水庫淤積測量 的英文怎麼說

中文拼音 [shuǐliáng]
水庫淤積測量 英文
reservoir sedimentation survey
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (淤積) become silted up 2 (血液不流通) (of blood) stagnateⅡ名詞(淤積的泥沙) silt Ⅲ...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 淤積 : silting-up; deposit; sedimentation
  • 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
  1. According to the fact of the engineering, the optimal modeling when fenhe first reservoir operated alone are first made. after getting the regularity, in order to consider fenhe second reservoir that had been finished essentially and shanxi wanjiazhai yellow river diversion project, not only the object of minimum water shortage for satisfying the water use demanded mainly by user are founded, but also the object of minimum the reservoir deposition was found. in order to prevent the water use demanded by city and industry from excessively concentrated water shortage, the object of minimum water shortage required to be the equable shortage

    本文在對來分析基礎上,對太原市需的用進行了預,結合工程實際,先對汾河一單獨運行時進行優化模擬,得出規律后,考慮已基本完工的汾河二及引黃南干工程,建立了以滿足用戶用為主要目標的「缺最小」目標和減少的「」最小的目標,其中「缺」最小目標要求是均勻的短缺,避免過分集中而影響了城市及工農業用
  2. The comparison between the experimental data with numerical simulation show that the model have a higher precision in the lateral scouring and sedimentation deformation, time interval quantity of deposition, and output sediment concentration process during sand peak at various cross section and is applied fairly good to practical engineering

    青銅峽的實資料對模型驗證結果表明:模型在不同斷面橫向沖變形、時段、沙峰期出含沙過程都具有較高的精度,能較好地運用於工程實際。
分享友人