段工 的英文怎麼說

中文拼音 [duàngōng]
段工 英文
smith
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. This paper discusses the advantages of boq, and introduces the principles, main contents and requirements of boq. this paper analyzes cost controlling under boq, and mainly discusses the problems of boq tendering

    本文探討了程量清單計價的優點,介紹了其編制的原則、主要內容與要求,分析了不同階段工程量清單下造價的控制,並著重探討了與程量清單招標的有關問題。
  2. Work on the last section of the primary road link to ma on shan town centre is scheduled for completion in 2000

    馬鞍山市中心主要連接路最後一段工程,定於二零零零年完成。
  3. North and south kowloon sewerage, stage 2

    九北部及南部污水收集系統第2階段工
  4. Project proposal, feasibility rearch report, preliminary design and working drawing design in steel rolling projects, including product lines such as bar mill, wire mill, tube mill and strip mill ect

    軋鋼(含型、線、管、帶等生產線)程設計的各階段工作,項目建議書、可行性研究、初步設計,施圖設計。
  5. Studies completed included sustainable development for the 21st century ; feasibility study for additional cross - border links stages i & ii, review of framework for industrial land provision and reservation strategy, survey of housing aspirations of households ( 1999 ), and the cross boundary travel study

    已完成的研究包括:二十一世紀可持續發展研究、新跨界通道可行性研究第一及第二階業用地供應及預留策略大綱檢討、一九九九年住屋意願統計調查,以及跨界旅運研究。
  6. This also means that at each step the crafter must be willing to wait for optimal crafting conditions with the weather and astronomical signs

    這同時也意味著,在製造的每個階匠們必須要竭盡全力選擇好製造條件,比如天氣和占星徵兆。
  7. For the foundation treatment of the experimental segment of the south shore expressway of the hangzhou bay cross sea bridge, the in situ monitoring has been conducted for more than two years by use of vacuum - surcharge preloading

    摘要結合杭州灣跨海大橋南岸接線高速公路試驗段工程,對真空堆載聯合預壓技術處理的試驗斷面進行了長達兩年多的現場測試。
  8. Last year we expanded access to real time gross settlement and implemented the first phase in the deregulation of the remaining interest rate rules

    在2000年,我們擴大即時支付結算系統的適用范圍,並推行全面撤銷利率規則的首階段工作。
  9. The construction on hegang - nenjiang road and hegang - yichun road section has been accomplished and a mountainous road of high grade pave has been built again in xiao xing an ling region, there were a great deal of complex questions during building

    鶴崗至嫩江公路鶴崗至伊春段工程建設已經完成,小興安嶺地區又建成了一條高等級路面的山區公路。
  10. The engineering geology condition from the sections of xiangshou county of shiping to dashizhui of hejin of the yellow river were introduced from the aspects relating to geology such as geo morphy, geologic structure, stratum and earthquake were introduced in the paper and the preliminary opinions on the problems of navigation development work were also proposed in the paper

    從地貌、地質構造、地層、地震及有關地質現象等方面,介招黃河石坪(鄉守縣)至河津(大石咀)段工程地質狀況,對該河在航運開發作中的問題提出初步意見。
  11. The thesis comprehensively deliberates stochastic and fuzzy character of controlling the cost of engineering construction ; it takes quantitative analysis as the dominant factor, takes qualitative analysis as the secondary factor, establishes an comprehensive system of controlling the cost, and make various theories, the basic principles and the methods of engineering maths in the analysis and calculation of controlling the cost of engineering construction, such as effect theory, fuzzy maths, value engineering, grey system and system simulation. it also establishes the simple and effective practical model. on the basis of practical example, it puts forwards the train of thought and method to controls the cost of engineering construction in the different stage

    本論文綜合考慮了程造價控制的隨機性和模糊性,以定量分析為主,定性分析為輔,構造了造價控制的綜合體系,將效用理論、模糊數學、價值程、灰色系統、計算機模擬等多種理論及程數學的基本原理和方法應用到程項目造價控制的分析和計算中,建立了簡便而有效的實用模型,並結合程實例,提出來了不同階段工程造價控制的思路和方法,針對不同的情況,綜合應用定性與定量的控制方法,消除了以往程項目造價控制只停留于項目實施階的缺陷,提高了量化研究的水平和準確性,為政府建設管理部門進行科學管理及各建設參與單位今後進一步改進自身的項目造價管理作提供了寶貴的理論依據。
  12. Depot s worker was too. the helmet was already used in japan at that time

