水壩發電 的英文怎麼說
中文拼音 [shuǐbàfādiàn]
水壩發電
英文
power generated by the dam-
There will eventually be a total of 12 turbines on the right side of the three gorges dam, which is in the midsection of the yangtze, china ' s longest river
三峽大壩右側未來一共將有12個水輪發電機組。三峽大壩位於中國最長的河流長江的中段。The aswan dam, for example, stopped the nile flooding but deprived egypt of the fertile silt that floods left ? all in return for a giant reservoir of disease which is now so full of silt that it barely generates electricity
比方說,阿斯旺大壩雖然阻擋了尼羅河的洪水但是也奪走了洪水后本能留給埃及的肥沃土壤,而留下來的是一個現在根本不能發電而充滿疾病的巨大的蓄水池。The aswan dam, for example, stopped the nile flooding but depried egypt of the fertile silt that floods left - all in return for a giant reseroir of disease which is now so full of silt that it barely generates electricity
例如,阿斯旺大壩使得尼羅河不再洪水泛濫,但是它也奪去了埃及以前所享有的洪水留下的肥沃淤泥- -這些換宋的就是這么個疾病滋生的水庫,現在這個水庫積滿了淤泥,幾乎不能發電了。The aswan dam, for example, sto ed the nile flooding but deprived egypt of the fertile silt that floods left - all in return for a giant reservoir of disease which is now so full of silt that it barely generates electricity
例如,阿斯旺大壩使得尼羅河不再洪水泛濫,但是它也奪去了埃及以前所享有的洪水留下的肥沃淤泥- -這些換宋的就是這么個疾病滋生的水庫,現在這個水庫積滿了淤泥,幾乎不能發電了。The aswan dam, for example, stopped the nile flooding but deprived egypt of the fertile silt that floods left - all in return for a giant reservoir of disease which is now so full of silt that it barely generates electricity
例如,阿斯旺大壩使得尼羅河不再洪水泛濫,但是它也奪去了埃及以前所享有的洪水留下的肥沃淤泥- -這些換宋的就是這么個疾病滋生的水庫,現在這個水庫積滿了淤泥,幾乎不能發電了。The aswan dam, for gwymple, stopped the nile flooding but deprived egypt of the fertile silt that floods left - all in return for a giant reservoir of disease which is now so full of silt that it barely generates electricity
例如,阿斯旺大壩使得尼羅河不再洪水泛濫,但是它也奪去了埃及以前所享有的洪水留下的肥沃淤泥- -這些換宋的就是這么個疾病滋生的水庫,現在這個水庫積滿了淤泥,幾乎不能發電了。Iran is building 88 dams for agriculture, hydro - electric power generation and drinking water
伊朗正在興建88座水壩,提供灌溉、水力發電和飲水之用。Water power schemes(hydro-electric schemes)are of two types, high dams or low dams.
水力發電工程(水電工程)有高壩和低壩兩種類型。Water power schemes (hydroelectric schemes) are of two types, high dams and low dams.
水力發電工程(水電工程)有高壩和低壩兩種類型。To stand on the three gorge dam, you could see at plate force of unequal than any other hydraupower plant on earth
站在三峽大壩頂上,你看到的是地球上最壯觀的水力發電站。As the largest hydroelectric plant in the world, its 26 turbines will generate enough electricity to power 28 cities of 1m people each
三峽水壩是當今世界最大的水利發電站(計劃到2008年時,每年發電量會達到8 , 470億千瓦) 。站內的26座渦輪可以給28座人口多達百萬的大城市供應充足的電力。In general speaking, this paper has deeply researched the unit increasing capacity for improving hydraulic power utilization of our country, and this paper is a guide for unit increasing capacity working of gezhouba hydroelectric power plant and other hydroelecrtic plants
總之,本文立足水電事業的發展,為提高我國水力發電機組水能利用率,對機組增容改造進行了深入的研究,對葛洲壩電站機組增容改造和其它水電站的機組改造工作具有指導作用。Based on the actual condition of gezhouba hydroeletric power plant, this paper points out the basic way for unit increasing capacity rebuilding of this plant after serious analysis and site review of lots of information of unit increasing capacity of hydroelectric unit at home and abroad. for this rerebuilding plan, we have made a lot of experiment and analyzed the data, the result show that the unit increasing capacity is necessary and feasible in this plant, additional, this paper describes project management, organization struture, management method, and evaluates this project value
本文對國內外眾多水電機組增容改造資料進行了認真研究和實地考察;通過對水力發電機組增容改造技術的研究,結合葛洲壩電站實際情況提出了葛洲壩電站機組增容改造的基本途徑;針對葛洲壩電站機組改造方案,進行了大量的試驗,認真分析了試驗數據,用試驗結果充分證明了葛洲壩電站機組增容改造的必要性和可行性;本文還就該工程項目管理的必要性、組織結構、管理方法進行了闡述,並對該項目進行了項目評估。At last, the rotor - bearing system of a franics hydraulic generator set of the 3rd machine in the nanya river yaoheba factory is used as an example, calculating result and discussion are given by integrating matlab compute and simulation language
最後以南椏河姚河壩水電廠3f水輪發電機組為例,結合matlab模擬計算語言,給出了計算結果並進行了討論。Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。All kinds of special pipes and conduits ( ditches ), ash storage sites, wells, pumping stations, water cooling towers, oil depots, dikes and dams, railways, roads, bridges, docks, fuel loading and unloading equipment, lightening arresters, fire - fighting equipment and other related ancillary equipment outside power plants and power transformation stations
(三) 、水力發電廠使用的水庫、大壩、取水口、引水隧洞(含支洞口) 、引水渠道、調壓井(塔) 、露天高壓管道、廠房、尾水渠、廠房與大壩間的通訊設施及附屬設施。Reservoirs, dams, water inlet, water diversion tunnels ( including branch tunnels, water diversion canals, voltage adjustment wells ( towers ), open - air high - voltage conduits, premises, water discharge canals, communications facilities between premises and dams and other related ancillary equipment used by hydropower stations
(三) 、水力發電廠使用的水庫、大壩、取水口、引水隧洞(含支洞口) 、引水渠道、調壓井(塔) 、露天高壓管道、廠房、尾水渠、廠房與大壩間的通訊設施及附屬設施。Beijing - chinese engineers tuesday blew up a temporary barrier used during construction of the three gorges dam, unleashing the full force of the yangtze river upon the world ' s largest hydroelectric project
周二中國工程師爆破拆除三峽大壩建設工程的臨時圍堰,世界最大的水力發電工程三峽大壩開始接納全部長江江流。Chinese state media report that the first turbine generator on the right bank of china ' s three gorges dam has begun sending electricity to the state power grid
中國官方媒體報導說,中國三峽大壩右岸電站首臺水輪發電機組開始向國家電網輸送電力。分享友人