水道泥淤 的英文怎麼說

中文拼音 [shuǐdào]
水道泥淤 英文
canal silting
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : Ⅰ動詞1 (淤積) become silted up 2 (血液不流通) (of blood) stagnateⅡ名詞(淤積的泥沙) silt Ⅲ...
  • 水道 : water channel; channel; waterway; watercourse; water carrier; water race; water lane; klong; lago...
  1. The deposition of bed load sediment was greatly reduced in the sump by adding a flushing gallery

    通過在集池底設置排沙廊,較好地解決了推移質積問題。
  2. The deposition of sediment in our natural stream channels has greatly aggravated floodwater damages.

    積在天然河,已大大加劇了洪的危害。
  3. Analysis on flow and sediment movement in approach channels of tidal river branches

    感潮河段船閘下引航沙運動及
  4. Since 1976 it has been made great achievements which has conducted water more than 100 billion m3 and has been an important project of heilongjiang province. but recently the channel has been seriously freezing - melting eroded and sand of cliff edge has been deposited along the channel, which resulted to highten the channel bottom, increase width of the channel and reduce horse road. what all above have affected to apply safely channel so it is necessary to repair comprehensive

    自1976年建成以來,已累計引100多億立方米,取得了巨大的經濟效益,成為黑龍江省西部關繫到國計民生的重點工程,但近年來渠破壞嚴重,凍融侵蝕強烈,邊壁剝蝕下來的沙經渠流搬運沿程發生積,導致渠底抬高,渠寬增加,馬縮小,已經嚴重影響到渠的安全運用,必須進行綜合治理。
  5. It is mainly by analyzing the features of sediment concentration distribution in vertical in this paper, and then the problems of effect of headwork gates on sediment prevention, relation between distribution of sediment deposition in irrigated areas and its treatment and utilization, estimating the influence of withdrawing water and sediment on channel deposition and erosion in lower yellow river, and treatment and utilization of the sediment entered into canals are discussed

    本文主要從分析計算含沙量沿垂線分佈特點,探討渠首防沙的作用,分析灌區積分佈特性與沙處理利用的關系,分析計算引引沙對黃河下遊河影響及入渠沙的處理利用等問題。
  6. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持積狀態,在特定的來來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口沙沉積分配的過程來看:三角洲與濱海區沙的沉積變化趨勢是基本一致的,各部位的沙沉積比例變化基本呈波動狀態,且三角洲與濱海區沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響沙沉的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路沙沉積分配的回歸計算式,據此可以預估計算河口不同區域沙的沉量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  7. This article introduces the silt geology platform afterwards uses the powder spurts and the plastics drain off water the board and grille and back pressure protects etc design and the construction control of measure, the construction has the guidance meaning to the construction of the bridge abutment soft base

    摘要介紹了地質臺后採用粉噴樁、塑料排板、土工格柵、反壓護等措施的設計與施工控制,對臺后軟基處治工程的施工有指導意義。
  8. In addition, the microcosmic stream, especially suspended load ( mainly suspended soils and sands ) reflected on the characteristic of transported sands " streams, and always silt up and form shoal in the place where the stream velocity is lower and river steam return easy

    的微觀流,特別是懸浮物(主要是懸浮沙)反映輸沙積特性,總是在流速緩慢、易迴流的地方積、形成新生沙洲,為正在發生及將來發生的河積和演變打下基礎。
  9. Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering

    摘要針對洞庭湖區的洪組成、沙演變、河湖泊系分佈特點以及河湖泊疏浚工程布局情況,利用gis技術模擬洞庭湖地形變化,採用有限體積法建立了湖泊二維力學計算模型預測疏浚工程實施后的位、流量、流速流場變化,為河、航港口整治、河疏浚清等工程決策與實施提供了可靠理論依據。
  10. According to the test results from the yellow river water - sediment regulation, especially the first test, e paper analyzes the results of the scouring or deposition in the lower river and the area of the river - mouth bar, the adjustment of the channel morphology, the effect of channel regulation and the changes of flowing capacity of the lower reaches

    根據這兩次黃河調調沙試驗成果,特別是首次調調沙試驗成果,對下遊河效果、河口攔門沙區沙沖量及其分佈、河勢調整、整治工程作用及河過流能力變化進行了分析。
  11. The ncd representatives then gratefully guided us to the hurricane - ravaged areas, which included several villages. however, access to one village of about 300 residents was fraught with danger due to high water and mud flows

    民防署幾位代表滿懷感激地帶領我們前往災區,然而大約有將近300位居民散居的一些村落,對外通卻因洪的威脅而充滿危險。
  12. For the area of tianjin port which is short of sandy material, cement solidified soil, used as a new type of fill material, can not only help reduce the long distance transportation of sand fill, save energy and cut down engineering cost, but also make full use of the mucky clay dredged from basins and waterways