    在機務段工作的人戴斗笠,這是和日本最不一樣的風俗。
  13. Despite having spent hk 1, 700 million on this shenzhen river regulation project, the shenzhen government still thinks the river is too polluted and that the next course of action is to spend a further rmb 950 million to build a pumping station at sha tau kok and a 13 km long pipe to bring water from mirs bay to flush the shenzhen river

    雖然這項深圳河調整程耗資港幣17億,但深圳特區政府認為河道污染情況仍然嚴重,因此計劃進行次階段工程:耗資9 . 5億人民幣在沙頭角與建一座抽水站和13公里長的管道,把大鵬灣海水引進深圳河。
  14. In order to achieve the optimized tunneling approach, first, tunneling procedures, shift length, horizontal jet grouting length, bench length and space length between c and d part of crd method are optimized ; on the basis of these results, two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved. as results of the optimized scheme, the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure. the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data

    為得出適合本段工程的最佳施路線,利用大型有限元通用軟體ansys對開挖順序、開挖進尺、水平旋噴長度、臺階長度及crd法施的c 、 d部相錯長度進行了有限元數值模擬和優化分析,並利用這些分析結果,進行了兩個施方案的三維有限元動態施模擬,得出了較優的施方案,並利用施后的地表沉降槽曲線,對sk3 + 355斷面處隧道上方的煤氣管線的安全性進行了分析,得出了利用此施方案施不會造成此處煤氣管線破壞的結論。
  15. At present, the means for repairing hydraulic turbine blades in our country are still manual weld and manual polish. the working condition is bad and labour intensity great for workers and overhaul efficiency low and inferior

    目前,國內水輪機轉輪葉片修復仍採用手補焊、人打磨等檢修手人勞動環境惡劣,勞動強度大,且檢修效率低,質量差。
  16. Properly utilized, these tools help avoid the dangers and reveal the best that the new landscape has to offer

    只有正當地利用這些手,這些手段工具才能幫助我們越過險灘,為我們揭示即將出現的最好最新的風景。
  17. The survey and the collection of data by the consultants is only the first phase of the review. staff members will be further consulted when the consultants report is received, and the university may or may not accept all or part of the recommendations of the consultants

    顧問公司所進行的調查及收集到的數據只屬整項檢討的首階段工作,待收到顧問公司的報告和建議后,大學會向員再進行諮詢,而大學有可能接受或拒絕顧問公司所提出的全部或部分建議。
  18. Abstract : considering the status quo, characteristics and prospects of decorative engineering including design, construction and contract and according to the current engineering cost supervision system and relevant policy, law and regulations in china, this paper introduces a method of budgeting for construction drawing of decorative engineering which can better meet the present - day needs

    文摘:根據我國裝飾程在設計、施、施承包等方面的現狀、特點和發展前景,結合我國現階段工程造價管理體制和相關政策、法令、法規等,提出可能較好地適應現實需要的裝飾程施圖預算的編制方法。
  19. Chen, j. j. w., peck, k., hong, t. m., yang, s. c., sher, y. p., shih, j. y., wu, r., roffler, s. r., wu, c. w. and yang, p. c

    現階段工作在於研發新的生物晶片技術以及應用晶片技術于基因體蛋白體及癌癥和傳染性疾病的基礎研究與檢測應用。
  20. Since there is unemployinent in the town and every migrant cannt expect to and a job there, the model postulates that the expected differenal between urban and rural wage decides the migration action. if and only if the expected urban wage mpasses the rural wage, workers from rural areas to urban areas cannot stop

    研究發現,這一時期中國業化和城市化大體可以分為輕業優先發展與離土不離鄉階、鄉鎮企業大發展與進廠進鎮不進城的階業化的縱深發展與離鄉又離土、進鎮又進城階等三個主要發展階
分享友人