  1. The government took the advantage of the rich water resources and favorable terrain of guangxi to renovate the lingqu cannel, xiangsidi, ponds and barrages, thus bringing water conservancy construction of guangxi to a climax

    明清政府充分利用廣西豐富的資源和有利的地形,對靈渠、相思棣、陂、堰等進行多方面的修整,使廣西的利建設達到一個高峰期。
  2. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢江河口,動力強勁,破壞力極大.回顧錢江河口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢江河口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代」和丁頭保護等工程措施.分析錢江河口大規模治江圍塗后對錢江河口潮汐、洪位、河床以及杭州灣北岸深槽的影響
  3. The small pond, thickly covered with green slime, was visibly half a yard higher and overflowing the dam, because it was full of white, naked human bodies, with brick - red hands and heads and necks, all plunging about in it

    這個不大的長有綠色植物的池,渾濁的池已經漲高了半尺多,漫過了堤。因為池泡滿了,赤裸裸的士兵他們在池中打撲騰的手臂,臉龐和脖頸像紅磚一樣,而他們的軀體卻是雪白的。
  4. The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper

    本文首次系統地對高拱身泄洪孔口、泄流過程以及的布置優化問題進行了討論。主要內容和成果有1
  5. Abstract : through study on energy dissipation of goupitang project on the wu - jiang river, the velocity field in the water cushion pool downstream ski - jump or drop was measured by hot - film anemometers on a fine model with scale 1 380

    文摘:結合烏江構皮灘利樞紐工程消能問題研究,用熱膜流速儀在比尺為1 380的精細模型上量測了拱挑跌流在內的流速場,並由試驗成果分析了淹沒射流在內的消能過程,計算了消能率。
  6. To design the water cushion of baishan arc dam, the design experiment of ertan hydraulic power station, xiao wan hydraulic power station were refereed. through large amount of scientific experiments and theoretical calculation, and the design coefficients of water cushion in domestic and abroad were summarized, then the design layout of the baishan cushion was worked out at last

    本文針對白山拱方案設計,參考國內二灘、小灣等工程設計經驗,通過大量的科學試驗和理論計算,總結國內外的設計參數,最後確定了白山的設計方案。
  7. You can go sightseeing on the dam, or hire a water cycle boat to view the beautiful hill surrounding the reservoir

    您可以在堤上漫步,或租用上單車或小艇,在湖面欣賞的湖光山色。
  8. Through the bacillariophyta ' s algae water sampling, observing and systematically appraising in different water bodies in zhaotong city ' s zhaoyang district ( including yudong reservoir, xinmin, xiaobaipo, and shuitangba ), zhongcheng town of suijiang county and xinghua town of qiaojia county, 12 genera and 72 species of bacillariophyta are determined

    摘要通過昭通市昭陽區(漁洞庫、新民、小白坡、) 、綏江縣中城鎮、巧家縣興華鎮的不同體的硅藻門藻類植物樣的採集、觀察及分類學鑒定,確定了硅藻門12屬73種。
  9. Damage model and numerical simulation for failure process of reinforced concrete free beam

    下游中三種典型流態的數值模擬
  10. Study on plunge pool concrete lining stability for flood dischare of a high arch dam

    高拱襯砌穩定性研究
  11. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深工程運河起自廣東省東莞市橋頭縣,流經司馬、旗嶺、馬灘、廈、竹、沙嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河閘和八級抽站。
  12. Water invasion bursten out during the railway - tunnel construction is usually the mainly problem in constructing or operating, also which brings surface water to exhaustion and pollutes environment or effects ecology, etc. the geleshan tunnel which crosses through guan - yin gorge anticline which trend is near south north, is located between tuanjie village and jingkou village of the shapingba zone, chongqing city, which is belongs to the inducting segment of yu - huai railway. the guan - yin gorge anticline appears to ridge and slot interlacing in land form, and is composed of clastic rock and carbonate rock from jurassic xintiangou group to triassic

