水質站網 的英文怎麼說

中文拼音 [shuǐzhízhànwǎng]
水質站網 英文
water quality network
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (性質; 本質) nature; character; essence 2 (質量) quality 3 (物質) matter; substance;...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : Ⅰ名詞1 (捕魚捉鳥的器具) net 2 (像網的東西) thing which looks like a net 3 (像網一樣的組織或...
  • 水質 : water quality水質保護 [環保] water quality protection; 水質標準 water standard; water quality sta...
  1. Namely : high wear - resisting rubber, screen mesh of polyurethane ( pu ), become the domestic biggest producer specializing in high wear - resisting screen mesh, the practical experience for many years, craft is it develop high - quality to apply, durable new product have all over foot industrial demand modernized polyurethane, becoming can produce the production bases of different high wear - resisting screen mesh at home, whom products can select rubber or polyurethane screen mesh for use at home separately coloured, ferrous metal mine enterprise, power station and building materials sift subsystem use, well received by ore dressing circle from home, this mean square garden screen mesh of our company credit can trust among user

    即:高耐磨橡膠、聚氨酯( pu )篩,成為國內專業生產高耐磨篩的最大廠家,有著多年的實踐經驗,將現代化的聚氨酯工藝應用於開發優、耐用的新產品來滿足工業需求,成為國內能生產各種高耐磨篩的生產基地,產品可以分別選用橡膠或聚氨酯篩在國內的有色、黑色金屬礦山企業、及建材篩分系統使用,受到國內選礦界的好評,這就意味著我公司的方園牌篩在用戶中信用完全可以信賴。
  2. When the foundation and the intake tower are both important analytical objects, and the geological condition of foundation is very complex, the slope is meshed with tetrahedral element, while the intake tower is meshed with hexahedral element

    本文針對百色的地基和進塔均是主要分析對象,而地基的地條件十分復雜,提出了非一致格位移協調解法。地基採用四面體單元和進塔採用六面體單元。
  3. It contains information about the control of noise, water, air and land pollution, also the local environmental protection scheme

    提供噪音、、空氣和廢物污染的管制資訊,以及制訂和實行香港環境保護計劃的資料。
  4. Moreover, that web site do introduces dongjiang raw water, water treatment process, water quality control and its qualitity data

    還介紹了輸港的東江原、濾過程、控制及資料。
  5. In order to direct the water to the forebav of the pump station from the original canal, a channel long 135 m is designed. it crosses through the terrain top with a depth of more than 50 m. soil of the channel slopes is a strongly - weathered silty and sandy mudstone with many well - developed reticular cracks and takes the structural surfaces almost same as the channel slopes

    東深供工程金湖泵位於塘廈鎮東面,屬低山、殘丘地貌,地面高程22 60m ;泵前池進渠橫切山脊,連接原東深供河,設計開挖1條長135m的進渠,坡高50多米,邊坡土為強風化的粉砂泥巖,狀裂隙發育,結構面基本與坡面重合;坡體土中含有較多的粘土礦物,具有遇軟化的特性。
  6. Based on the spectral irradiance measured with the sun - atmosphere ultraviolet spectrum radiometer ( sauvs ) developed by the institute of atmosphere physics and the changchun institute of optics and fine mechanics, chinese academy of sciences, measuring the direct and scatter irradiance spectrum of ultraviolet waveband which arrives in beijing global surface, giving a method of retrieving the aerosol optical depth ( aod ) and put up with primary results that exponential function can fit the retrieval results according to its visibility, putting forth different coefficients and functions on variable visibility, also giving a primary analysis on the aod in dust - storm day and some contrast between sun - day and dust - storm day, analyzing the ratio between scatter and total irradiance, and its relationship with atmosphere mass and total atmosphere optical depth, lastly contrasting with the survey results by aeronet beijing station, the results of retrieval is in reason, this work gives some help in researching the co - effect of aerosol - radiance - climate and makes preparation for further survey on the radiance characteristics of dust

