水庫實時調度 的英文怎麼說

中文拼音 [shuǐshíshídiào]
水庫實時調度 英文
real-time reservoir scheduling
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (內部完全填滿 沒有空隙) solid 2 (真實; 實在) true; real; honest Ⅱ名詞1 (實際; 事實...
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 調度 : 1 (調遣) dispatch (trains buses etc ) 2 (調度員) dispatcher 3 (安排) manage; control 4 (...
  1. Taking the biliuhe reservoir as an example, the determination process of satisfied flood operation mode is systematically illustrated in this paper

    隨后以碧流河為例,詳細闡述了防洪分類預報調規則的確定過程,並給出了防洪預報調的流程。
  2. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽區特殊的地質環境與工程際情況,在充分考慮岸滑體穩定性影響的前提下,提出了一個適用於長江三峽岸滑坡體穩定性分析的綜合分析評價體系,並取得了如下幾個方面具有工程際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下位升高降低了滑坡體的有效應力,另一方面是由於地下的長期浸泡降低滑體及滑帶的力學強,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對三峽區的特殊條件,系統分析了作用於三峽區滑坡體上的力系和位在175m與145m間變化滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m位、地震以及位由175m調節下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用荷載的計算方法,使在區岸坡滑體穩定性分析評價對計算工況選擇及其作用荷載的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於重慶市豐都縣名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對三峽區的滑坡穩定性分析是用可行的。
  3. When to realize the elementary goal of the reservoir regulation, the concept of " firm capacity " is used in the diagram, while to realize the higher goal, the " base capacity " is used

    調的初級目標調圖中使用的是「保證出力」的概念;而為調的高級目標調圖中使用的是「基礎出力」的概念。
  4. The load, water, and power dispatching system model based on real - time information system sis for tianhuangping pumped - storage power station is introduced in the aspects of system design, development, and debugging

    摘要就天荒坪抽蓄能電站基於信息系統sis平臺的負荷、調、電量系統模型的設計、建立、開發和調試工作進行了說明和介紹。
  5. The planners with their experience pertain to reservoir flood operations, regulate the design hydrographs of different weather systems and herewith establish satisfied flood operation rules with classified forecasts for better reservoir real - time operation

    結合調經驗,調設計人員通過分別調節不同天氣系統成因的設計洪過程,建立滿意的防洪分類預報調規則,用來更好地指導水庫實時調度
  6. This paper describes a series of preliminary results in combination with actual situations of hydropower development in dadu river by means of establishing river basin water rainfall regime monitoring network, carrying out multi - link large system comprehensive dispatching study of water, electricity and network in group reservoirs, conducting the control mode study of cascade hydropower stations, power supply range and development lime sequence, planning environmental impact assessment in a river basin, as well as the dispatching patching of gongzui, tongjiezi cascade hydropower stations

    大渡河流域電開發有限公司結合流域電開發際,通過建立流域雨情監測網,開展群、電、網多環節的大系統綜合調研究,流域梯級電站控制模式研究、流域供電范圍及開發序研究,流域規劃環境影響評價研究,以及龔嘴、銅街子電站梯級調踐,在流域梯級電站統一調研究方面已取得了初步的成果。
  7. The designing of the auxiliary and decision making software for the reservoir ' s optimizing regulation will given some profitable help to the management of the reservoir, solve the problem of having great data and complicated algorithm in hydrology, improve the benefits of the reservoir having comprehensive utilization in optimal operation. this provides important theoretical and practical benefits to carrying out the strategy of the water resource ' s sustainable utilization

    興利調輔助決策軟體的開發為管理工作提供了有益的幫助,解決了手工計算文數據龐大、數學計算復雜的難題;並且可為調決策提供多種數學模型對比,對於資源可持續利用戰略的施具有重要的意義。
  8. In order to analyze side flow of one dimension river flow, the iterative method that comes from control equation system is introduced and applied to the project examples. the results show this method is practicable and is important role in flood control system computation. this method could apply to the inflow computation on large reservoir prevent and control flood

    對于旁側入流反分析,採用直接從控制方程出發,推導出同求解旁側入流的迭代方法,從正問題解的反求,以及的反求等例都說明,本文的方法是一種用的方法,該方法對防洪調演算具有重要的價值,可以應用於大中型調的入流反算。
  9. During the real - time operation of reservoirs, the limit water level is such an important and sensitive index that it directly affects how to reasonably mitigate the contradiction between flood control and benefits of reservoirs

    水庫實時調度過程中,汛限位是一十分重要、敏感的指標,它直接影響著合理解決防洪與興利之間的矛盾。
  10. The limiting level during flood season in real - time reservoir dispatching is such an important and sensitive index that it affects directly how to solve reasonably the contradiction between reservoir ' s flood - control and it ' s benefit

