水下采礦 的英文怎麼說

中文拼音 [shuǐxiàcǎikuàng]
水下采礦 英文
marine mining
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : 采名詞(采地) feudal estate
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • 采礦 : mining; mine (for minerals)采礦船 dredger
  1. Develop as the development of socialist market economy, the buildup of idea of people goods economy, the person with thin idea of a few legal system, below the drive of economic interest, illegal building takes up the road is produced or waste material of rubbish of operation of stone of blast of market trade, cut into a mountain, mining, dump and building is formed to be banned repeatedly inside formulary control division more than ; use illegally, embezzlement, pollution, destroy, destroy highway the road is produced and trade of strike of facilities of larcenous highway transportation, machines and tools, equipment, raw material, steel is cultivated and the random on highway check that set a station, chaos collects fees, random amerce, highway is shown street change spread ; exceed restricted transport to be defeated the in good condition, safety that waits for minatory highway, expedite the development with highway career, of benefit of the economic benefits of highway, society and level of road network service rise, more and more rely on what road politics government works to strengthen

    隨著社會主義市場經濟的深入發展,人們商品經濟觀念的增強,一些法制觀念淡薄的人,在經濟利益的驅動,非法建築物佔用路產或在規定控制區內形成集市貿易、開山炸石、作業、傾倒垃圾和建築廢料屢禁不止;非法利用、侵佔、污染、毀壞、破壞公路路產和盜竊公路交通設施、機具、設備、原材料、盜伐行道樹以及在公路上亂設站卡、亂收費、亂罰款,公路呈街道化蔓延;超限運輸等威脅著公路的完好、安全、暢通和公路事業的發展,公路的經濟效益、社會效益和路網服務平的提高,越來越依靠于路政治理工作的加強。
  2. Through the analysis of hydrological yeologys features by analyzing the gielding water of mining section, the critical value of waterhead, the critical thickness of water - resisting layer and othr hydrological geology factors concerned, the researches on the feasibility of the extraction of eastern mine area liyi mine at - 660m under ground with the menance of high - level limestone water have been done

    主要通過文地質特徵分析,從區涌量、臨界頭值及臨界隔層厚度及相關的文地質因素對李一- 660m平東翼區在高位灰巖威脅開採的可行性進行了研究。
  3. The application of the cemented filling technic in this mine has proven that it has such advantages as high concentration of slurry, low cost of filling and filling without dewatering, etc., so that it is special fit to underhand drift cut - and - fill stoping

    山應用證明,該技術具有充填濃度高、充填成本低、充填體不需脫等顯著優點,特別適合於向進路膠結充填法中應用。
  4. Abstract : on the basis of site actual measurements, the safety of the combined mining of 16 and 17 thin seams under water body in the 4th mining area of zhaopo coal mine was evaluated by means of inversion analysis and numerical modeling. some relevant mining scheme and technical measures were worked out so as to ensure smooth production

    文摘:以現場實測結果為基礎,利用反演分析和數值模擬計算手段對趙坡煤山部分距老空區極限距離的16 、 17薄煤層聯合開採的安全性進行了評價,並制定了相應的開方案和技術措施,保證了生產的順利進行。
  5. Mining experiment of upper coal seam under changxing karst aquifer in fengcheng mine area

    豐城區長興灰巖巖溶上煤組開試驗
  6. The results show that distinct " bench " distribution rule takes on for the subsidence and distortion of bench - shape slope surface ; the movement range of bench - shape slope surface is smaller but its distortion is larger than those of flat surface and concentrated distortion occurs at every bench plan ; the surface horizontal distortion of bench - shape slope is still pressed in gob centre and tensioned in both sides of gob ; space - time effect should be taken into account for the stability of bench - shape slope influenced by underground mining

    結果表明:露天煤臺階狀邊坡體的動沉陷規律表現出很明顯的「臺階」分佈特點;臺階狀邊坡地表的移動范圍比平地地表要小,但變形卻更劇烈,且在各臺階平面處形成變形集中;臺階狀邊坡地表的平變形仍然呈現出空區中間受壓,兩端受拉的特點;臺階狀邊坡在地擾動的穩定性應考慮空區的時空效應。
  7. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .利部「工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地室修漏與裂縫補提出技術方案被納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  8. As mineral exploration and exploitation laying particular stress on coal resources, it made the structure of mineral exploration and exploitation out of balance and depressed the efficiency. lower production level mak ' ing mineral resources overexploited, precious reserve wasted and the fragile environment polluted

    由於太原市的產開發長期偏重於煤炭生產,且業是一種「粗放式」的經營模式,科技和管理平落後,形成了產資源開發結構失衡、經濟效益低的局面,造成資源過量開、引起資源浪費、生態環境污染嚴重等問題。
  9. During the middle and late 1980s, without control from the government, ganzhou tungsten industry resulted in the situations of illegal exploration and mining, losing control of quality, smuggle and out - of - order competition