    利用中國科學院大氣物理研究所與長春光學精密機械研究所合作研製的太陽?大氣紫外光譜輻射計( sauvs ) ,測量到達北京地表的太陽直接和散射紫外光譜輻射,導出了大氣氣溶膠的光學厚度。初步結果表明:北京紫外波段大氣氣溶膠的光學厚度在絕大部分情況下隨波長的增加而單調減小,用指數函數可以較好地擬合反演結果,統計得到了三個平能見度狀況下擬合函數的系數值和公式表達式;初步分析了揚沙、浮塵、沙塵暴天氣條件下氣溶膠光學厚度的特點,並與一般晴朗天氣條件下的氣溶膠光學厚度特點做了比較分析;分析了太陽紫外譜輻射中散射輻射與大氣量、大氣總光學厚度的定性關系和定量表達式;最後與全球氣溶膠監測路( aeronet )北京的資料做比對,表明反演結果基本合理。
  7. Then the paper uses the same typical four network operating conditions as the primary given conditions and when adding one set of the parallel capacitor bank, changing the 330 / 220kv transformer tap changer position step by step to change the transformer ration, through this study methods this paper found out all the optimized combination of the tap changer position and the amount of input reactive power, also obtained four sets of the 330kv, 220kv and hokv s / s bus voltage and the active and reactive power losses changing curves. through analyzing the optimized combination control curve and the network power flow, the paper generalizes the rules as following : the chief measure of coordinative control is inputting shunt reactor in chengxian s / s in winter time both in the planning year of 2010 & 2005 ; in summer time in planning year of 2010 the chief measure is to input proper shunt capacitor

    本研究通過分析所獲得的最優綜合控制組合曲線及電潮流,總結出了如下規則:隴南電在2005年及2010年冬大、以及2005年夏小運行方式下,綜合控制應以成縣變投入適量並聯補償電抗器作為主要措施;在2010年夏小運行方式下則投入適量並聯補償電容器作為主要措施,再輔助以選擇合適的主變有載調壓分接頭來調節,達到控制內無功潮流分佈合理、各變電母線電壓在理想的范圍內時電有功損耗最小,從而也提高了電安全運行平及供電量。
  8. Those wishing to have their water samples examined at the twd must follow the correct sampling procedure refer to the twd website - water quality - the high quality of tap water, or contact our customer service center for detailed information to avoid incorrect results or judgments. frequently asked questions on water quality

    自行送樣檢驗者,請務必依正確的采樣方法詳本處-專區-用戶檢驗須知,或洽詢客服中心採集樣,以免檢驗結果失真,導致誤判。
  9. The government website is a government network platform built by the government body employing modern information and telecom technology, through such a platform, the government administration and service are completed by net work technology, and with the help of www, the government structure and its working process are reorganized and improved, free from the confinements of time, space and department separations, thus make the government body can offer the best, normal, transparent administration and service which are also conformed to the international standard to the society totally

    政府是在政府管理現代化理論和實踐中產生和發展起來的。政府就是政府機構應用現代信息和通信技術建成一個政府路平臺,通過路平臺把管理和服務通過路技術進行集成,藉助路實現政府組織結構和工作流程的優化和重組,超越時間、空間和部門分離的限制,全方位地向社會提供優、規范、透明、符合國際準地管理和服務。
  10. 3d nonlinear finite element method, compatible displacement method of different mesh and response spectrum of mode - superposition are used to analyze the intake tower - intake slope static and dynamic interaction, since the complexity of geologic structure. the rational results provide a feasible way for the similar projects analysis in the future

    論文採用三維非線性有限元法、非一致格位移協調解法、振型分解反應譜法對復雜地條件下的百色口邊坡與進塔的相互作用進行了靜、動力分析,得出了一些合理的結論,為今後類似的工程計算分析提供了一種可行的方法。
  11. The web site is a official website of alaska department of environmental conservation, providing a detailed introduction of his divisions, including administration, food safety and sanitation, air quality, oil and hazardous substances, solid waste, water quality. environmental news, hot topics and publications, such as newsletters and reports

    描述:該是美國阿拉斯加州環境保護部的官方提供了各個部門的詳細介紹,包括:食品安全衛生部門;空氣量管理部門;石油與有害物管理部門;固體污染物管理部門及管理部門,同時對各個部門的法律也作了詳細地介紹,內容還包括環境新聞、熱點環境問題討論及機構出版物,如時事通訊,報告等。
  12. The selection of structure type for the straddle monorail and overhead station is decided by the synthetic factors like the perimeter environment, city planning, engineering geology and hydrology geology, underground tube net etc

