水力發電開發 的英文怎麼說

中文拼音 [shuǐdiànkāi]
水力發電開發 英文
hydroelectric power development
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 名詞(頭發) hair
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  1. A scheme to be formulated and submitted for approval to the harbour commissioners for the exploitation of white coal hydraulic power, obtained by hydroelectric plant at peak of tide at dublin bar or at head of water at poulaphouca or powerscourt or catchment basins of main streams for the economic production of 500, 000 w. h. p. of electricity

    有個建造廠的計劃:利用都柏林沙洲的滿潮噗啦呋咔272或鮑爾斯考特瀑布273的位差主要河流的流域來白煤,經濟生產五十萬。擬好后,將提交港灣委員會,以便獲得批準。
  2. The correlated degree of the density of deformed and failured masses and correlative dynamic force factors in tiger - leaping gorge reach are analyzed by effect measure analysis method which combines qualitative and quantitative analysis, and the key dynamic factors of bank - slope stability are established, which can provided the scientific information for origin division, evaluation, prevention of geological hazards and project planning

    本文採用定性與定量相結合的效果測度分析方法,對虎跳峽河段岸坡變形破壞密度與相關動因子進行關聯度量化分析,從而確定了影響岸坡穩定的關鍵性動因子,可為中的岸坡災害成因類型劃分、危險性評價、災害治理和工程規劃設計等提供科學依據。
  3. Hydroelectric power is cleaner than coal burning and safer than nuclear plants, and steps will be taken to protect the environment

    比煤乾凈許多,比核能安全。相關環保措施已經始執行。
  4. In order to guarantee the normal operation of hydroelectric generator unit, it is necessary to make a thorough test of the performance and characteristics of a governor before it is installed or after it is overhauled. to facilitate the test of the governor, a real - time dynamic simulator based on pcc for water turbine governing system was developed. it has three functions : simulating controlled objects ( pressure water conveying system, water turbine, generator and electric grid ), simulating governor " s electro - hydraulic servo system and working as a real - time measuring system for governor

    輪機調速器是機組一個很重要的自動化調節設備,它由調節器和液隨動系統組成,在調速器安裝或者大修后都要對其性能和特性進行全面測試,為了方便對輪機調速器的測試,特機組調速系統實時動態模擬儀,該模擬儀具有三種功能:對調速器調節對象(有壓引系統、輪機、機和網)進行模擬、對調速器液隨動系統與調節對象進行模擬和作為實時測試系統監測調速器的工作是否正常。
  5. In combination with the important immediate significance of hydropower development and its main problems, this paper puts forward several policy suggestions on quickening the development of hydropower resources in china

    結合的重要現實意義及其面臨的主要問題,提出了加快我國資源的若干政策性建議。
  6. After we built waterpower - electricity station, we can strengthen flood - preventing ability of downstream, improve the condition of farmland irrigation and town - supplying and region environment and so on. exploitation extent of waterpower resource is an important symbol of scientific and technical advancement and economic development

    建設站的同時,往往還可以提高下游防洪能,提供農田灌溉和城鎮供條件,改善區域環境等,能資源利用程度,是科技進步和經濟展的重要標志。
  7. A new method for realization of multi - channel data acquisition on windows flat form is brought forward in allusion to the feature of hyper - low frequency with water pressure pulsation in hydroelectric sets. and various anti - disturbance solutions are adopted in connection with the detection environment. the device proved to be able to has been meet predetermined requirement by its engineering application

    針對機組壓脈動超低頻特性,出一種在windows平臺上實時多通道數據採集系統,並結合測試現場環境,提出了抗干擾的各種措施.經實際運用,達到了預定要求
  8. Hydroelectric power exploitation can reduce sediment disposal, lengthen life of power plants in lower stream, control stream, better water quality, and reduce contamination etc. considering the structure of power of sichuan province and pointing out its six problems in power development, this thesis comes up with sustainale development strategy of sichuan hydroelectric power exploitation, that is, prefentially exploit large scale hydropower plant which has good water - adapting capability, comprehensively use water resource, try to reduce cost caused by drowning, stimulate rotating exploitation, well deal with settlement of people in hydroproject construction, and alleviate contamination

    論述在減緩泥沙淤積、延長下游站壽命、調控流、提高供量、改善質、提供清潔能源、減少環境污染等方面對長江上游生態屏障建設的作用。本文研究分析了四川的可持續展戰略,首先對四川省結構現狀進行了分析,指出目前四川展存在的六個主要問題,從優先具有良好調節性能的大型站、綜合利用好資源,盡最大可能減少庫淹沒損失,積極推進流域梯級滾動綜合,處理好庫移民關系,減輕對環境的不利影響等六個方面論述了的可持續展戰略。
  9. Abstract : having conducted investigation into problems related to the macro development of exploitation of pearl river valley ' s water power resources , the authors discuss water power resources of the valley and conditions and level of their exploitation and probe into the strategic deployment for their exploitation in the mid 21 century according to the economic development, electric power planning and also possibilities of regional network construction of related provinces

    文摘:對珠江流域能資源利用宏觀展有關問題進行了研究,著重論述本流域能資源及其利用條件和程度,根據各省(區)經濟展、規劃和區域網結構建設的可能性,探討21世紀前期,重點是21世紀前20年的戰略部署。
  10. By incorporating the power sources location and load prediction results in the energy utilizing proposal, a balance for the power volume needed by 3 counties in the area in three " five - year plans " period is also made, the result of which indicates that, it can meet the power demand required by the social - economic development in the region in next three " five - year plans " if the water power resources are rationally planned and developed and then a comprehensive energy utilizing proposal by combining solar and winding energy together

