水道工程 的英文怎麼說

中文拼音 [shuǐdàogōngchéng]
水道工程 英文
waterway engineering
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 水道 : water channel; channel; waterway; watercourse; water carrier; water race; water lane; klong; lago...
  1. After acquiring the land for the hsinchu station, the following public construction projects will be conducted : transportation system such as road engineering, sidewalk and accommodation road, land preparation, sewerage system, foul sewer, common duct and landscaping

    交通運輸系統路步停車場專用等整地共同管及景觀綠美化等。
  2. Strip - shape underground structures such as the tunnels and tubes for various uses can be treated as a beam on elastic foundation under earthquake condition , although there exists soil - structure interaction , the foundation soil vibration is dominant in other words , analysis of earthquake response of the soil is essential to this end , simplified models , ( i. e equivalent mass system models based on some equivalence criteria ) are proposed , instead of a general 3 - d continuum model in this study , equivalence criteria are proposed and the simplified models are compared the single - mass - string model is proved to be valid and therefore applied to the analysis of earthquake response of the pearl river immersed tunnel

    條裝地下結構如隧、各種埋設管等一般可看作彈性地基梁進行靜力及動力分析在地震條件下,結構與土相互作用,但土的振動成為主要因素為分析土的地震響應需把基土這一三維連續體作簡化處理,簡化成為等效多質點模型本文著重探討這種簡化模型的建立方法,推導等效方,通過幾種簡化體系的分析比較,論證單質點串體系的合理性,並將其應用到廣州黃沙芳村珠江下隧的地震響應分析,為抗震設計提供依據
  3. Lama exper in evaluation, planning, edsign, environmental appraise, engineering cost, inspection and relative scientific research subject advisory of haror, wharf, breakwater, and slipway project in prot and waterway engineering

    擅長對中的港口、碼頭、防波堤、船臺、滑項目的評估、規劃、設計、環境評價、造價、監理及有關科研課題的咨詢。
  4. Design of spillway in quting reservoir

    曲亭庫溢洪設計
  5. The excavation on the left side of xiangjiaba hydropower plant would form the large - scale artificial slope, which refers to the main project near the source of the river and the project of intake sea - route near the mouth of the river, and its height would reach 150 meters

    向家壩電站左岸開挖將形成規模較大的人高邊坡,涉及上游段的主體和下游段的引航邊坡的高度達150m 。
  6. Taking bench shooting of the shuibuya yihongbao project as example, it makes use of the digital television system of drilling overall - hole wall to actually measure, the testing result of lateral fractural range is 4 - 5m, and that of bottom fractural range is about 3m

    本文試驗作是以布埡溢洪梯段爆破為實例,採用鉆孔全孔壁數字電視系統對混裝乳化炸藥爆破破裂范圍進行了實際測試,測試結果為:側向破裂范圍為4 5m ,底部破裂范圍值為3m 。
  7. This pond has not been dredged for over 10 years and the channels have now been colonised and blocked by tall reeds

    過去10年該塘均沒進行疏,現今某些通已被長長的蘆葦阻塞。
  8. Recent years, with the full - blown development of the prestressed concrete technique, the prestressed technique with ring - like strands as the professional technique adapted to the penstock, has been applied to many civil engineering fields such as tunnels and surge shafts in civil engineering hydraulics and power engineering, containment shells of nuclear power station, industrial storage bunkers, digesters and conservation pools in municipal engineering

    近年來,隨著預應力混凝土技術的成熟化發展,環形預應力作為適應壓力管結構形式的專業技術,廣泛應用於隧洞和調壓井、核電站安全殼、業儲料倉、市政消化池和蓄池等諸多領域。目前,預應力混凝土壓力管已得到了越來越多的重視和研究。
  9. Engineering technical specification for sewage pipeline discharging into the sea

    排海管技術規范
  10. Water main diversion works

    管改
  11. And some ancillary equipment such as : dosing units, feeding systems etc., they allow to operate in the most different job - site conditions : from large tunnels to small caverns and mining, from swimming pools construction to large channels maintenance

    另外還有一些輔助設備,如測量設備,上料設備等。該類機器被廣泛使用到礦山鐵公路隧巖土地下建築地鐵和市政基礎設施建設中。
  12. If provided with high pressure pump and water gun, it can make up a hydraulic mechanized earth work unit, used for ground leveling, dredging in rivers and pools, digging, excavation and transportation in small hydraulic engineering, as well as the air defense and underground project in cities

