橫裂體 的英文怎麼說

中文拼音 [héngliè]
橫裂體 英文
strobila
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : 裂動詞[方言] (東西的兩部分向兩旁分開) open
  • : 體構詞成分。
  1. The fracture surface traverses matrix as well as fibers and interface.

    表面切過基、纖維和界面。
  2. In order to direct the water to the forebav of the pump station from the original canal, a channel long 135 m is designed. it crosses through the terrain top with a depth of more than 50 m. soil of the channel slopes is a strongly - weathered silty and sandy mudstone with many well - developed reticular cracks and takes the structural surfaces almost same as the channel slopes

    東深供水工程金湖泵站位於塘廈鎮東面,屬低山、殘丘地貌,地面高程22 60m ;泵站前池進水渠切山脊,連接原東深供水河,設計開挖1條長135m的進水渠,坡高50多米,邊坡土質為強風化的粉砂質泥巖,網狀隙發育,結構面基本與坡面重合;坡土質中含有較多的粘土礦物,具有遇水軟化的特性。
  3. Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc

    應用於工程的主要方法有反射波法折射波法波速測井面波法及波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖構造褶皺斷層破碎帶隙帶對于回填工程路基壩基,地震勘探可以檢測其回填處理效果對于隧道工程,可以探測隧道洞的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。
  4. Yingxian ancient wooden pagoda is a flat - form tall building, which was formed by the superposition of monolayer temples. the height of 67. 31 meters made it encountered two unprecedented puzzles : firstly, with the height increased whopping, wind resisting and aseismatic capability become the main question of the whole structure ; secondly, because of the weight increased unconventionally, members of the lower 1 ~ 3 floors hold overloading perpendicular to grain and they brought large vertical deformation

    相對於一般殿堂結構,高度和自重的成倍增加,使木塔遇到前所未有的兩項難題:其一是因自重增加,使承受上層柱軸向荷載的梁(普拍枋和梁? )紋局壓應力成倍地超過設計強度而產生嚴重的壓縮變形甚至劈,導致木塔整豎向變位。
  5. In this thesis, analysis of whole performance and interior mechanism of plain soil slope and soil nailing wall with flag finite difference program has been carried out. at the same time, the impacts on the internal force distribution of soil nailing and the deformation of soil nailing wall of many factors, including the connection between face shield and soil nailing, the friction decline between soil nailing and soil, the shear force & bending moment resistance of soil nailing, the cement crack in soil nailing, face shield, excavation, the obliquity of slope, and so on are studied in this thesis

    本文通過flac有限差分程序,分析了素土基坑和土釘墻的整性能和內在機理,研究了土釘和面層的連接變化、土釘表面性能的下降、土釘的向抗剪抗彎作用、土釘漿的開、面層的有無、基坑的開挖過程、基坑放坡角度等因素對土釘內力分佈和土釘墻變形的影響。
  6. 3. the two stages of primary creep and steady - state creep of 3d c / sic correspond to the gradual saturation of matrix crack and the opening of these cracks respectively. the transverse crack is the main contributor to the macroscopic creep strain of 3d c / sic, and its opening is controlled by the creep temperature

    ( 3 ) 3dc sic復合材料的減速蠕變階段和穩態蠕變階段分別對應著基紋趨于飽和和逐漸張開這兩個過程;向基紋是3dc sic復合材料宏觀蠕變應變的主要貢獻者,溫度是影響紋張開速度的一個重要因素。
  7. Advanced technical ceramics - test methods for determination of fracture toughness of monolithic ceramics - chevron notched beam method

    高級工業陶瓷.塊陶瓷斷韌性測定的試驗方法.人字切口梁法
  8. The experimental result indicate that the working characters of the test floor slab is typically two - way obviously, the floor slab that is reinforced two - way by setting transverse steels through the rectangular cores in the ribs of the precast slabs, has excellent bulking property, high bearing capacity, cracking resistance and so on

