水位高程 的英文怎麼說

中文拼音 [shuǐwèigāochéng]
水位高程 英文
water level elevation
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 水位 : stage; water level
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站於西雅礱江的三灘至手爬溝河段,壩型為305米雙曲拱壩,正常蓄1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. The analysis of micro - climate site of the road greenbelt in the building process of expressway, a lot of calcareousness, powder of coal ash, asphaltum and stone were put into used. on one hand, it completely destroys the original soil structure, making the soil really barren, on the other hand, the rise of roadbed also affects the ground water to go up, making the soil very drought

    路體綠地立地條件分析速公路在修建過中,採用了很多的石灰、粉煤灰、瀝青、石塊等材料,一方面使原有的土壤結構被徹底破壞,土質十分貧瘠,另一方面路基抬影響地下上升,土壤十分乾旱。
  3. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河流的洪特點,結合以往工實際,對影響跨河橋梁設計度的主要因素? ?設計洪流量及其相應洪的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍江省的河流粗糙系數和洪比降的確定原則,並介紹了三日降雨量法。
  4. Then, main projects and synthetic techniques of ecological agriculture construction are discussed. the results indicate that main projects include fertile soil project, water conservancy, forestation and virescence project, agricultural structure adjustment project, agriculture industrialization project, integrated use of agriculture rejectamenta project, high quality and innoxious farm produce project, livestock breeding project, sight - seeing agriculture project, etc. the suited techniques include ecology location scheme technique, agriculture rejectamenta use technique, energy source regeneration technique, sewage biologic depuration technique, innoxious farm produce technique, soil fertility increase technique, ecological control technique of plant disease and insect pests, economizing water technique of dry farming, agriculture environment reconstruction technique, etc. lastly the study brings forward the countermeasure and advice of ecological agriculture development

    根據我國生態農業建設成功經驗和濟南市目前生態農業建設基礎,提出濟南市生態農業建設重點工為沃土工、農田利工、造林綠化工、農業結構調整工、農業產業化工、農業廢棄物綜合利用工、優質和無公害農產品工、養殖工、觀光農業工等;生態農業建設的關鍵技術為生態配置技術、農業廢棄物資源化綠色技術、能源再生技術、污生物凈化利用技術、無公害農產品技術、地力持續培肥利用技術、農作物病蟲草害生態控制技術、旱作農業效節技術及農業生態環境綜合整治技術等。
  5. At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel

    首先,系統分析了影響黃河沙因素,及僅用沙因素有效研究的可行性,並按變量對應思想採集它們的相應數據;其次,由於相應數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提出了能有效實現這類數據精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃河中及中低含沙類洪相應的擬合,實現了這一典型非線性關系的精度擬合,各年汛期上下游相應洪的擬合誤差都較小;最後,明確黃河下游含沙量對的主要影響方式,即含沙量主要是與其它因素聯合對作用;另外分析了要實現變動河床洪準確預報的困難所在及改進方向。
  6. Tunnel construction is very difficult hi region with high geotectonic stress and high subsurface water pressure. few deep - lying tunnels are constructed in civil conveyance and hydropower engineering up to now

    特別是對在地應力、地下區域的隧洞建設,其施工難度更大,在國內的電工建設中並不多見。
  7. The schools offer uniform master s courses or higher vocational level studies ( licentiate or engineer degrees ) and supplementary master s degree studies

    這些學校提供統一的碩士課,或等職業研究平課(學士或工師學)和補充的碩士學學習課
  8. The mechanical genesis of the complicated rock mass is because several times of tectonism in pro - period made the structure of rock mass in the right dam foundation damaged seriously and rock mass alteration made its mechanical character more anisotropy. after that the fractures in the right dam foundation slope were stretched at the beginning of the quaternary period because in the period yakouhoushan mountain quaquaversal dome was blowups quickly. at the same time, the valley trenching of lancang river reach to 800 - 1000 meter in altitude at the right bank in nuozadu dam site