    若與高壓泵,槍配合,組成力機械化土方機組,就可用作于土地平整,河與池塘的疏浚、鑿開等小型的挖方與輸方,以及城市的防空,地下
  13. Main contents including agriculture, forestry, animal husbandry, greenhouse farming and processing industries etc. were studied seriously. in chapter four, the author analyzed the scale, structure and investment schedule of the construction projects in the sic - tech district, and evaluated the economic effect of projects

    主要內容包括以林、草、畜、設施農業及加業開發的目標、任務和規模;總體規劃的技術經濟指標和控制指標,土地開發利用、管理中心布局和生產構成,、防護林體系、路、交通、附屬設施建設等方面。
  14. Combining economics, management, sociology and relative foreign researches, it presents organizing theory, principle and methodology in resettlement operation plan which were practiced in huai river project ( yancheng city ) with obvious effects. it also argues that resettlement management including funds management, contract management, project management and necessary procedures like compensation public notice, resettlement funds responsibilities, resettlement process & safety responsibilities, acceptance testing and resettlement evaluation have great importance in resettlement works of huai river project ( yancheng city )

    本論文的成果主要體現在:在借鑒國內外庫移民研究成果的基礎上,運用經濟學、管理學、社會學的理論,對河移民安置的理論和實踐及其移民的特點進行了深入的研究,提出了河移民安置實施規劃的編制理論、原則及方法,並將成果直接運用於淮河入海水道工程(鹽城段)移民安置實施規劃中,規劃成果直接運用於生產實踐,取得了明顯的效果。
  15. Speaking at a ceremony to mark the completion of works on the main drainage channels for river indus, river beas and river sutlej, the director of territory development, mr wong hung - kin, said today ( september 17 ) that the works for these three rivers in the river indus basin were sizable and entailed the straightening and widening of some 9km of existing meandering rivers with raised river embankments. the works also included the re - provisioning of existing facilities that were affected by the projects such as the reconstruction of 12 river - crossing bridges

    拓展署署長黃鴻堅今日(九月十七日)在梧桐河、雙魚河及石上河主要排水道工程典禮上致辭時表示,整項梧桐河盆地的治河涉及上述三條位於新界北區的主要河,規模龐大,新河總長約9公里,將原來迂迴曲折的河拉直及擴闊,並且將河堤加高及重置受影響的原有設施,包括12條過河橋梁。
  16. Responsible for such affairs as normal administrative management of the administrative office, legal system, lawsuits, state compensation, news, research and evaluation, documents, sendingreceiving services, stamps, affair management, purchasing, archive, information management, comprehensive design planning, town affair meeting, office buildings and safety, assistance in housing construction, serving the people and affairs for which other departments are not responsible

    務課關于營建管理、土木、都市計劃、雨及污水道工程、公共設施、交通、利、區段徵收、簡易自來、小型排設施、違章建築查報處理等事項。
  17. After acquiring the land for the hsr chiayi station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, water engineering, foul sewer, public illumination, traditional piping and bridge work

    高鐵嘉義車站特定區區段徵收公共項目包括:整地水道工程公共照明交通設施停車場水道工程共同管自來及相關管線埋設等。
  18. After acquiring the land for the hsr tainan station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, public illumination, transportation facilities, parking lot, foul sewer, common duct, water engineering and piping

    高鐵臺南車站特定區區段徵收公共項目包括:整地水道工程公共照明交通設施停車場水道工程共同管自來及相關管線埋設等。
  19. After acquiring the land for the hsr taoyuan station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, public illumination, transportation facilities, parking lot, foul sewer, irrigation, transplanting, common duct, water engineering, piping and bridge work

    高鐵桃園車站特定區區段徵收公共項目包括:整地水道工程公共照明交通設施停車場水道工程灌溉植栽移植共同管自來相關管線埋設及橋梁等。
  20. Steep, stony hill streams occur widely, but few lowland streams have escaped from severe human impacts e. g. pollution, channelisation, etc. programme

    到處可見陡峭及布滿石卵的山澗,但甚少低地溪流能逃過污染及水道工程等人為活動的嚴重影響。
分享友人