    摘要採用固化土作為新的充填材料,對于缺少砂土的天津港地區,不僅可以減少砂料長途運輸,節省能源,降低工程造價,而且可以充分利用港池和航開挖的質粘土。
  13. The results indicated that with the change of water and sand condition and the altitude of tongguan and the development of the industry and agriculture in recent decades, the water environment of wei river had changed largely, which were shown as follow : annual runoff and seasonal flood decreased sharply ; water stream of large discharge decreased and the range of runoff decreased greatly ; sediment load per year decreased generally, sediment concentration of water increased, and the sand silting up was serious ; water channel swung and shrank, and water regime deteriorated ; frequencies of big floods decreased obviously, and hyper concentrated flood increased obviously ; water levels of the same runoff rose universally, and the frequencies of the floods increased and aggravated ; water pollution was very serious

    結果表明,近期隨著沙條件、潼關高程等的變化及工農業的發展,渭河的環境發生了巨大變化,表現在年量及汛期量銳減;大流量級流出現次數減少,量減少幅度大;年輸沙量總體減少,河含沙量增大,積嚴重;河向擺動型發展,河萎縮,河勢惡化;大洪發生的次數顯著減少,高含沙小洪明顯增多;同流量洪位普遍抬高,洪災發生次數增加,洪災加重;質污染極為嚴重。
  14. It proposes that under the drying climate background, the lakes disappeared mainly because that : firstly clay and sand silted up by the yellow river flooding ; secondly human activities generated great effects

    認為在氣候變乾的大背景下,湖泊消失的原因主要有兩個:一是黃河泛濫所造成的小清河流域的積;二是疏浚河、圍湖造田、過渡利用資源等人類活動的影響。
  15. This article introduced the method of geological investigation of nanling tunnel karst disease, elaborated the tunnel engineering geology conditions, especially the karst water, the karst water power channel and the harm of karst water, and analyzed the cause that produced the karst disease

    摘要南嶺隧巖溶地下活動造成地表坍陷、洞內塞等病害,其原因在於隧施工遺留的導洞長期疏排巖溶,採用地質測繪、物探、鉆探、文地質試驗等綜合勘察方法,查明地下位置、地下流速、流向,針對病害原因,提出攔截、封團、疏排、填充等綜合整治方案。
  16. The passage is entirely silted up

    完全被堵塞了。
  17. In the research on jingtang harbour the co - action of wave and current with movable trubid water model was firstly considerd

    京唐港入海航問題試驗研究,蘇州工業園區華能發電廠冷卻試驗研究,曹妃甸潮汐流和沙問題數模和物模研究。
  18. By means of prototype observation, analysis and numerical model the author analyzed the canal scour and sediment process, the different scour and sediment affected on the discharge and affected on materials movement in different cross sections of the canal

    本文採用原型觀測、資料分析和數學模型對北引渠形態的演變過程,不同沖形態對過能力的影響,斷面形態的穩定性對沙輸移的影響進行了研究。
  19. 2. calculating and analyzing the scouring and filling up of engineering across section by using two - dimensions water and sand mathematics model which is put forward in this paper. the result provides foundation for engineering designing

    ( 2 )提出利用二維流、沙數學模型計算分析了在出現極端情下,工程過江斷面沖的情況,為隧穿越長江的軸線設計提供了依據。
  20. At present, many fields remain to further research, especially the profound combination of gis technique with ece ( estuarine and coastal engineering ), which should be developed for the purposes as follows : ( 1 ) to serve the huge comprehensive work in changeable natural conditions and difficult construction conditions which takes a long period and covers a large region, e. g. the regulation work of deepwater channel in the yre ( yangtze river estuary ) ( 2 ) to combine the gis with applied numerical model ( 3 ) to study the hydrodynamic processes and characteristics of waves, tidal currents and sediment transport, as well as the affection carried by the regulation work in an estuary ( 4 ) to monitor and to analyze ees ( evolution of erosion and sedimentation ) and the variation of riverbed ( 5 ) to play a role of dynamic supervising of a engineering project

    目前尚有許多有待進一步研究的領域,尤其是以服務于長江口深治理這樣規模大、周期長、影響區域廣、自然條件復雜、施工情況多變的國家重點工程為目的,將gis與專業應用數學模型結合,對河口海岸波浪、潮流、沙運動的動力機制,以及整治工程建築物對其影響的研究,對入海航和河勢演變的監測分析,對施工進展和工程效果實現「動態」監控和管理,尚缺乏同gis技術的深入有效結合。
分享友人