    試驗研究表明,試驗樓蓋在加載過程中呈現了明顯的雙向受力特徵; pk預應力疊合樓蓋通過在預制構件板肋預留長方形孔穿置向鋼筋實現雙向配筋具有良好的整性能,還具備承載力高和抗性能良好等特點。
  9. And it can be concluded that simulating cracks on cbcbb by finite element method ( fem ) is feasible and reasonable. finally, simplified experimental model was built and analyzed by ansys under day changing and year changing temperature field. the typical cracks on top floor ' s walls were achieved, so the simulation method is reliable

    最後建立了砌塊建築簡化的整有限元模型,並對其進行了日變化、年變化溫度場下的縫模擬分析,真實、可靠地模擬出了砌塊建築頂層及次頂層的縫情況,包括南、北縱墻窗角斜縫和東、西山墻與內縱墻結合處縫以及端開間內縱、墻斜縫等。
  10. The one - dimension model has the advantages of simplicity, convenience and feasibility, but it also has one serious shortcoming, i. e., the influence of material properties on the load - transfer ability of the interface was not taken into account. although the two - dimension interface model considered the transverse effects of the matrix and the effects of the material properties on the load transfer ability of the interface, its principle is very complicated, and is n ' t fit for dealing with the data of the sfc test

    Cox的一維界面載荷傳遞模型的主要特點是簡單、方便和實用,但是具有一個致命的缺點:沒有考慮材料性能參數對界面載荷傳遞能力的影響; nairn的二維界面載荷傳遞模型雖然考慮了基向效應、纖維基材料性能參數對界面載荷傳遞能力的影響,但是其原理非常復雜,不適合於單纖維復合材料斷實驗的數據處理。
  11. ( 3 ) we can detection the azimuth of crack growth by abnormal amplitude or the discrepancy of wave - speed. ( 4 ) we can guess whether crack contains fluids by the change of p - wave speed. second, using pore model, under press and temperature, we have studied the influences of pore density on the characteristic parameters of seismic wave

    第一、利用人工縫模型,研究了縫密度、方位和張開度的變化對地震波屬性參數的影響,根據實驗結果,總結出:可利用波分的不同程度來檢測縫密度的高低;可利用縱波的振幅、主頻、衰減(或品質因子q )和主振幅的變化來檢測縫張開度的變化;可利用速度的差異和振幅異常來檢測縫發育的方向;可利用縱波速度的變化來推測縫中是否含流
  12. ( 5 ) several group experimental result of solute transport in fractured medium was analysed in different direction. an experience formula of nacl solution was summarized, which changed in different position. the coefficient of advective - dispersive was deduced by means of back analysis based on the experimental results, which suited to solute transport in a single fracture of rock

    ( 5 )通過隙中溶質運移的多組實驗結果進行、縱向的比較分析,總結出了nacl溶液濃度沿程變化的經驗公式;結合實驗結果針對所推導出的數學模型擬合出適合單隙巖的溶質運移彌散系數。
  13. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分積較大,易產生溫度縫。
  14. Firstly, well logging responses of fractured reservoir have been worked out by using rock core to calibrate well logging data. secondly, with the help of the seismic coherence cube, 3d volume visualization, seismic multi - attribute parameter, the curves of geophysical characteristics restructed, seismic data inversion with well logging restrict, the well curves inversion and so on, much work has been done, such as the full 3d seismic data fine structure interpretation and the studies for predicting the fractured reservoir in buried hills. a technique has been invented to predicting the fractured reservoir of metamorphic rock in buried hills with the integration of the multi - attribute and the multi - parameters

    利用巖芯標定測井資料,研究了縫性儲層的測井響應,進而藉助于地震相干技術、三維可視化、地震多屬性參數、地球物理特徵曲線重構、測井約束地震反演和測井特徵曲線反演等多項技術開展了全三維地震構造精細解釋和潛山縫性儲層向預測研究,形成了多屬性、多參數綜合預測變質巖縫性儲層的方法。
分享友人