    並結合區內源點分佈和負荷預測結果,進行了各縣三個五年計劃期間的量平衡。得到了相應的結論。基於對風能、光能和能資源各自特點的分析,文中進一步對多能互補系統進行了較深入的研究,明確了在阿里地區特定的自然條件下,採用風光互補抽蓄能方式的合理性及可行性。
  11. Specification for designing gas - insulation metal - enclosed switchgear of hydropower station

    廠氣體絕緣金屬封閉關設備配裝置設計規范
  12. Foreign exploitation of small hydropower has obtained some experience as follows : adopting the preference ; establishing a good administrative system ; focusing on the technological improvement, etc. yet, the rapid domestic development of small hydropower is due to the involvement of social forces and the proper preference

    國外小的經驗主要有採取優惠政策、建立良好的管理體制、注重提高科技平等。國內小展迅速,主要得益於社會量辦小、適當的優惠政策等。
  13. Then analytical measurements of the noise were carried out on both of the turbines by means of modern acoustic apparatus and a conclusion has been found that the noise of the concentrated wind energy turbine is lower than the one of the ordinary wind energy turbine and the root of the trouble to cause noise chiefly originates from the turbine blade. besides, the result of analytical measurement also reveals that the power output both of the wind energy turbines will increase with the increase of the wind speed and unfortunately does the noise too. in order to lower the noise, a measures of noise reduction have been advanced that an active method is to develop a wind energy turbine run at a lower rating of wind speed while the passive method is to adopt a board drilled tiny holes, having established a sound technological basis for the development of a kind of wind energy turbine of low noise and high level in the world

    主要對濃縮風能型風機在正常運轉時,噪聲產生的機理進行了理論分析研究,並與普通型風機的噪聲進行了對比實驗分析;利用現代聲學測試手段對兩類機型進行測試與分析,得出濃縮風能型風機產生噪聲低於普通型風機和葉輪是風機產生噪聲的主要部件的結論;通過對兩類機型的噪聲、輸出功率的測試,得出隨著風速的增加,兩類風機的輸出功率在增加,產生的噪聲也在增加的結論;提出了進一步降低濃縮風能型風機噪聲的措施,從主動降噪方面,研製低額定轉速的機;從被動降噪方面,採用微孔穿板的降噪結構;為研究一種國際上低噪聲、高平的風機打下了良好的技術基礎。
  14. Beijing - chinese engineers tuesday blew up a temporary barrier used during construction of the three gorges dam, unleashing the full force of the yangtze river upon the world ' s largest hydroelectric project

    周二中國工程師爆破拆除三峽大壩建設工程的臨時圍堰,世界最大的工程三峽大壩始接納全部長江江流。
  15. Abstract : some economic policies effecting hydropower exploitation in chinaare discussed and six suggestions are proposed accordingly : decreasing taxes on power project ; establishing reasonable formation mechanism of grid electric energe price ; establishing reasonable sharing mechanism of hydropower investment ; clearly defining recovery route for transmission engineering investment ; establishing sharing policy for regulating benefits of hydropower plant ; establishing foundation for hydropower investment

    文摘:論述了影響我國的一些經濟政策,並且有針對性地提出了六條建議:減輕項目稅賦;建立合理的上網價形成機制;建立合理的投資分攤機制;明確輸工程投資回收渠道;出臺站調節效益分配辦法;建立投資基金
  16. At present, the refurbish and upgrade of the hydroelectric generator have been started. as the output of hydraulic turbine has reached the request, it becomes very important how to deal with the upgrade of the generator

    目前,機增容改造工作已經始,這項工作中,在輪機出已能滿足增容要求的前提下,如何從根本上解決好機的增容問題,顯得尤為重要。
  17. Chinese state media report that the first turbine generator on the right bank of china ' s three gorges dam has begun sending electricity to the state power grid

    中國官方媒體報導說,中國三峽大壩右岸站首臺機組始向國家網輸送
  18. With the gradual built of three - gorges hydraulic power station and the execution of the project " electric power transmission from west to east ", the hydroelectric resource is being developed at top speed and the hydroelectric occupy more and more specific weight. the continuous completion and commissioning of large hydraulic power station, as well as the continuous increasing of extra - high voltage and long distance power transmission system, deteriorate the stability control problem of hydro - electricity system

    隨著三峽站的逐步建成和「西東送」計劃的實施,我國的進入了高速展的時期,大型巨型站不斷建成投運,超高壓遠距離輸系統不斷增長,在我國系統中所佔比重越來越大。
  19. With the further promotion of the state energy development strategy and the power transmission from west to east strategy, the development of hydropower resources in the middle reach of the jinsha river will be strengthened

    摘要隨著國家能源展戰略和「西東送」戰略的進一步推進,必將加大金沙江中游能資源度。
  20. The study on the connection project of the northwest power network and north china power network and the construction of hydropower bases in the southwest region is developed in the aspects of the hydropower development scale in the western of china, time sequence, possible capacity of power to be delivered to the outside, transmission directions, its economic reasonability and technical feasibility

    對西北、華北聯網工程和西南能源基地建設的研究,主要圍繞西部規模、時序、可能外送的能、流向,以及其經濟合理性和技術可行性展