正裝法 的英文怎麼說

中文拼音 [zhēngzhuāng]
正裝法 英文
upright method of hull section co truction
  • : 正名詞(正月) the first month of the lunar year; the first moon
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  1. I went so far with it in my imagination, that i employ d my self several days to find out proper places to put my self in ambuscade, as i said, to watch for them ; and i went frequently to the place it self, which was now grown more familiar to me ; and especially while my mind was thus fill d with thoughts of revenge, and of a bloody putting twenty or thirty of them to the sword, as i may call it, the horror i had at the place, and at the signals of the barbarous wretches devouring one another, abated my malice

    可能最多也不過把火星濺到他們的臉上,使他們嚇一跳罷了,決不會使他們放棄這塊地方,永遠不敢再來。因此,我把這個計劃擱置一邊另想辦。后來,我又想到可以找一個適當的地方埋伏起來,把三支槍上雙倍的彈藥,等他們熱鬧地舉行那殘忍的儀式時,就向他們開火,一槍準能打死或打傷兩三個。
  2. Not to inherit by right of primogeniture, gavelkind or borough english, or possess in perpetuity an extensive demesne of a sufficient number of acres, roods and perches, statute land measure valuation 42, of grazing turbary surrounding a baronial hall with gatelodge and carriage drive nor, on the other hand, a terracehouse or semidetached villa, described as rus in urbe or qui si sana, but to purchase by private treaty in fee simple a thatched bungalowshaped 2 storey dwellinghouse of southerly aspect, surmounted by vane and lightning conductor, connected with the earth, with porch covered by parasitic plants ivy or virginia creeper, halldoor, olive green, with smart carriage finish and neat doorbrasses, stucco front with gilt tracery at eaves and gable, rising, if possible, upon a gentle eminence with agreeable prospect from balcony with stone pillar parapet over unoccupied and unoccupyable interjacent pastures and standing in 5 or 6 acres of its own ground, at such a distance from the nearest public thoroughfare as to render its houselights visible at night above and through a quickset hornbeam hedge of topiary cutting, situate at a given point not less than 1 statute mile from the periphery of the metropolis, within a time limit of not more than 5 minutes from tram or train line e. g.,

    他並不想根據長子繼承製男子平分繼承製或末子繼承製237 ,把那幢有著門房和馬車道的男爵宅邪及其周圍那一大片遼闊的英畝路得和平方桿238定土地面積單位,估價為四十二英鎊239的泥炭質牧場地,或者那座被描述為「都會中的田園240 」或「健康莊242 」的有陽臺的房子或一側與鄰屋相接的別墅,繼承下來並永久佔有。他只巴望根據私人合同購買一所繼承人身分不受限制的不動產:要坐北朝南的一座草屋頂有涼臺的雙層住宅,房頂上起風向標以及與地面相接的避雷針,門廊上要爬滿寄生植物常春藤或五葉地錦,橄欖綠色的門最後一道工序漆得漂漂亮亮,賽得過馬車。門上有著精巧的黃銅飾。
  3. Lady bathurst is redecorating her ballroom in the french style

    巴瑟斯特夫人在按照國風格重新修舞廳
  4. In the sunken ship he was trying to find had been carrying a precious cargo of gold bullion.

    在設尋找的沉船里載著貴重的金條。
  5. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散和分單元安兩種樹狀結構吊方案,樹狀結構吊機械及平面布置,樹狀結構胎架及節點的搭設,以及樹狀結構樹干、樹枝和節點的吊工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐標測量的方,包括測量標志點的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀結構可焊性、焊接方、焊接工藝、焊接應力及控制、焊接變形及矯、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。
  6. Using the least squares method to modulate the inclined cable forces both in forward analysis stage and backward analysis stage, the tensile inclined cable forces during construction will be get finally

