水道測量表 的英文怎麼說

中文拼音 [shuǐdàoliángbiǎo]
水道測量表 英文
hydrographictable
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ名詞1 (外面;外表) outside; surface; external 2 (中表親戚) the relationship between the child...
  • 水道 : water channel; channel; waterway; watercourse; water carrier; water race; water lane; klong; lago...
  • 量表 : scale量表程序 scalogram
  1. Road and airfield surface characteristics - test methods - part 3 : measurement of pavement surface horizontal drainability

    路和機場面特徵.試驗方法.第3部分:路面平排能力的
  2. In this paper, we study the most serious damming section of the east - one main canal, which is from the entrance of the hao wan flume ( chainage12 + 123. 6 ) to the exit of shang tian yuan tunnel ( chainage24 + 091. 1 ). the main content is analyzing the flow characteristic of the canal, setting up mathematical model of the discharge condition of the east - one main canal, according to the survey section and actual roughness factors, building, bend and so on, we divided the canal into more than loocaculation segments. each segment is calculated by microsoft excel electrical table through computer as permanent transition flow of non - prismatic channel

    本論文研究的渠段為陸渾灌區東一乾渠壅最為嚴重的渠段,從郝灣渡槽進口(樁號12 + 123 . 6 )至上天院隧洞出口(樁號24 + 091 . 1 ) ,其主要內容是,分析渠流特徵,建立東一乾渠輸狀況的數學模型,根據斷面及實際糙率、建築物、彎等因素的不同,將渠劃分成120多個計算段,每段按非稜柱體恆定漸變流,運用microsoftexcel電子格進行編程計算。
  3. Chapter two ascertains main technological factor of dong gou lock reconstructing, including forecast the cargo and volume through the lock to reason about representative type of vessel designed for through the lock and its operation organize. chapter three design the renovate engineering through ascertaining the main technological factor scale of the lock, dimension, designed water level and altitude, including design of structure of the lock, lock chamber and lock gate, and select the main technological factor and pattern of headstock gear. chapter four draws a comprehensive compare of the two design scheme of the renovate project with engineering project economy evaluation method, and makes out the recommended scheme, and furthermore, to calculate the economic evaluation index of the recommended scheme and makes the economic sensitivity analysis of the scheme and finally demonstrate economic feasibility of the scheme

    本論文共分四章:第一章主要介紹了原東溝船閘的地理位置和營運現狀,說明了船閘在航建設和資源綜合利用中的作用及東溝船閘改造的必要性;第二章東溝船閘改造的主要技術因素確定其中包括東溝船閘過閘貨種和貨運發展的預,並確定東溝船閘的設計代船型及營運組織;第三章東溝船閘改造工程設計本章通過船閘改造工程主要技術參數:船閘規模、尺度、設計位和高程等的確定,設計了二個船閘改造方案,包括鋼筋混凝土整體塢式閘首結構、閘室和閘門的設計,並選定了啟閉機的主要技術參數和型式;第四章採用了工程項目經濟評估方法對東溝船閘改造工程二個設計方案進行全面綜合比較后,確定了推薦方案。
  4. Abstract : the synthesis, adsorptive properties and some other mechanical properties of a kind of high water - adsorbing fiber were studied, paper made from this high water - adsorbing fiber beaten with 80 % ( wt ) cotton, demonstrated that the fiber had rap id adsorption, high adsorptive capacity and holding capacity for all of distilled water, main - water and man - made urea, and had suitable mechanical properties to be used to make high water - adsorbing paper

    文摘:本文報了一種高吸纖維的合成、吸性能及其部分物理機械性能,並利用這種高吸纖維與純棉纖維按1 : 4的比例進行混合打槳而製成一種高吸紙,對這種吸紙也進行了吸性能及部分機械性能的定,結果明所合成的高吸纖維對蒸餾,自來及人工尿液的吸附速度快,吸收高,並且可在一定的壓力下保持較高的吸,還可以與棉纖維混合成紙。
  5. Surface settlement is due to layer losses and the layer losses are due to the changes of stress state and water content. it is necessary to probe into the principle, but to pay more attention to the aftermath of layer losses - surface settlement and its regularity. this paper has focused on discussing about the regularity of surface settlement in tunneling construction