    水庫實時調度過程中,汛限位是一十分重要、敏感的指標,它直接影響著合理解決防洪與興利之間的矛盾。
  11. With the increasing amount of data of time series in hydrological databases, it is very important in f100d forecasting and f100d dispatching to study the methods of retrieving similarity and then find the rules and tendencies contained in the hydrological time series

    文數據中存在大量間序列數據,發現間序列中蘊藏的規律,有利於掌握文數據變化規律和趨勢,在洪預報、防洪調方面有重要的現意義。
  12. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽電站的建設,以電站建設期施工渡汛為研究重點,從施出發,分析黃河上游氣候特性和梯級群的際運行狀況,對施工渡汛中的主要問題?洪流達間、區間洪預報、渡汛風險、汛期預警、龍羊峽在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於際的區間洪預報方案和調方法,為公伯峽電站施工期建設提供技術支撐。
  13. The system possesses the real time correcting function, which can avoid error accumulation and highly increase the forecasting accuracy ; ( 3 ) the flood control system can be multiple - scheme designed, that is, the control schemes can be designed in terms of different control ways for hydro - projects. simulated computation can be carried out to obtain multiple schemes that can be used by the leaders for decision making after risk and consequences estimation, so as to scientifically enhance th

    系統具有校正功能,可以避免誤差累積,極大地提高了預報精; ( 3 )防洪調系統可以進行多方案設計,即可以根據工建築物不同的調方式來設計調方案,並進行模擬調計算,最終生成多個方案,供領導決策,提高了防洪決策的科學性; ( 4 )系統採用的數據均建立在雨情、情、工情和天氣預報等數據基礎上,預報、調均能做到快速及
  14. To prevent flood, adopting non - project measures is feasible and efficient marching measures in recent years in most of counties, adequately utilizing modern science and technology such as computer, information processing, net and communication, system emulation, artificial intelligence and so on to build system that can automatically survey and forecast water information, now plays a important role in grasping the information of rainfall, water and project, in making and selecting preliminary draft of flood control and dispatch, which can greatly raises the efficiency and flexibility of flood control, and has important realistic significance and social economic benefits in minimizing flood disaster

    充分利用現代科學技術,如計算機、信息處理、網路和通訊、系統模擬、人工智慧等技術,建立情自動測報系統,對雨、、工情的掌握,防洪調預案的制定、選擇和施都有重要的使用價值,可以大大提高防洪工程措施的防洪效能和防汛調的靈活性,對減少洪災害具有重要的現意義和社會經濟效益。鬱江洪預報與調系統內容豐富,主要有: 1 、系統設計; 2 、系統洪預報模型; 3 、系統校正模型; 4 、系統河道洪演進模型; 5 、系統調模型。
  15. According to the flood dispatching rules of shiquan reservoir, coordinated with the open - close program of the gates, the flood operation rules model is designed and developed, thus guiding the operation of the reservoir. ( 5 ) the study and development of real - time flood dispatching

    根據石泉調洪規則並結合閘門啟閉程序開發設計調洪規則模型,以此指導運行; ( 5 )洪調系統的研究與開發。
  16. Combining with case study, the application conditions of hydrologic meteorology forecast information and flood forecast information in dynamic control of the limit water level during flood seasons are also illustrated. ( 3 ) in order to relieve the contradiction between water discharge in flood seasons and water shortage after flood seasons, the manner of flood operation with fixed limited water level during fixed time should be adjusted

    ( 3 )為改變汛期棄而汛后又缺的矛盾局面,調整現行固定間固定汛限位的調方式,利用短期氣象預報和洪預報信息,在不改變現有防洪標準的前提下研究防洪預報調方式,現防洪與興利效益的轉換,提高洪資源的利用率。
  17. At the basis of analyzing the present situation of flood system and the necessity of system building, combining with the principle of uniting theory with practice, and from the angle of exploiting and utilizing water resources as well flood control and drought resistance, as a essay of a postgraduate, this article places stress upon researching and probing into following aspects : 1. real - time flood forecasting and reservoir operation system design

    筆者參與了系統總體框架設計,結合鬱江流域際情況,對南寧以上流域產匯流規律進行了研究,重點解決了該流域洪預報模型參數的率定、校正模型的選用及洪預報、校正和調等模塊耦合中的主要技術問題。
  18. The reasons of wreckage of the reservoir are as follows : the inadequate, inefficient and outdated information about the reservoir, the lower anti - flood standard and the supervisor ' s ignorance of the reduction of reservoir capacity owing the a accumulated soils over years. so setting up the 3d model of danjiangkou reservoir : and mastering relevant information on water resources matter significantly not only to the dispatch and regulation of danjiangkou reservoir, but also to the forthcoming project of " water in the south to the north "

    失事的原因多為:文資料不足和未及掌握有關的文資料,信息滯后,選用的防洪標準偏低;運行多年,內泥沙淤積使有效容大幅減少而管理者對此又未及掌握等。可見建立丹江口三維模型,及掌握有關文資料,不僅對丹江口調和管理,而且對即將施的南調都有著深遠的意義。
分享友人