    最後採用最小二乘和倒拆兩個步驟中得到的索力進行修,得到施工中的斜拉索的張拉索力。
  7. Combining with the performances of danshan bridge, discussing the methods on the construction controlling and calculation of cable - stayed bridge, this paper raises an efficient construction controlling system, and realizes collecting construction data of the real bridge and technical information. by analyzing on the difference of theoretical calculation and real construction state, the author determines to take self - adapting construction controlling method which uses kalman filter method to identify and adjust construction parameters. by getting rational construction state from forward iteration method, this paper, taking concrete creep effect in consideration, raises a rational scheme to pre - remain deformation and adjust cable force

    結合丹山橋的結構特點,通過對斜拉橋施工控制及結構計算方的探討,提出了有效的施工控制系統,實現了對實橋施工數據和技術信息的採集;通過分析理論計算與實際施工狀態的差異,確定了以卡爾曼濾波作為施工參數識別與調整的自適應施工控制方;通過迭代確定其合理施工狀態,並考慮混凝土的徐變效應,提出了合理的預留拱度和索力調整方案。
  8. Frances was wearing an outfit that could have come out of one of those magazines ? a party dress ofdeep - red velvet with a white lace collar and a black ribbon threaded through the lace

    蘭西斯穿的套可能就是從這些雜志中的某一本里模仿來的? ?深紅色天鵝絨宴會,領子上鑲有白色的花邊,花邊上還穿有黑色的緞帶。
  9. However, the disadvantage of laser welding is the so - called post - weld - shift ( pws ). the end result is a reduction in light coupling efficiency. the shrinkage force generated by the solidification process is so great that no known mechanical structure can counteract the shrinkage from shifting the joint ? at least at the micron level

    這種封技術最大的缺點是會使激光二極體的封產生焊後偏移( pws ) ,很少有一種機械的方可以校這種焊後偏移到亞微米級別,目前激光錘被證明是一種很有效的校,激光錘校作用過程就是利用金屬熔化凝固冷卻產生的內應力來恢復焊後偏移的過程。
  10. Through the calculating example results and the comparisons with other calculating theories, it is proved that the calculating formulas of the combined geometry curve theory is valid, practical and accurate. it can be used in the calculation of line shape at the preliminary design, and can meet the engineering need. ( 3 ) this thesis researches systemically on the calculating theory of the suspension bridge ’ s cable system, including calculating design line shape and internal force, erection line shape of cable and pre - displacement of saddle without loads, the fixed position for erecting cable and amendatory method of cable ’ s unstressed length

    通過算例驗證了混合線形理論公式的實用性和確性,並且與其它計算理論的結果比較,證明公式有足夠的精度,可用做初步設計中主纜線形的計算,能夠滿足工程的需要; ( 3 )對自錨式懸索橋主纜系統計算理論進行了系統研究,包括成橋線形和內力計算、空纜線形和內力計算、鞍座預偏量計算、索夾安位置計算和索鞍處主纜無應力長度修
  11. In conclusion, this paper focuses on the modeling technology of assembly in virtual manufacturing environme nts, analyzes the cause of assembly error and gives its revise arithmetic, and solves the problems of low display speed and real time by the entity modeling method

    論文重點研究了虛擬製造環境的配建模技術,分析了配誤差的產生及校,解決了採用直接實體造型顯示速度慢,實時性差的問題,具有較強的實用性。
  12. The optimization model of the cable tensile force is established, resolving the ideal finished state of considering syntheticly the requirement including the dead load, active load and presress of structure, meanwhile, providing a forward - calculating method for determining the rational construction state on the foundation of the optimization model. on the other hand how to determine and adjust the important parameter, the cable midst tensile forces and the main feam form setting levels in constructing cable - stayed bridge, has also been analyzed, besides, the corresponding calculation method is introduced and applied to the actual construction controlling of xian tao han jiang highway bridge well