    導致右岸巖體復雜化的成因是,右岸巖體在早期遭受了多期構造作用和巖體蝕變的基礎上,第四紀早期丫口後山穹隆的快速隆起與當時河谷下切至800m 1000m這一特殊因素組合引起了右岸巖體沿原有的斷裂(裂隙)張開,使地下等風化營力能夠到達坡體較深部,經過長期的風化卸荷作用,形成了右岸復雜巖體。
  9. It was specially pointed out that, when the tail water is constant maximum tide, the computed flood surface is higher than that of nonsteady current, so there is some safety superelevation. underestimation of the roughness will make downward bias to compute along - river surface and bring hidden trouble for flood control. to improve the section can decrease the water level or offset the water rise for increase of floodplains " roughness, but it need much engineering works

    特別提出,按照恆定流計算出來的設計比非恆定具有一定的安全儲備;而對于灘地糙率的低估又會造成設計的偏低,給防洪工作帶來隱患;如果利用改進斷面形式來降低或彌補糙率增加帶來的,需要較大的工量,所以平時應注意灘面的減糙管理工作。
  10. In this paper, the main research works are as follows : 1 ) survey and analysis previous work in auv navigation and summarize : as the cumulate error, the dead - reckoning and inertial navigation systems ca n ' t be used without other modified system ; the acoustic navigation system is used only in small range, and is very expensive. 2 ) two important approaches in geophysical navigation techniques are summarized, one is terrain contour based navigation, this approach is investigated keystone today ; the other is image based navigation, due to no perfect image sensors and image seabed map, this approach has seldom been practised. 3 ) two important terrain contour based navigation algorithms has been applied to auv, one is match algorithm - based terrain contour match ( tercom ) ; the other is kalman filter - based sandia inertia terrain - aided navigation ( sitan )

    主要研究內容包括:一、總結分析了當前下導航的常用方法和不足之處,指出基於航推算的導航方法,存在著最大的問題就是導航誤差的積累問題,如果沒有修正系統,這種方法很難滿足使用要求;其次指出基於聲學的導航方法,造價昂貴,導航范圍有限,難以滿足自主下航行器大范圍導航的需求;二、總結了當前下地形輔助導航的主要技術路線,一是基於地形的匹配方法,這是當前研究的重點;二是基於地形圖像的匹配方法,由於缺乏良好的圖像傳感器,和可用的海底圖像地圖,目前這種方法還有待研究發展;三、將兩種地形匹配的常用方法應用到自主下航行器上:以相關演算法為前提的地形輪廓匹配( tercom )方法和以卡爾曼濾波為基礎的桑迪亞慣性地形輔助導航( sitan )方法,前者演算法簡單可靠,但是導航精度不,後者雖然精度比較,但存在著演算法較為復雜、有可能發散和出現奇異值等問題。
  11. Taking the measure of uncorking on the steel tube and filling water before sand filling, the installation process of sand compaction piles is optimized, the installation parameters and testing rate under the near shore condition are confirmed, and the control and testing methods for the piles ' quality are summarized

    採取樁管壁開孔、先灌后灌砂的方法,優化了上擠密砂樁的施工工藝;給出了在近岸無掩護、流急的施工條件下的施工參數和檢驗比率,總結了沉樁定式控制制、灌砂率等參數的控制措施和檢驗方法。
  12. Shipment traffic usually is heavy in littoral area, the navigation capability is required in many riverway. navigation lock was set to suit for the water level ' s variety caused by tide. for a long period, being lack of the quantified assessment on the influence of saltwater intrusion, approaches that freshwater is inpoured to the lock chamber are adopted lest the high concentration salt water be imported to the inland waterway, when the navigation lock is in operation. but such manner should not be reasonale enough

    沿海地區船運發達,很多河道有通航要求,為克服潮汐造成的變化而設置船閘。長期以來,由於缺乏對鹽入侵內河河道產生影響的定量評估,在船閘運行過中為防止鹽度鹹入侵內河,通常採用將內河淡打入閘室的方式來調節通航,船閘的這種運行方式不盡合理。
  13. Abstract : the fuzzy control technology in fuzzy control roller washing machine is introduced. the water level, water stream, washing time, rinse times and dehydration time can be determined according to clothes weight, temperature and turbid. the automation of washing clothes is realized through the application of fuzzy control technology