    摘要對跨坐式單軌高架車結構型式的選擇,需根據其周邊環境、城市規劃、工程地文地條件、地下管等綜合因素確定。
  13. As to the tunnels of jinping hydroelectric power station in sicuan province, the thesis discusses how to reasonably consider the initial stress field when designing a large - scale tunnel with high initial stress and deep buried. first, by analyzing of the rock lab tests and discusses the feature of regional geomorphology. explains the production of initial stress field, analyze the initial stress of jinping hydroelectric power station ; second, using the fem, the paper creates the real model of region. according to the results of stress measurement point, by combining of ann and fem to decide the boundary condition, the paper calculates the initial stress field ; at last, the paper analyzes the influence of the initial stress field formed from different condition on the deformation and stress of the surrounding rock, and the main factor to influence the initial stress. on the basis of the former work, the author proposes some proposals, which will be helpful for studying and designing of the similar undergroun d engineering

    首先從巖體的應力?變形的特性入手,並結合工程區域的地形地貌特徵,對巖體初始地應力場的形成做出解釋,結合錦屏初始地應力的現狀提出了將地應力場進行分帶;然後建立整個工程區的實體模型,在地分析的基礎上,以工程區右半部分為代表,參照實測點的初始地應力值,採用了神經路與有限元相結合的方法反演了該區域的初始地應力場;最後模擬隧洞的開挖,通過計算比較分析了初始地應力場對處于不同應力帶內的隧洞圍巖穩定性的影響,在此基礎上提出了作者的建議,力圖為該類工程的研究設計工作提供有益的幫助。
  14. Comprehensive evaluation on water quality for cascade hydropower stations in supa river basin based on improved bp neural networks model

    神經路模型的蘇帕河流域梯級電綜合評價
  15. Besides these annual reports, information is uploaded onto the epd website monthly which provides recent marine water quality information covering the two key parameters of dissolved oxygen and

    環保署頁除了上載海年報和數據,每月亦上載了最新的海資料,包括十個管制區內有代表性的海監測位的溶解氧及大腸桿菌平。
  16. Consequencely, the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, and the back - analysis and the prediction of the parameters of the dam system have been done according to the operating observed data. the research work involves several aspects as follows : 1 ) a back - analysis model including the prior information and a predictive model of nonlinear time series were established ; 2 ) the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, in which the analysis module of the loading effects, the back - analysis module, the forecasting module of the physical parameters and the assessment module of the operating state were contained ; 3 ) according to the operating observed data, the operating state of the dam was assessed and predicted with the analysis system of the operating state, the results suggested that the dam is in basically normal operation at present

    具體工作有以下幾方面: 1 )收集整理漫灣大壩運行監測資料,並對其進行了系統分析,從觀測資料本身直觀的分析了大壩的運行狀況; 2 )總結位移反分析的理論及方法,建立了考慮先驗信息多介位移反分析模型,基於神經路非線性映射功能,建立了神經路時間序列預測模型; 3 )以ansys軟體為平臺,開發了漫灣砼重力壩運行狀態評價模塊,結合荷載效應分析、參數反演分析、參數預測分析三個模塊組成漫灣砼重力壩運行狀態分析系統;實現了對漫灣運行狀態的動態「反演-預測」分析; 4 )利用漫灣砼重力壩運行狀態分析系統,在漫灣大壩實測資料分析、大壩砼特性參數反分析、大壩砼彈性模量衰變規律及預測分析的基礎上,系統的分析並預測了大壩運行狀態。
  17. Giorgio armani s collection offers seasonal fashion items for men and women

    -從事女性飾品銀晶等各種材批發的
  18. Second, on the basis of studying and analyzing some common water quality models, a new method which use bp - nn is proposed, and related algorithms and simulation results, which use the actual data from the automation monitor station of dong jiang, are given

    預測模型進行了重點研究。在了解、分析一些常規模型的基礎上,提出了用bp神經路進行智能建模的新方法,並結合東江自動監測的實測數據進行了初步的探索,給出了模擬結果。
  19. This information tracks the levels of dissolved oxygen and e. coli at the stations, and is especially useful for those who need to know about water quality at a particular time of year, as for example those taking part in dragonboat races on the shing mun river in sha tin. this information is available at

    環保署的址除登載電子年報外,並載有全港12個主要河溪監測的每月數據,其中包括中溶解氧含量及大腸桿菌平,社會上一些人士例如參加沙田城門河舟競渡的健兒需要了解最新河道的情況可瀏覽址。
  20. Period of water quality survey : jan. 1, 2003 - jun. 30, 2004. further details are available on the twd website water knowledge water quality and direct drinking blocks

    數據統計期間: 92 . 1 . 1 93 . 6 . 30更詳細的資料可至本處知識-專區及生飲專區查詢。
分享友人