水拱 的英文怎麼說

中文拼音 [shuǐgǒng]
水拱 英文
water bridge
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  1. Bases which carry horizontal load, for example under arches, are usually called abutments.

    承受平荷載的底座,例如底下的底座,一般稱為座。
  2. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲壩,正常蓄位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  3. 1 yingbin blvd, hongmei town, dongguan

    廣東省珠海市灣路
  4. And when the good fathers had reached the appointed place, the house of bernard kiernan and co, limited, 8, 9 and 10 little britain street, wholesale grocers, wine and brandy shippers, licensed for the sale of beer, wine and spirits for consumption on the premises, the celebrant blessed the house and censed the mullioned windows and the groynes and the vaults and the arrises and the capitals and the pediments and the cornices and the engrailed arches and the spires and the cupolas and sprinkled the lintels thereof with blessed water and prayed that god might bless that house as he had blessed the house of abraham and isaac and jacob and make the angels of his light to inhabit therein

    這幾位好神父抵達了指定地點,小布列顛街八九十號的伯納德基爾南股份有限公司的店堂這是食品雜貨批發商,葡萄酒和白蘭地裝運商特準在店內零售啤酒葡萄酒和烈酒。司儀神父祝福了店堂,焚香熏了那裝有直欞的窗戶交叉頂稜柱頭山墻上楣鋸狀門尖頂和圓頂閣,把聖撒在過樑上,祈求天主祝福這座房舍,一如曾經祝福過亞伯拉罕以撒和雅各的房舍那樣,並且讓天主的光明天使們住在裏面。
  5. Clough, r. w., " reservoir interaction effect on the dynamic response of arch dams ", proceedings of us - prc bilateral workshop on earthquake engineering. vol. 1, august, 1982, harbin, china

    張楚漢、王綦正,緊壩動力分析,壩技術(中國壩情報網刊物) , 1985年三期
  6. Brings forward the basic network cell model of symmetrical blast vault and asymmetric blast vault. then studies and analyses airflow in vault of main voltage switchyard hall of xiluodu hydropower station which is far cry and large numbers of airflow conflux, brings forward concept of “ virtual embranchment ” and corresponding basic network cell model, regresses calculate expressions of flux uniformity coefficient and impedance of “ virtual embranchment ” of vault of main voltage switchyard hall of xiluodu hydropower station

    而後又採用cfd數值模擬的方法對溪洛渡電站主變洞排風頂這種多股氣流匯流的長距離通道內的氣流流動進行了分析,提出了「虛擬分支」的概念和相應的網路基元模型,並回歸得到了溪洛渡電站主變洞排風頂各個排風「虛擬分支」風量均勻系數以及阻抗的計算公式。
  7. He advanced several paces towards the point whence the light came, and to all the excitement of his dream succeeded the calmness of reality. he found that he was in a grotto, went towards the opening, and through a kind of fanlight saw a blue sea and an azure sky. the air and water were shining in the beams of the morning sun ; on the shore the sailors were sitting, chatting and laughing ; and at ten yards from them the boat was at anchor, undulating gracefully on the water

    他向光線透進來的那個地方走前幾步,在夢的興奮激動過后,跟著就來了現實的寧靜,發覺自己是在一個巖洞里,他向洞口走去,透過一座形的門廊,他看到一片蔚藍色的海和一片淡青色的天空,空氣和海在清晨的陽光里閃閃發光,手們坐在海灘上,在那兒嘰哩咕嚕地談笑著,離他們十碼遠的地方,靜靜的停著那艘小船。
  8. For jiangpinghe double - curved arch dam, 3 - d elasto - plastic fem is made, in which the point safety factors of the dam - abutments system and the safety margin for coefficients of sliding resistance on 7 potential sliding blocks of the dam before and after the reinforcement of the dam are calculated under the conditions of the normal storage level and the design flood level respectively based on the results from the analysis made with fem