    歌樂山隧道位於渝懷線引入段重慶市沙坪區團結村至井口村之間,隧道穿越近南北向的觀音峽背斜,地貌上表現為脊、槽相間,觀音峽背斜由侏羅系新田溝組至三疊系下統碎屑巖和碳酸鹽巖組成,歌樂山頂大部分出露可溶巖地層,地表巖溶發育,有大量泉和暗河出口,並修建有多個中小型庫、大量池井。
  13. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引道,可連接隧道的亞賓尼濾池及配庫,該引道用石及磚砌成,每天可輸700萬加侖; (三)位於亞賓尼渠東部的六個過濾池,該濾系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖,原過濾后,經一條直徑18寸鐵管,流入花園道與寶雲道交界的配庫。
  14. In the bible, the book of revelations says, " i stand at the door and knock. if anyone will open the door, i will come in to him and i will eat with him. " revelations 3 : 20 we push the button and we allow the power and the force of jesus christ to come into our lives and go through our lives and empower us with his spirit and his goodness

    1972年, gamal abdel nassar總統為主持開幕禮,他走進去,按下按鈕,他一按按鈕,就開始流過渦輪機,渦輪機開始轉動,電力開始輸出,埃及蘇丹和鄰近地區都被照亮了,那按鈕並不能製造電力,它只是把能量釋放出來,電力是由里二千億立方碼的製造的,流過,推到渦輪機造成電力,我們跟神的關系也一樣,我們邀請耶穌基督進入我們的人生,這就是按按鈕。
  15. Shortly after the surveying work started the war broke out and the government was forced to halt the project. it was not until after the war in 1947, that the planning of the tai lam chung reservoir re - commenced

    1947年,籌建大欖涌計劃重新開展,草擬的藍圖包括了、輸隧道、輸管、抽站、濾廠、配庫等工程。
  16. The tai tam reservoir was situated higher than the tai tam intermediate reservoir. similarly, the latter was situated higher than the tai tam tuk reservoir. for these reasons, water stored in the tai tam tuk reservoir must be pumped upwards into the foothills of the tai tam valley in order to reach the tunnel portal of the tai tam reservoir, where water would gravitate to the supply system in central

    無論是第一期或第二期的擴建工程,建造都是工程的基礎,而建立抽系統亦是重要一環,因大潭中位比大潭上低,大潭篤更處于較大潭中低的谷地,故大潭篤的存必須依靠抽機,才可運送至大潭的輸隧道,再經由大潭輸送系統,調配至中區濾系統經過濾后,才可供市民飲用。
  17. The plans included the establishment of dams, for the purpose of increasing the reservoir s capacity to 194 million gallons, the construction of pumping stations and the installation of pumping machines

    漆鹹的計劃草案較具體的工程內容包括了興建(使容量增加至1 . 94億加侖) 、抽站及加設抽機,整體工程費用預算為78萬港元。
  18. Abstract : for high arch dams in valleys with the characteristics of high water head, large discharge and large power, the problems of energy dissipation and scour prevention are serious. based on scientific studies, new comprehensive measures are proposed, including dispersion of discharge to waken wallop of the current, and reinforcement of riverbed to enhance the erosion - resistance. the measures can be used to solve the problem of energy dissipation properly. a typical layout scheme has been proposed in which slotted bucket with diversion teeth, double deck with pores, and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious

    文摘:高拱泄洪消能的特點是高落差大,流量大,功率大,位於河谷狹窄地區,泄洪消能與防沖問題突出.經科學研究,採用「分散泄洪,削弱流沖擊力,加固河床,增強河道抗沖能力」的綜合治理措施,較好地解決泄洪消能布置問題.提出了表孔大差動坎加分流齒、雙層多孔、流撞擊、下設聯合消能的典型布置方案,經實踐證明,方案可靠,消能效果好
  19. At about 10. 15 am on september 13, a male body was found drifting in hok tau reservoir near the main dam. police initial examinations on the body revealed that there was no suspicious element surrounding his death but no identity card could be found

    九月十三日上午約十時十五分,警方在鶴藪附近發現一具男性浮屍,經檢驗后證實死因無可疑,但死者身上並沒有任何身份證明文件。
  20. Without beaver dams and the ponds they create, fewer succulents could survive, and these plants are a critical food for grizzly bears when they emerge from hibernation

    缺少了海貍攔起的與池,多肉植物也難以生存,而這些植物是北美灰熊冬眠醒來后的重要食物。
分享友人