水道測量部 的英文怎麼說

中文拼音 [shuǐdàoliáng]
水道測量部 英文
hydrographic department
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • 水道 : water channel; channel; waterway; watercourse; water carrier; water race; water lane; klong; lago...
  • 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
  1. First, according to measured data and literature, the river channel evolution rule and its reasons in the southern branch of the yangtze river are discussed from the perspectives of historic evolution, recent evolution and the tendency prediction of river channel evolution. besides, the local reservoir has been studied from the changes in thalweg and section as well as the calculation of local erosion and deposit. consequently, the stability and feasibility of reservoir construction in the river section are approved

    首先根據大資料及文獻資料,就歷史變遷、近期演變、河演趨勢預等方面,初步探討了長江口南支河段河演變規律及原因,並具體就深泓線的變化、主槽斷面變化、局沖淤計算等方面對擬建庫局區域進行了分析,論證了工程河段建設庫的穩定性及可行性。
  2. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河淤積的影響進行了定分析: (一扣根據實資料首次建立了河贖流路泥沙沉積分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙與造陸面積的相關關系,得出了當河口多年平均來沙維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  3. United states navy hydrographic office

    美國海軍航局美國海軍水道測量部
  4. Road and airfield surface characteristics - test methods - part 3 : measurement of pavement surface horizontal drainability

    路和機場表面特徵.試驗方法.第3分:路面表層平排能力的
  5. The paper analyzes the distinct status of various types of electronic chart fitted onboard in comparison with the requirements of electronic chart by solas, and brings forward some suggestions to deal with this situation for maritime regulators, shipping companies and training institutes

    摘要結合solas公約時電子海圖的要求,對電子海圖顯示與信息系統進行確切定義,分析了目前船舶配備的各類電于海圖系統的不同地位,提出我國海事門、水道測量部門、航運企業、培訓機構應對電子海圖配備及早採取措施。
  6. Methods for measurement of fluid flow in closed conduits, using tracers - measurement of water flow - transit time method using radioactive tracers

    密封管中流體流的示蹤劑法.第1分:.第5節:放射性示蹤劑渡越時間法
  7. Methods for measurement of fluid flow in closed conduits, using tracers - measurement of water flow - general

    密封管中流體流的示蹤劑法.第1分:.第1節:總則
  8. Measurement of water flow in closed conduits. tracer methods. part vii : transit time method using radioactive tracers

    密封管.示蹤法.第7分:放射性示蹤器的躍遷時間法
  9. Measurement of water flow in closed conduits. tracer methods part i : general

    密封管定.示蹤法.第1分:綜合
  10. Measurement of water flow in closed conduits. tracer methods - par vi : transit time method using non - radioactive tracers

    密封管定.示蹤法.第6分:非放射性示蹤物的轉移時間法
  11. Measurement of water flow in closed conduits. tracer methods part ii : constant rate injection method using non - radioactive tracers

    密封管定.示蹤法.第2分:使用非放射性示蹤物的恆速率噴射法
  12. Road testing. measurement of the rate of hydraulic binders and additives in the cementitious materials. part 1 : chemical method for the determination of the cement content in a new mixed material

    路試驗.粘結性材料中壓粘合劑和添加劑比率.第1分:新混材料中膠接劑含定的化學方法
  13. Abstract : the synthesis, adsorptive properties and some other mechanical properties of a kind of high water - adsorbing fiber were studied, paper made from this high water - adsorbing fiber beaten with 80 % ( wt ) cotton, demonstrated that the fiber had rap id adsorption, high adsorptive capacity and holding capacity for all of distilled water, main - water and man - made urea, and had suitable mechanical properties to be used to make high water - adsorbing paper

    文摘:本文報了一種高吸纖維的合成、吸性能及其分物理機械性能,並利用這種高吸纖維與純棉纖維按1 : 4的比例進行混合打槳而製成一種高吸紙,對這種吸紙也進行了吸性能及分機械性能的定,結果表明所合成的高吸纖維對蒸餾,自來及人工尿液的吸附速度快,吸收高,並且可在一定的壓力下保持較高的吸,還可以與棉纖維混合成紙。
  14. Measurement of fluid flow in closed conduits - velocity area methods - method of measurement of clean water flow using current meters in full conduits and under regular flow conditions

    封閉管內液體流.第2分:速度范圍法.第4節:正常流動條件下利用全流動導管中的流清潔的方法
  15. On the basis of forecast model of traffic volume discussing, the mathematic model for the basic parts of road overpass was built up through the research on main mathematical model which suit for overpass in four - stage forecast method. according to the properties and the requirements of the user, by working on the service level, the standard of service level has been defined. the adaptability index of traffic for road overpass was put forward and an adaptability index of traffic system was established

    本文系統研究了路立體交叉的類型,從不同角度對立交類型進行了劃分,在詳細論述立交交通模型的基礎上,針對四階段預法中適合立交特點的主要數學模型做了深入研究,建立了路立交各基本組成分通行能力的數學模型,並按照立交的性質及人們對立交的要求,對立交服務平進了研究,確立了路立交的服務平標準,提出了路立交交通適應性指標,建立了路立交適應性指標體系,並由多人層次分析法確定了各指標的相對權重。
  16. The example analyzed in this thesis is the traffic impact analyzing for " reconstruction for commercial pedestrian street on chunxi road in chengdu city ", which belongs to the redevelopment of outdated city proper. having the present traffic situation through live investigation and predicting the promotive traffic flow after redevelopment, distributed in the road network, utilizing the method of artraction rate, the author obtain the service level after redevelopment to determine the necessity of reconstruction and presents some plans for redevelopment as well

    在擁有大數據的基礎上,應用實施tia的方法,通過吸引率法預改造后的誘增交通,獲得服務平的變化,從而提出了與商業圈相關路的改建方案:讓過境交通從步行街區外圍通過;將紅星路、東大街拓寬改善;署襪街、新街限時機動車通行;盡減少商業圈內機動車停車場,鼓勵周邊建造。
  17. This will meet the low demand projections up to the opening of the swc, but will only be sufficient to serve the medium demand projections for a few years

    這通車只能滿足深港西通車之前的低平預需求,如果中平的預需求出現的話,則通車只能應付數年的交通流
  18. Methods for measurement of fluid flow in closed conduits, using tracers - measurement of water flow - transit time method using non - radioactive tracers

    密封管中流體流的示蹤劑法.第1分:.第4節:非放射性示蹤劑渡越時間法
  19. Measurement of water flow in closed conduits. meters for cold potable water. combination meters. part 2 : installation requirements

    封閉管定.飲用冷表.結合表.第2分:安裝要求
  20. Measurement of water flow in closed conduits. meters for cold potable water. combination meters. part 1 : specifications

    封閉導管.冷飲用表.組合表.第1分:規范
分享友人