    80年代中末期,在「大大開,小放開,有快流,國家,集體,個人一齊上」的錯誤主張影響,贛州鎢業陷入了亂濫挖,產量失控,走私販私,無序競爭的混亂局面。
  10. Mining in the region which the

    資源豐富地區的山開與可持續發展
  11. Analysis on water isolation layer conditions of taiayuan group lower coal seam mining of hebi coal mine

    鶴壁區開太原群組煤的隔層條件分析
  12. Through inversion analyzing the results of inspection and observation which was applied the multipoint displacement measures and the drilling anchor stress measures to the top surface in the xianggui gypsummine eastern workings, this article will attempt to propose the deformation law of stope terrane after the underwater mine area, which provided a reliable basis for taking measures to control the strata movement

    摘要為了研究湘桂石膏的巖體變形規律,對該區頂板巖孔多點位移計觀測和鉆孔錨桿應力計檢測的結果進行綜合反演分析,提出了區開挖后場巖層的變形規律,為採取有效措施控制巖層移動提供了依據。
  13. Along with construction of hydropower project, exploitation of ore, deposition of nuclear waste, development of terrestrial heat and so on, more and more geotechnical engineering is in the high hydraulic head, and deep embedded geohydrological condition, the hydraulic fracturing of rock mass is paid more and more attentions by engineering scholars

    隨著電工程建設、井工石開、地核廢料儲存、地熱開發等越來越多的巖土工程都處于高頭、大埋深等惡劣文地質條件,巖體力劈裂逐漸受到越來越多工程界學者的關注。
  14. In the special fields locking valves, underground mining, water hydraulic systems or beyond that with mining machines, hydraulics, selector valves as well as with aggregates, open cast pit, strip mining, surface mining and / or with hydro and hydraulically is saartech hydraulik gmbh well - known

    Saartech hydraulik gmbh是一家現代化的、可靠的專門產品供應商,這家供應商從事成套設備、機組,山機械,液壓系統,液壓,液壓動力源,液壓缸,醫藥技術,地,地,整流器、整流管、閥、閥門,截止閥、關閉閥,露天壓學、壓技術、壓系統,方向閥,換向閥,液壓的的製造、銷售。
  15. Advance in chinas underground mining methods is reviewed, caving mining, open - stope mining and stoping - filling mining that reflect chinas underground mining technological level are summed up and the developmental trend of chinas underground mining methods is forcasted

    回顧了建國50年來我國地方法的進展,概括總結了體現我國地技術平的崩落法、空場法和充填法,展望了我國地方法的發展趨勢。
  16. Based on its special geological and mining conditions of qidong colliery, the cause of water bursting of loose aquifer in the 4th lineage in 7 ( subscript 1 ) 14 full - mechanized mining face of the first mining area was analyzed and technology method of preventing the 4th loose aquifer was discussed according to the occurrence characteristics of loose aquifer and damage characteristics of overburden rock in 7 ( subscript 1 ) coal seam

    摘要根據祁東煤特殊的地質條件,結合鬆散含層賦存特徵及7 (標1 )煤層覆巖破壞特點,分析了一區7 (標1 ) 14綜工作面第四系鬆散含層出的原因,探討了防治四含的技術途徑。
  17. The technology of directional butted & connected well means to butt & connect two or more wells directionally at the underground target extraction layer which is hundreds of meters away from the ground but hundreds of meters away from each other on the ground to fulfill mining with two or more wells connected

    摘要定向對接連通井技術是採用定向鉆探技術和平井技術,使地面相距數百米的兩井或多井,在地數百米甚至數千米的目的開層定向對接連通,實現兩井或多井連通
  18. Study on mining upper limit under conglornerate water in 1 seam third district of hebi no. 8 mine

    鶴壁八區礫巖二1煤層開上限研究
  19. Article 26 : in mining operations or the construction of underground projects, when water drainage results in lowering of the groundwater table, groundwater depletion, ground subsidence or cave - ins, and causes losses to the livelihood and production of other units or individuals, the mining unit or the construction unit shall take remedial measures and compensate for the losses

    第二十六條開藏或者興建地工程,因疏干排導致地降、枯竭或者地面塌陷,對其他單位或者個人的生活和生產造成損失的,單位或者建設單位應當採取補救措施,賠償損失。
  20. Based on the mechanism of the effect of unconsolidated confined aquifer on the compound breakage of key strata, the fully mechanized support crushing accidents taking place during coal mining under the unconsolidated confined aquifer and thin bedrock in some collieries of east china have been well explained

    基於鬆散承壓含層對薄基巖場關鍵層復合破斷影響機制,很好地解釋華東區部分井在鬆散承壓含層與薄基巖的特殊條件場發生壓架事故的原因。
分享友人