    之所以發生沉降,是因為發生了地層損失,而地層損失主要是由於土的應力狀態和土的含發生了變化,機理的探討是必要的,但是人們更關心地層損失造成的後果?地沉降,更關心地沉降的規律性,本文討論了隧施工過程中地沉降的規律,將隧施工方法分為盾構法和礦山法兩種,結合理論分析和實結果,分別給出了地沉降曲線和沉降范圍的經驗公式,其結論對北京地鐵隧的設計與施工具有重要的參考價值。
  6. The latter measurements provide definitive evidence that mercury ' s magnetosphere ? despite its small size ? is not a vacuum but hosts significant densities of heated solar wind plasma

    後者提供確切的證據明,星的磁層-盡管它體積小-是不是一個真空,但東主密度顯著激烈的太陽風等離子體。
  7. Measurement of water flow in closed conduits. meters for cold potable water. combination meters. part 2 : installation requirements

    封閉管定.飲用冷.結合.第2部分:安裝要求
  8. Measurement of water flow in closed conduits. meters for cold potable water. combination meters. part 1 : specifications

    封閉導管.冷飲用.組合.第1部分:規范
  9. Road and airfield surface characteristics - test methods - measurement of pavement surface horizontal drainability

    路和飛機場面特徵.試驗方法.路面平排性的
  10. Double pressure measuring instruments contain two separate measuring systems that are independent of one another which in one instrument display, for example, the brake pipe pressure and the reservoir pressure

    應用於軌機車和卡車的氣壓制動器設備上的壓力技術擁有雙值的壓力,一個儀器中包含兩個獨立的系統。例如,制動管壓力和蓄池壓力。
  11. Climatic mean map, it is further confirmed that it s a good approach to retrieve the equatorial zonal circulation by using the ir indicate ascending branch and wv indicate descending branch channels. the definition of the index of zonal circulation with the olr and fwv are presented and the 17 years mean annual and seasonal equatorial circulation are drawn. the climatic characteristics of the equatorial zonal circulation are analyzed in detail. consequently the fore results of the other observation are corrected

    通過波耳茲曼公式換算得到的6 . 7m汽輻射通密度,以便於與olr比較與ncep再分析的500hpa的年氣候平均圖進行比較,分析其異同,進一步證明了用衛星觀的紅外,汽雙通olr示上升運動, fwv示下沉運動去反演緯向垂直環流是一個極好的途徑。
  12. Prototype observation and model experiment indicate that flows in two channels of the discharge passage of an axial - flow pump and a guide vane mixed - flow pump are unequal to each other, there is flow deviation

    摘要原型觀和模型試驗都明,軸流泵和導葉式混流泵雙孔出兩孔流不等,存在偏流。
  13. The tunnel ' s largest watering quantity is 4220. 9m3 / d ( 6 ) the test, inspecting system and the computing showing that, the rock ( iv ) in high crustal stress segment has the rock quality and stress condition to happen light rockburst

    最大涌為4220 . 9m ~ 3 d 。 ( 6 )試驗、試與計算明,隧在高地應力地段的類圍巖中存在發生輕微巖爆的巖性及地應力條件。
  14. With the development of tunnel support design theory, new austrian tunneling method has become representation of modern support theory. especially, because of the application of local monitoring measurement and its combining with theory analysis, new austrian tunneling method has developed into a new design method - local monitoring method ( observational method ) adapting to the characteristic of underground project and current technique degree

    隨著隧支護設計理論不斷發展,新奧法成為現代支護理論的典型代,尤其是現場監控的應用,並與理論分析結合,發展為一種適應地下工程特點的和當前技術平的新的設計方法?現場監控設計方法(信息化設計方法) 。
分享友人