    本文以仙桃漢江公路大橋為工程背景在斜拉橋設計計算方面進行了的研究,建立了斜拉橋索力優化模型,一方面解決了能綜合考慮結構恆載、活載及預應力等多方面因素的理想成橋狀態確定問題;另一方面在確定合理施工受力狀態問題上提出了一套以索力優化模型為基礎的計演算。同時對斜拉橋施工中關鍵參數斜拉索中間索力和主梁立模標高的確定和調整做了進一步的分析,提供了相應的計算方,並應用於仙桃漢江公路大橋施工控制過程中,取得了良好的效果。
  13. Furthermore, its response changed little even after the sensor was soaked in water for 30 min. four kinds of multi - layers nanocomposite humidity sensitive films, including sodium polystyrenesulfonate / poly ( diallyldimethylammonium chloride ) ( napss / pdda ), sodium polystyrenesulfonate / poly4 - vinylpyridine quaternized with butyl bromide ( nbubr - p4vp ), sodium polysryrenesulfonate / zinc oxide ( napss / zno ) and sodium poly ( acrylic acid ) / zinc oxide ( paana / zno ), have been prepared by means of self - assembly

    用靜電吸引自組制備了聚苯乙烯磺酸鈉( napss )聚二烯丙基二甲基氯化銨( pdda ) 、 napss溴代丁烷季胺化聚4 -乙烯吡啶( nbubrp4vp ) 、聚苯乙浙江大學碩士學位論文摘要烯磷酸鈉則apss們化鋅面ox聚丙烯酸鈉p句zno四個體系的自組納米復合濕敏膜及濕敏元件。
  14. 5. the methods of temperature - correcting on copper cylinders and copper spheres are discussed. the method of unitive temperature - correcting on plastic pressue - measuring elements is put forward for the first time. large quantities of quasi - dynamic calibration tests in different temperatures are carried out on the dropper - hammer hydraulic dynamic pressure calibration device and the unitive temperature - correcting formula which accords with the traditional correcting method is got

    在落錘液壓動標置上組織了多批次的銅柱、銅球高低溫準動態校準試驗,探討了建立溫度誤差統一修公式的可行性,建立了測壓銅球,測壓銅柱符合我國傳統修的溫度統一誤差修公式。
  15. Based on the small tactical missile system design, an engineering method for ram - air servo system dynamic accuracy analysis and verifying unit design is put forward

    摘要從小型戰術導彈總體設計的角度提出了一種繼電控制沖壓式伺服系統的動態精度和校置的工程分析和設計方
  16. Upright method of hull section construction

    船體分段建造正裝法
  17. The rational cable force under dead load of gonghe bridge is calculated by the least bending strain energy method 2. cable force controlled methords are introduced. the initial construction cable force of gonghe cable - stayed bridge are calculated by trial methord based on anvance analysis 3

    介紹了斜拉橋施工中常用的施工控制方及相應的索力控制方,分析了公和橋施工中所採用的「二次張拉到位」的索力控制方的特點和優點,通過基於分析的試算方得出公和橋施工中拉索的初始張拉力。
  18. In europe, cbp is looking to expand csi to at least 11 additional ports to include livorno, gioia tauro, and naples, italy

    在歐洲,海關與邊境保護局將集箱安全倡議擴大到至少其他11個港口,包括義大利的里窩那(
  19. Gas analysis - preparation of calibration gas mixtures using dynamic volumetric methods - capillary calibration devices

    氣體分析.標定用混合氣體的制備.動態容量.毛細管校
  20. This paper has studied and set up a supervision and control system based on the backing item of jinzhou yangtze river bridge with main span of 500m, by analyzing the development of construction control of cable - stayed bridges in china and abroad, foreword calculation of 250 work cases of plane bar fem, adoption of advanced equipment and devices, quick analysis of gathered data research of karemen filtering method, least square and gray model gm ( 1, 1 ) into the identification of the real state and precuts and effective manage mechanism

    本文以荊州長江公路大橋主跨500米的混凝土斜拉橋施工為應用背景,通過分析目前國內外大跨度混凝土斜拉橋施工控制現狀,結合該橋施工實踐,運用平面桿系有限元計算理論對大橋250個工藝進行計算,採用先進測試設備和儀器,利用計算機快速分析處理技術對現場監測系統收集的數據進行誤差分析,系用卡爾曼濾波、最小二乘和灰色理論gm ( 1 , 1 )進行結構真實狀態的識別和後期預測,通過科學高效的監控管理機制的運行和監控實踐,探索並建立了一套適合於大跨度混凝土斜拉橋的施工監測監控體系。
分享友人