水滑道 的英文怎麼說

中文拼音 [shuǐdào]
水滑道 英文
water slide
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (光滑; 滑溜) slippery; smooth 2 (油滑; 狡詐) cunning; crafty; slippery Ⅱ動詞(貼著物...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  1. The theoretic of calculate the react force act on the launching way also be investigated

    對74500噸散貨船下時的反力進行了實船計算。
  2. In order to resolve the strength problem of 74500dwt bulk carrier on launching way, two aspects of problem are investigated in this report : 1 ) the analysis and calculation of the force act on the hull and the launching way when ship launching ; 2 ) the strength analysis and calculation of bottom structure in forward area during ship launching

    為了解決74500噸散貨船下時船體結構的強度問題,本文主要對兩方面的內容進行了研究: 1 )船舶縱向下時的受力分析和反力計算: 2 )艉浮時艏部區域底部結構強度分析計算。
  3. Installed in the water - world are several sets for water - sports, such as high - platform speed - changing slide, rocking slide, 45 sliding - board and massaging pond, etc

    上時間里設有數組上游樂項目,其中有高臺變速、搖滾、 45奔流沖浪板,還有按摩池等項目。
  4. At present, more and more large tonnage ships are built with the development of ship industry, the force between hull and shipway increased, the damage of ship structure was also reported. but the existed method is not efficiently for calculating the distribution of force acted on forward during stern floating which is the moment of truth during ship launching, so it is important to calculate ship launching precisely and take measure to preclude such accident

    目前隨著船舶工業的發展,建造船舶噸位越來越大,船體所受反力隨之增大,在實際生產過程中已有船體局部結構不同程度損壞的報,而現有的下計算方法在下的最危險時刻艉浮時反力的分佈情況方面的計算顯得不夠準確,如何準確進行計算並採取相應的措施來防止這類問題發生顯得十分重要。
  5. In 1928, a concrete slipway was built for seaplanes using kowloon bay

    一九二八年,一條混凝土下水滑道建成,供在九龍灣升降的上飛機使用。
  6. Lama exper in evaluation, planning, edsign, environmental appraise, engineering cost, inspection and relative scientific research subject advisory of haror, wharf, breakwater, and slipway project in prot and waterway engineering

    擅長對運工程中的港口、碼頭、防波堤、船臺、等工程項目的評估、規劃、設計、環境評價、工程造價、監理及有關科研課題的咨詢。
  7. Optional parts include swivel. rotary hose, elevator link, hydraulic tong, air spiders, lelly bushivg, rotarytable and substructure ( with ramp and oadder ) etc

    選配件包括龍頭和龍帶、吊環、液壓大鉗、氣動卡盤、轉盤、鉆臺(帶和梯子)等。
  8. A civil airport in the county town is undertaking. the geothermal energy resouces have been utilized properly. a hot spring plaza has set up in the town, where vistors can enjoy the perfect facilities and services

    連城東鄰永安南接巖,兩條平坦如砥的國穿行境內連城民用機場已在籌建之中豐富的地熱資源得到開發利用, 「溫泉洗凝脂」 ,坐落在城區的溫泉大廈,設施完善,為遊人提供優質服務。
  9. Water slides of 2 m height and more - part 2 : instructions

    高於2米和超過2米的水滑道.第2部分:說明書
  10. Water slides over 2 m height - safety requirements and test methods

    高度在2m以上的水滑道.安全性要求和試驗方法
  11. Water slides of 2 m height and more - part 2 : instructions ; german version en 1069 - 2 : 1999

    2米高及以上的水滑道.第2部分:說明
  12. Water slides over 2 m height and more - part 1 : safety requirements and test methods

    高於2米和超過2米的水滑道.第1部分:安全要求和試驗方法
  13. Standard practice for classification, design, manufacture, construction, and operation of water slide systems

    水滑道的分類設計製造結構和使用的標準實施規程
  14. Water slides of 2 m height and more - part 1 : safety requirements and test methods ; german version en 1069 - 1 : 2000

    2米或大於2米高的水滑道.第1部分:安全要求和試驗方法
  15. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  16. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  17. A flap vlave used in pumping station is a kind of hydraulic - operated automatic gate, which is similar to a hinged check vaive. because of their simple structure and reliability, being able to shorten the length of outlet passage and facilitate the starting of pumping system in comparison with siphonic vacuum - distroied cutoff scheme. so it is propitious to be used and save investment but at the same time, flap valves always show some disadvantage

    因拍門簡單、可靠,與虹吸真空破壞截流閉鎖方式相比,可以縮短出(流)長度,並利於泵系統起動,與快速閘門相比,拍門也有諸多優點,閘門門體易關閉不到位或卡住不能活動,因為門槽和?塊較軸孔容易殘留異物,閘門門體克服動阻力不僅無機械增益,且阻力和動力不在一直線上,門體易傾斜而自鎖,而拍門的工作可靠性則遠高於快速閘門。
  18. In recent years, because of building road and water pipe, the slide is coming back to life partially

    近年來,由於在坡體上修建公路和輸。致使該坡局部復活,成災危險性很大。
  19. A round trip to the various sights only takes some 20 minutes by the newly built cableway and ski tracks

    景區內亦設有索,以便遊人欣賞四山一的自然風光,往返一次只需20分鐘。
  20. In view of the technical problems of softening of foundation soil and reduction of bearing capacity of the breakwater under the action of repeated wave loads during the execution of the second phase of the deepwater waterway regulation project in the changjiang estuary, tianjin port construction corporation has successfully developed safer, higher quality and highly efficient technology and special - purpose marine craft and machinery for laying deepwater sand blankets and offshore installation of prefabricated drains, which were more suitable for the working conditions in the changjiang estuary, and has also explored the construction technology for prefabrication of caissons with rubber anti - sliding plates, to ensure the efficient implementation of the engineering measures against softening of foundation soil

    摘要針對長江口深治理二期工程施工過程中遇到的堤身在波浪重復荷載作用下地基土出現軟化、承載力降低的技術難題,第一航務工程局成功開發了適合長江口工況的安全、優質、高效的深砂被鋪設和海上塑料排板打設施工工藝及專用船機設備,探索了一整套帶橡膠阻板的沉箱預制施工工藝,確保了抗軟化工程措施的有效實施。
分享友人