基礎施工中大型臨時結構、打拔鋼護筒等一般橋梁施工中很少遇到的施工工序的設計、施工和工藝問題,對于基樁的開挖和施工、樁基的動態方法檢測等問題也作了詳細介紹和分析。分享友人