水庫溢洪道 的英文怎麼說

中文拼音 [shuǐhóngdào]
水庫溢洪道 英文
bottleneck road
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞(充滿而流出來) overflow; spill Ⅱ形容詞(過分) excessive
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  1. Hydraulic model test of spillway in baiyinhua reservoir

    白音花水庫溢洪道工模型試驗研究
  2. Design of spillway in quting reservoir

    曲亭水庫溢洪道工程設計
  3. The improvement plan for the right bank revetment of the first - step stilling basin for the normal spillway of huangbizhuang reservoir is optimized for many times, which has met the requirements to save the investment, shorten the construction period, guarantee the continuity of the boundary and satisfy the operation of the project at last

    摘要黃壁莊正常一級消力池右岸躺坡改建方案經過多次優化,達到了節約投資、縮短工程工期,保證了邊界的連續性,滿足工程運用要求。
  4. Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection

    並以萬縣魚背山岸邊為例,計算了上所受的流荷載及其分佈,為土石壩坡和護面的穩定分析提供了依據。通過計算證實了既使在較大的單寬流量下,緩坡上的階梯仍有較高的消能率。
  5. For floors where abrasion and impact resistance as well as dust - proof are required such as for shed, loading area at port, machinery industry, aitcraft parking apron, garage, parking area, oil storage piant, pathway floor, mine chute, bridge surface, reservior overflow relief channel, energu consumption. loading slope, military industry, weaving mills, cold storage plant, automobile industry, electronic industry express highway, etc

    、碼頭裝卸區、機械工廠、飛機停機坪、車、停車場、油料、通地面、工礦溜槽、橋面、水庫溢洪道、交通池、裝卸斜坡、軍工企業、紡織業、冷凍房、汽車工業、電子工業、高速公路等適合金屬骨料要求的混凝土地面。
  6. The structure and flow property of the spillway ' s tortuous path are important to the spillway and even the key water control project

    結構與流特性,對乃至樞紐工程都是十分重要的。
  7. The flood resulting from a dam breaking, and opening by break very spillway, and in order to guarantee safe enlarging the outflow of reservoir, spreads quickly and often causes catastrophes

    大壩潰決造成的、以破壞方式開啟非常造成的以及為保證大壩安全加大放流形成的,傳播速度快,破壞性巨大。
  8. Application of water damage and reinforcement for base plate of flood discharge trough in spillway of guanzhuang reservoir

    官莊水庫溢洪道泄槽底板毀原因分析與加固
  9. Thought for reducing cost in the procurement administration processing of the spillway project of guanshan reservoir

    關山水庫溢洪道工程項目采購管理中降低成本的幾點思考
  10. The paper also introduced the applied situation of the actual projects about the t type barrier stilling basin through the helong reservoir spillway ' s hydraulic model experiment

    本文還通過河龍水庫溢洪道工整體模型試檢,描述了t形墩消力池在實際工程中的應用情況。
  11. Slot reservoir spillway steep slope section surface cavitation question brief analysis

    窄口水庫溢洪道陡坡段表面氣蝕問題淺析
  12. Analysis of concrete security check measurement in main spillway of dahuofang reservoir

    大夥房混凝土安全檢測分析
  13. Abstract : the outflow through gate controlled multi - opening spillway of yinhe reservoir was analyzed. the analysis results were checked by the site observed data

    文摘:分析了音河多孔有閘門控制的出流,並用出流的實測資料進行了檢驗。
分享友人