    文摘:介紹了模糊控制全自動滾筒洗衣機的模糊控制技術:通過傳感器檢測被洗衣物的布量、洗滌液的渾濁度和溫度,利用模糊推理的方法自動確定低、流強度、洗滌時間、漂洗次數和脫時間.模糊控制技術的應用實現了衣物洗滌過的全自動化,具有一定的智能功能
  14. Because the elevation data we have acquired through gps is too variable to satisfy the mapping accuracy requirement the elevation value is solved by the water lever observation in the hydrology station and datum horizon correction of sounding observation

    由於gps的rtk模式測量所獲取的精度不能滿足測圖精度要求,因此其值是通過測量深值、結合其統一到基準面的改正數、根據相關文部門各站提供的觀測資料綜合計算獲得。
  15. Currently sewage in sewage pumping station system is pumped manually. so the station is working in low water level and energy is consumed. this mode ca n ' t predict the inflow ' s changing

    當前污泵站排放系統主要採用人工值守方式排,低耗能嚴重,且缺乏預測能力,流量洪峰來臨時易產生污溢出污染。
  16. After the reservoir sluices, the national highway 213 in this area will be submerged. so the national highway 213will increase its elevation to about 920 meters. in order to estimate the influence of the slope - sliding and bank - collapsing which caused by the reservoir sluices to the elevated highway, and to estimate possible emigration problem, stability analysis of landslide body no. l, 2, and 3 in i, ii area which located in bank accumulation body of zipingpu reservoir in national highway 213 is made by transfer coefficient method and 2 - d 3 - d fem in this paper

    紫坪鋪庫正常蓄水位高程877m ,庫蓄后將淹沒該段現國道213線,因此國道213線將改線抬至920m附近,為正確評價因庫蓄造成的滑坡、塌岸對改線公路的影響,以及可能產生的移民問題,本文用傳遞系數法和二維、三維有限元方法對有可能失穩的213國道紫坪鋪庫區庫岸堆積體、區的1號、 2號、 3號滑坡體進行了穩定性分析。
  17. Abstract : variations of flow pattern, flow velocity in deep poo l and side bar, mainstream thread, and water surface, caused by excavation project, are investigated by two - dimensional mathematical model in an orthogonal curvili near coordinate system. the change of bed - load transport rate, and redeposition r ate are predicted. the influences of the excavation project on navigation are ana lyzed. grid - type and flat - type excavation alternatives are proposed and discuss ed

    文摘:採用正交曲線坐標系下的河道平面二維數學模型,研究了嘉陵江何家磧邊灘采砂后河道流勢、流態、灘槽流速、主流置、及比降的變化規律,預測了采砂方案完成後卵石推移質輸沙率變化及其對航道的影響,並對格形開挖和平整開挖方案進行了比較分析
  18. Note 4 : installation dimension used in the cable and pole transmitter, if measuring range of well water - level is 10 m, installation dimension is 11 m, then extra 1 m use to installation regulating, actual measurement is 10 m and does not notice. cable type approves height regulation is 1 m pole type users should be detail noted the installation dimension

    注4 :安裝尺寸在纜式及桿式變送器使用,如測量10m安裝尺寸11m ,則多出1m作安裝調節用,實際測量為10m ,不註明,纜式默認1m度調節,桿式用戶應詳細註明安裝尺寸。
  19. Note 3 : installation dimension used in the cable and pole transmitter, for example measuring range in water - level of well is 10 m, installation dimension is 11 m, then extra 1 m acts as installation regulating use. actual measurement is 10 m and does not notice. cable type approves height regulation is 1 m, pole users should be detail noted the installation dimension

    注4 :安裝尺寸在纜式及桿式變送器使用,如測量10m安裝尺寸11m ,則多出1m作安裝調節用,實際測量為10m ,不註明,纜式默認1m度調節,桿式用戶應詳細註明安裝尺寸。
  20. The sliding resistance mechanism of deformable earth bodies by means of well point drainage lies in lowering the underground water level to reduce the water content of the earth bodies and raise the shear strength, improve the stability of the deformable earth bodies and increase their sliding resistance

    摘要井點降常用於地下出開挖建基面許多或含豐富的土體基坑工中,井點降在土質變形體中的抗滑作用機理在於,通過井點降,降低地下,使土體的含量減少,提其抗剪強度及變形體的穩定性,增加其抗滑力。
分享友人