    摘要對江坪河雙曲壩進行了三維彈塑性有限元分析,利用有限元應力成果分別計算了正常蓄位、設計洪位等3種工況下加固前後壩體壩肩系統的點安全系數和7個可能滑動塊體的抗滑富餘系數。
  9. The cat arched its back and then, after a prolonged sniff at the big white beard, the gluey odor of which doubtless disgusted her, she turned and, curling herself up, went to sleep again on the bench beside him

    貓把背得高高的,接著嗅了好一陣子他長長的白鬍子,大概厭惡白鬍子上的膠味,又回到長椅子上,把身子縮成一團睡覺了。
  10. Compared to an ordinary rudder, the value of lift coefficient of ichthyoid rudder is about 30 % higher and the maximum rudder angle of it nearly reaches 45 degrees. ichthyoid rudder is a design under such a conception as to effectively utilize the propellers slipstream for rudder action, and featured by having a fish - shaped one - piece construction that is to say - no part of ichthyoid rudder can move in the water

    其研究的魚形舵是一個沒有在下移動的魚尾形剖面單片結構,增加了全舵的剖面度,使螺旋槳尾流的折射量增強,進而增大了動力的作用,使之比普通流線形舵的升力提高30左右。
  11. Or again, note the meanderings of some purling rill as it babbles on its way, fanned by gentlest zephyrs tho quarrelling with the stony obstacles, to the tumbling waters of neptune s blue domain, mid mossy banks, played on by the glorious sunlight or neath the shadows cast o er its pensive bosom by the overarching leafage of the giants of the forest. what about that, simon ? he asked over the fringe of his newspaper

    「再則,請注意那打著漩渦蜿蜒曲折地嘩嘩淌去的淚淚溪流與攔住去路的巖石搏鬥,在習習西風輕拂下,沖向海神所支配的波濤洶涌的蔚藍領國;沿途,面上蕩漾著燦爛的陽光,兩邊的堤岸爬滿青苔,森林中的巨樹那架成形的繁葉48 ,將蔭影投射于溪流那憂郁多思的胸脯上。
  12. On display are two historically significant monuments : the napier column from the hong kong cemetery and the fountain arch originally erected in possession point

    展出了極具歷史意義的律勞卑紀念石柱及原立於坑口的噴泉圓
  13. Riprap protection for dam slope on the upstream of daguangba earth dam

    梅村庫砌石壩防滲加固設計
  14. Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel

    特大跨超淺埋隧道部結構過于扁平,開挖后發生二次應力分佈,腳處的應力過大,要求有較大的地基承載力,腳開挖時必須採用光面爆破,保證圍巖的完整性和不受擾動,開挖后及時封閉,防止該處積軟化圍巖。
  15. Three - dimensional finite element analysis of spandrel groove high slope stability of xiluodu hydropower station in jinsha river, china

    溪洛渡電站肩槽高邊坡穩定性的三維有限元分析
  16. Standard practice for structural design of corrugated aluminum pipe, pipe - arches, and arches for culverts, storm sewers, and other buried conduits

    涵洞排和其它地下管道用波紋鋁管管結構設計的標準實施規程
  17. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋頂面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方面看,在風荷載、地震作用下,肋基本滿足要求,個別排架橫梁不滿足要求,肋連系梁普遍不滿足要求;計入平橫槽向地震作用的工況為設計控制工況。
  18. Experimental research on uplift force acted on a piece of floor of arch invert water cushion pool and estimation to limit thrust load at skewbacks

    墊塘底板塊上舉力變化規律的試驗研究
  19. The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper

    本文首次系統地對高壩壩身泄洪孔口、泄流過程以及壩下墊塘的布置優化問題進行了討論。主要內容和成果有1
  20. Abstract : through study on energy dissipation of goupitang project on the wu - jiang river, the velocity field in the water cushion pool downstream ski - jump or drop was measured by hot - film anemometers on a fine model with scale 1 380

    文摘:結合烏江構皮灘利樞紐工程消能問題研究,用熱膜流速儀在比尺為1 380的精細模型上量測了壩挑跌流在墊塘內的流速場,並由試驗成果分析了淹沒射流在墊塘內的消能過程,計算了消能率。
分享友人