歸堆 的英文怎麼說

中文拼音 [guīduī]
歸堆 英文
bunch
  • : Ⅰ動詞1 (返回) return; go back to 2 (還給; 歸還) return sth to; give back to 3 (趨向或集中於...
  • : Ⅰ動詞(堆積) pile up; heap up; stack Ⅱ名詞1 (堆積成的東西) heap; pile; stack 2 (小山 多用於地...
  1. The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated

    本文利用大變形固結有限元分析程序( lscfea )中的小變形平面固結分析單元( sse2 ) ,結合實體工程項目進行了地基固結沉降的有限元計算,分別得出河灘相軟土地基在考慮砂井和未考慮砂井作用下的固結沉降曲線及杭甬高速公路試驗段在高載情況下的固結沉降曲線;並對以上曲線特徵進行了分析,得出各時間段曲線斜率、角度在整個斷面的變化規律,以及沉降最大值與斜率、角度變化之間的線性回關系。
  2. Deadlock prevention and surprise dismount handling during this process require heroic efforts, including a mechanism whereby a file system driver can stash a pointer to an automatic variable ( that is, one allocated on the call / return stack ) to be used in deeper layers of recursion within the same thread

    在這個過程請求宏大結果的時候, (進行)死鎖預防和意外卸下處理,包括一個機制,憑借這個機制文件系統驅動可以中斷在相同線程中用於深層遞的自動變量的指示器(就是說,在調用/返回棧上分配一個) 。
  3. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和納了國內外石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  4. In the paper, the situation and method of scheduling problem studied of automated warehouse are surveyed completely. the problems of automate guide vehicle transport and stack crane picking order are analyzed deeply in parcel post automated warehouse, basic mathematic model of scheduling is set up

    通過對郵包自動化倉庫系統中的自動導引小車運輸問題和巷道垛機的揀選順序認真地分析,建立起了調度的基本數學模型,提出了用總的空載時間作為目標函數,並且把這兩類問題都結為求解旅行商問題。
  5. Thrown when the execution stack is exhausted by having too many pending method calls ; usually indicates a very deep or infinite recursion

    當執行棧由於具有太多的掛起方法調用而耗盡時,就會引發此異常;這通常表明存在非常深的遞或無限遞
  6. Search algorithm, definition of sort, insertion sort, quick sort, optimal sort time, merge sort, heap sort, radix sort, summarize of sort algorithms

    搜索演算法;排序定義;插入排序;快速排序;最優排序時間;並排序;排序;基數排序;排序總結。
  7. The xsl processor stack has overflowed - probable cause is infinite template recursion

    Xsl處理程序棧溢出-可能的原因是因為無限的模板遞
  8. Is thrown for execution stack overflow errors, typically in case of a very deep or unbounded recursion

    因執行棧溢出錯誤引發,通常在存在非常深的遞或無界遞時發生。
  9. Insertion sort simplified - approximately ten kinds of sorting methods are available, namely heap, quick, merge, insertion, shell, selection, bubble, linear, address selection, and radix sort

    大約有10種排序方法,如排序、快速排序、並排序、插入排序、外殼排序、選擇排序、早泡排序、線性排序、地址選擇排序和基排序。我自己提出了一種簡化的快速排序。
  10. The chemical evaluation and plant growth evaluation methods of the maturity for compost were introduced and summarized

    摘要就目前肥化處理現場較為適用的化學分析、植物生長等肥腐熟度評價方法做了納和適用性介紹。
分享友人