水工試驗 的英文怎麼說
中文拼音 [shuǐgōngshìyàn]
水工試驗
英文
hydraulic test水工試驗裝置 hydraulic testing equipment- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 試 : 名詞(古代占卜用的器具) astrolabe
- 驗 : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
- 水工 : irrigation works; water conservancy project水工結構 hydro structure; 水工模擬 hydraulic analogue;...
- 試驗 : trial; experiment; test
-
I am shipping and marine project major there are a few problems to did not figure out in study recently the hand that hopes professional personage can extend aid 1, in hydraulic experiment, the cabin of photograph adjacent why cannot at the same time affusion
我是船舶與海洋工程專業的最近在學習中有幾個問題沒有弄明白希望專業人士能夠伸出援助之手1 ,水壓試驗中,相鄰的船艙為什麼不能同時注水Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers
由於三峽工程水輪機技術上的復雜性和挑戰性,在左岸電站14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:水輪機設計水頭的確定,負傾角葉片水輪機的應用,兩套水力設計,舍棄初期轉輪,蝸殼進行水壓試驗等。It looks upon water resistant as load, simulate every instance of locomotive running and check its every parameter automatically, then collect and dispose these data of parameters, calculate the power of simulating running of locomotive, which is based on the current, and voltage of host dynamotor. afterward, it can be judged from the working state of locomotive. through experiment and adjust each parameter, it can provide important warrant to the components of locomotive whether they can work normally and credibly
即以水阻作為負載,模擬機車運行,對機車的主發電動機的電流、電壓和柴油機的轉速等參數進行檢測,並對檢測結果進行處理,計算出模擬機車運行時的功率,並以此為依據,對機車的工作狀念進行判斷,通過水阻試驗,調整有關參數,使機車運行時能發揮所要求的功率和滿足規定的工作特性。2 ) lab experiment of gac : to find the suitable granual activated carbon to treat the slightiy polluted xiang rivel 3 ) production experiment : make use of the dates acquired from lab experiment and jar test to run the model water plant. by contrasting two series of treating processes, the effect of " improving gac performance by optimized coagulatiod " was investigated
3 )中試:將小試試驗中所獲得的試驗參數帶入模型水廠試驗裝置中進行運行,通過兩種工藝的對比,對「強化混凝與活性炭吸附技術聯用」工藝處理湘江微污染源水的處理效果進行考察。Consolidated drained triaxial compressure test
室內土工試驗壓密排水三軸壓縮試驗Consolidated drained triaxial test
室內土工試驗固結排水試驗High speed cutting, water jet machining and laser machining technology are applied to kevlar fiber reinforced resin matrix composites and special kind rubber materials. valuable conclusions are obtained by experimenting investigation in chapter 8
論文在第八章還進行了凱芙拉纖維增強聚合物基復合材料、特種橡膠材料的高壓水射流、激光和高速切削加工試驗研究,取得了有參考價值的結論。The following conclusions are gained : ( 1 ) the located shear band prongs the ligament near the top crack tip and the structure may occur shear - mode fracture at the angle of 155 ? to crack when load is 87. 92mpa ; the mode of fracture of the flange joint structure is not possible to be void - mode ; ( 2 ) it is proved that loading and then unloading repeatedly can not increase the possibility of invalidation of the structure when the times of loading and unloading are not too more when load is operating pressure ; the structure is safe when the vessel is operating ; ( 3 ) in the fe model of the thesis, not considering the influence of water pressure test which is in the process of fabrication of vessel in fe results in larger deviation in analysi
得出了以下結論:在8792mpa的載荷下筒體一封頭連接結構處的集中剪切帶貫穿韌帶,可能發生沿與原裂紋線成155 「角方向剪切型斷裂;筒體一封頭連接結構不可能發生韌窩型斷裂; ( 2 )在工作壓力下進行次數不多的反復加、卸載,結構不會破壞,也不會喪失安定性:結構在工作狀態下是安全的; m在本文的彈塑性有限元模擬計算中,對于裂紋尖端進行力學分析時,不考慮壓力容器製造過程中水壓試驗的影響,將導致計算結果出現較大的偏差; ( 4 )筒體完全屈服時的載荷為92石3mpa ,封頭完全屈服時載荷為86Pore pressure dissipation test
室內土工試驗孔隙水壓力消散試驗By the prove of experiment, the system is reliable, stable and easy to use. it can fulfill the request of the experiment and resulted a good effect in the experiment
試驗使用表明,該系統工作穩定可靠,使用操作方便,能夠滿足超空泡水洞試驗研究的要求,並在試驗中取得了較好的效果。Based on in - situ investigation, indoors soil tests, data process and calculation analysis for chunhua reservoir, this article acquires the distributing regulation and physical & mechanical properties for each layer soil below the dam base, and further determines typical model cross sections for static & dynamic stress deformation analysis
本文根據對純化水庫進行的現場勘察、室內土工試驗、室內資料處理、計算、分析獲得了壩基以下各土層的分佈規律及物理、力學性質指標,進而確定靜、動應力變形分析的典型斷面。Masonry cement - test methods
砌磚工程用水泥.試驗方法The fabricating procedure and quality control for thread lock heat exchanger were introduced. the quality of heat exchanger is satisfactory
摘要主要論述了螺紋鎖緊環式換熱器的製造工藝及質量控制方法,按此工藝和控制方法製造的換熱器質量優良,水壓試驗一次成功。In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material
本文首先根據散拋石壩損毀情況的現場調查資料,結合有關專家多年的整治經驗,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石壩的直接損毀現象,結合山區河流的水流、地形特點,利用塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變坡水槽試驗,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂水深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護底等,結果表明對于山區河流,試圖僅僅通過增加壩體單個塊體重量或斷面尺寸來提高壩體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性混凝土鉸鏈體等一類整體性較好的護面層作為散拋石壩的防沖毀措施,以期取得良好的工程效果。Abstract : the paper introduces the principle of the water pressure experiment ma chine , analyses the hardware composition and software flow diagram , the operatin g results are fully approved
文摘:介紹了水壓試驗機的工作原理,分析了其控制系統的硬體組成、軟體流程圖,對運行結果作了充分肯定。Abstract : taking the hydrostatic tester located on no. 3 production line of steel tube body of steel tube branch company, baosteel group corporation, shanghai as an example, operation principle of the demag hydrtesting machine is introduced, and analysis of comprehensive faults of the machine carried out, based on which correelive actions are proposed
文摘:以上海寶鋼集團公司鋼管分公司鋼管管體3號水壓試驗機為例,介紹了demag水壓機的工作原理,並就其綜合故障進行了剖析,進而提出了解決的方案。" field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir
「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。Pressure test of through out pigging : inspect pipe deformation and construction quality. exhaust before water pressure test, drainage before manufacture, dryness and medium isolation
總通清管試壓:檢測管線變形、施工質量。水壓試驗前排氣、生產前排水、乾燥、介質隔離。Therefore, it is suggested that the methods of testing code should be modified and normalized so that the reliability of the experimental parameters could be improved
為統一試驗方法和提高試驗參數的可用性,建議修訂土工試驗標準中規定的三軸不固結不排水剪試驗方法。A series of hydraulic model experiments of water flow, head losses and flow state in reservoir under various conditions are carried out for the design of the dashuzi pumped - storage plant
摘要本文結合大樹子抽水蓄能水電站下庫進出水口試驗任務,對側式短進出水口在不同工況下的流速分佈、水頭損失、庫區流態等水流特性進行了水力模型試驗研究。分享友人